P3M Framework

Agenda
Problem Statement
Industry, Public Sector, and Inside the Organization

Definitions and Linkage
PM, PgM, PfM
P3M Framework
Definition and Objectives
P3M Implementation Methodology
Assess, Recommend, Promote, Implement, Operate
Contact Info
Email, Blog, Bio

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
P3M Framework

Problem Statement
Industry and Public Sector

2006 STANDISH GROUP CHAOS
REPORT
46% of application development
projects are “challenged,”
meaning they fail to deliver
results on-time, within budget,
or in scope.
2010 IT PROJECT SUCCESS
SURVEY
Traditional Projects: 47% are
successful, 36% are challenged,
and 17% are failures.

2010 UNITED STATES OFFICE
OF MANAGEMENT AND BUDGET
M-10-25
Too many Government IT
projects cost hundreds of
millions of dollars more than
they should, take years longer
than necessary to deploy, and
deliver technologies that are
obsolete by the time they are
completed.

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
P3M Framework

Problem Statement
Inside the organization

 Lack of standardized project management
processes across the organization
 Project Managers leverage various tools for
tracking projects
 No consistent way of deciding how to
allocate investment resources
 Project costs are tracked at various levels of
detail
 No consistent way of monitoring and
controlling project performance
Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
P3M Framework

Definitions
Project Management (PM) – The application of knowledge, skills, tools
and techniques to project activities to meet project requirements.
Projects are temporary and create a certain product, service, or result.
Consequently, project management has a defined time period and results
that can be determined successful or unsuccessful.
Program Management (PgM) – The centralized management of a group of
related projects to obtain benefits and control not available from
managing them individually. Key themes include Benefits Management,
Stakeholder Management, Financial Management, and Program
Governance
Portfolio Management (PfM) – The centralized management of one or
more portfolios, which includes identifying, prioritizing, authorizing,
managing and controlling programs, projects, or other related work, to
achieve specific business objectives. Key themes include Strategic
Alignment, Value Management, Risk Management, Resource Management,
and Performance Management.

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
P3M Framework

Portfolio, Program, Project Linkage

Portfolio

Executing the
"right" projects

Programs

Projects

Projects

Executing
projects "right"

Projects

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
P3M Framework

P3M Framework Definition and Key Objectives
Project, Program, Portfolio Management (P3M) Framework – A set of policies,
processes, tools, and governance models designed to support organizations in
achieving strategic and tactical benefits from their investments in projects,
programs, and portfolios.
P3M Objectives
• Transparency – Line of sight into decisions, performance, and benefits
• Accountability – Ownership and decision-making thresholds defined and
governed
• Compliance – Comply with organizational and public sector policies, regulations,
and guidelines
• Cost Savings – Eliminate wasteful spending, out-of-control execution, reinvention, and disconnected operations
• Funds Optimization – Obtain optimal benefits for amount budgeted and
expended
• Benefits Realization – Achieve the intended benefits as described in the business
case

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
P3M Framework

P3M Framework Lifecycle

*PgM and PM lifecycles aligned with PMI

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
P3M Framework

P3M Framework Implementation Methodology

Supports continuous
improvement to meet
defined outcomes

Are we
getting the
benefits?

Are we
doing the
right
things?

Are we
getting
them done
well?

Operate

Leverages best-inclass people,
process, and
technology

Leverages industry
best practices and
public sector guidelines

Assess

Are we
doing
them the
right way?

Implement

Recommend

Promote

Achieves
leadership and
stakeholder
buy-in and
ownership

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
Assess

P3M Framework

P3M Framework Methodology

Operate

Recommend

Develop a comprehensive view of the current state
Implement

Promote

Are we effectively communicating with
our stakeholders?

Do we have the right
resources on this
effort? Are they
trained/certified?

How are resources being
consumed? What are my
risks across the program?

Are my projects on time,
on schedule, and within scope?
Are they achieving planned
benefits?

How well defined
are our processes?
Are they being used
effectively?

Stakeholders

Resources

Process

Performance Technology

Are we doing the right
things to be successful?
How can we improve?

Are we reducing
costs by
streamlining and
standardizing?
What systems and
applications can we use to
manage our
program/projects in a
consistent, efficient manner?

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
Assess

P3M Framework

P3M Framework Methodology

Operate

Recommend

Leverage industry best practices and public sector guidelines
Implement

Promote

Industry Best Practices
• Software Engineering Institute (SEI) / Capability Maturity Model Integrated (CMMI) – Is a model or collection
of “best practices” that organizations follow to dramatically improve the effectiveness, efficiency, and quality
of their product and service development work.
• Project Management Institute (PMI) – Serves practitioners and organizations with standards that describe
good practices, globally recognized credentials that certify project management expertise, and resources for
professional development, networking and community.
• IT Governance Institute – Helps enterprise leaders understand how effective governance can make IT
successful in supporting the enterprise's mission and goals.
• Knowledge Capital and Experience – Leverage external and internal experience assessing, implementing, and
operating PMOs providing best-in-class people, methodologies, and tools.

Public Sector Best Practices
• United Statement Office of Management and Budget (OMB) Direction - OMB requires agency investment
submissions to be justified by rigid cost/benefit analyses. It further requires that full life cycle costing be
used; full funding for costs must be appropriated in advance; cost, schedule, and performance goals be clearly
identified, achievable, and measured using Earned Value Management (EVM); and, that risks be identified.
Recent guidance requires large IT projects to be implemented in 90 to 120 day increments to achieve benefits
sooner and reduce the risk of schedule and cost overruns.
• United States Government Accountability Office (GAO) IT Investment Management (ITIM) - The ITIM
framework is a maturity model composed of five progressive stages of maturity that an agency can achieve in
its IT investment management capabilities. For each maturity stage, the ITIM describes a set of critical
processes that must be in place for the agency to achieve that stage.

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
Assess

Operate

Recommend

Define current and desired level of P3M maturity
Implement

Promote

Level 5

Level 4

Level 2

Level 1

Defined/Standardized
· Policy, process, and methodology formally established
and communicated for projects, programs, and portfolios
· Programs and projects defined with appropriate business
and technical objectives
· PMO chartered to support the framework
Visible But Reactive
· Management has gained and communicated an awareness of
the need for project management
· Organization is in the process of learning and repeating certain
techniques and methods from project-to-project as needed

Input

Level 3

Measured and Managed
· Formal and standardized P3M metrics collected
to support the portfolio governance process
· Risks, outcomes, benefits, and business
strategy/mission value quantified and managed

Output

Predictive and Optimized
· Proven full life-cycle P3M framework is
implemented, enforced, and integrated into
organizational culture
· Predictive analytics used at all levels of
organization for transparency and accountability
· On-going program to institutionalize best
practices has been implemented

Outcome

P3M Maturity Model

Maturity

P3M Framework

P3M Framework Methodology

Initial/Ad hoc
· Aware of need for project structure and risks of poorly managed projects
· Use of project management techniques left to the individual

Adoption

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
Assess

P3M Framework

P3M Framework Methodology

Operate

Recommend

Develop an opportunity matrix and sequence plan
Implement

Promote

Opportunity Objective

Outcome/Benefit

Timeframe

Provide
consolidated
status and
financial
reporting

Develop and implement standard report
templates and provide procedures for their
use

Consistent information and ability to
rollup results from projects to
programs to portfolios

Short term

Establish a reports repository for historical
reporting and tracking

Ability to show trends which helps
focus on future improvements

Short term

Implement an automated reports
portal/dashboard for all stakeholders to
access and drill down on details

Less resource workload and easily
accessible by stakeholders

Long term

Improve the
ability for
projects to
deliver on
schedule and
on budget
while
meeting
requirements

Develop procedures for developing a project Standardized project schedules which Short term
schedule using WBS, dependencies, and
can be assessed using critical path
resources and require it for all projects
methods and can be viewed across
projects to see resource leveling
issues

Develop procedures and implement a an
Best practice for preventing project
integrated baseline review of all new
issues before the project begins
projects to assess schedule, cost (estimates),
technical, and resource risk

Mid-term

Implement an ANSI 748-b compliant earned Ability to monitor, control, and
Long-term
value management system (EVMS)
forecast scope, schedule, and cost
variance early in the project lifecycle
Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
Assess

P3M Framework

P3M Framework Methodology

Operate

Recommend

Communicate the benefits of P3M to leadership and stakeholders
Implement

Promote

Buy-in
[Sustained Usage of P3M
Framework]

Sustained
communications
to leadership and
stakeholders
selling the value
of P3M

Participation
[ Leverage P3M Artifacts]

Commitment
[Stated Desire for Improvement]

Awareness
[Recognition of the Problem]

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
Assess

P3M Framework

P3M Framework Methodology

Operate

Recommend

Perform market research and alternatives analysis
Implement

Total 5-Year Investment

Total 5-Year Investment

Total Year 5 Investment

Total Year 5 Investment

Total Year 4 Investment

Total Year 4 Investment

Total Year 3 Investment

Total Year 3 Investment

Total Year 2 Investment

Total Year 2 Investment

Total Year 1 Investment

Promote

Total Year 1 Investment

$0

$0

$500,000 $1,000,000 $1,500,000 $2,000,000

Planview - Onsite

$5,000,000

Sikich (Assistance PSA) - Onsite

PlanView - SaaS

Total 5-Year Investment

Total Year 5 Investment

Total Year 4 Investment

Total Year 4 Investment

Total Year 3 Investment

Total Year 3 Investment

Total Year 2 Investment

Total Year 2 Investment

Total Year 1 Investment

Sikich (Assistance PSA) - SaaS

Total 5-Year Investment

Total Year 5 Investment

$10,000,000

Total Year 1 Investment
$0

$2,000,000

Tenrox - Onsite

$4,000,000

Tenrox - SaaS

$6,000,000

$0

$400,000

Unanet - Onsite

$800,000

$1,200,000

Unanet - SaaS

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
Assess

P3M Framework

P3M Framework Methodology

Operate

Recommend

Stand up organization structure and charter governance bodies
Implement

Vision/
Mission

C-Suite/
Office of the Director

Strategic
Alignment

Line of Business/
Program Office

Promote

Board of Directors/
Oversight Agency

Executive Steering
Committee

Strategic Initiatives
Business
Alignment

Initiative
Initiative

Initiative
Initiative

Program
Management
Office (PMO)

Investment Review
Board

Portfolio
Benefits
Alignment

Program/Projects

Program/Project
Advisory Board

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
Assess

P3M Framework

P3M Framework Methodology

Operate

Recommend

Achieve small successes first, then increase complexity, risk, & benefits
Implement

Promote

Program Management

Initiate

Plan

Execute, Monitor, and Control

Closeout

Iterations
- Charter
- Market
research
- Alternatives
- Business case
- Acquisition

Implementation

Requirements

Design

Build

Test

Deploy

Maintain/
Operate

Successfully
Migrate to
the To-Be
Vision and
Realize Key
Benefits that
Achieve the
Business
Strategy

Iterations

- Inventory projects, resources,
skills
- Develop policies, standards,
procedures, templates
- Analyze and plan for data clean
up and conversion

Transformation
Define
Application
Process/
Workflow

Define
Configuration
Values

Develop UAT
Test
Scenarios/
Scripts

Develop and
Execute
Training

Iterations
- Identify Stakeholders and
Communications Plan
- Develop Comm and CM Plans

Communication and Change Management
Execute Communication and Change Management
Iterations

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
Assess

P3M Framework

P3M Framework Methodology

Operate

Recommend

Support operations, stakeholders, and governance
Implement

Promote

* Representative graphic from http://www.planview.com

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com
P3M Framework

Contact Information
Robert M. Buhrman, PMP, PgMP, CSM, ITIL
rbuhrman@KoreFederal.com
Mr. Buhrman has over 16 years experience in IT and management consulting in both the
commercial and public sector. He was most recently the program manager for a large business
management improvement program, helping to transform a $800 million fee-for-service
Federal program into a best-in-class service delivery organization. He has led several
implementations of performance and project management solutions providing key insights and
improvement to customers’ business. Mr. Buhrman also has experience supporting
organizations with their migration to modernized systems including PMO and acquisition
support tasks. In addition, he has experience performing assessments of project performance
including the areas of planning, quality, and process assessments.
Mr. Buhrman’s implementation experience spans the full systems development lifecycle,
including planning, requirements, design, development/configuration, testing, training,
deployment, sustainment, and project management activities in support of enterprise resource
planning (ERP), commercial off-the-shelf (COTS), and custom-built enterprise solutions. He also
recently led a project management team supporting Agile development.
Mr. Buhrman is one of a small number of Project Management Institute (PMI) certified Program
Management Professionals (PgMP)® worldwide. He also is a certified Project Management
Professional (PMP)® since 2005 and a certified ScrumMaster® since 2011.

Rob Buhrman, PMP, PgMP, CSM, ITIL
robbuhrman@gmail.com

More Related Content

What's hot

Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15Liana Underwood
 
PMO Kick-Off Presentation
PMO Kick-Off PresentationPMO Kick-Off Presentation
PMO Kick-Off PresentationEbru Seiwert
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)Anand Subramaniam
 
Pc 2011 Epmo Plan
Pc 2011 Epmo PlanPc 2011 Epmo Plan
Pc 2011 Epmo Plantigcap
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Hussain Bandukwala
 
PMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMOPMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMOAnthony Natoli
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMOBusiness Beam
 
Creating & Maturing a PMO
Creating & Maturing a PMOCreating & Maturing a PMO
Creating & Maturing a PMOSyed Raashid
 
PMO Charter Template
PMO Charter TemplatePMO Charter Template
PMO Charter TemplateDemand Metric
 
Business PMO & IT Pmo What Is The Difference
Business PMO & IT Pmo What Is The DifferenceBusiness PMO & IT Pmo What Is The Difference
Business PMO & IT Pmo What Is The DifferenceStefan Rank
 
PMO and Project Portfolio Management
PMO and Project Portfolio ManagementPMO and Project Portfolio Management
PMO and Project Portfolio ManagementDiana Rusnakova
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsMaria Erland, PMP
 
Program Management Playbook
Program Management PlaybookProgram Management Playbook
Program Management PlaybookLenovo
 
Project management basics
Project management basicsProject management basics
Project management basicsPlanning School
 

What's hot (20)

Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15
Melissa Highley presents: Portfolio Management for Everyone 21 Jan v15
 
PMO Kick-Off Presentation
PMO Kick-Off PresentationPMO Kick-Off Presentation
PMO Kick-Off Presentation
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
Pc 2011 Epmo Plan
Pc 2011 Epmo PlanPc 2011 Epmo Plan
Pc 2011 Epmo Plan
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)
 
PMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMOPMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMO
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMO
 
Real example of PMO deployment
Real example of PMO deploymentReal example of PMO deployment
Real example of PMO deployment
 
Creating & Maturing a PMO
Creating & Maturing a PMOCreating & Maturing a PMO
Creating & Maturing a PMO
 
PMO Charter Template
PMO Charter TemplatePMO Charter Template
PMO Charter Template
 
PMO 101
PMO 101PMO 101
PMO 101
 
Business PMO & IT Pmo What Is The Difference
Business PMO & IT Pmo What Is The DifferenceBusiness PMO & IT Pmo What Is The Difference
Business PMO & IT Pmo What Is The Difference
 
Project portfolio management
Project portfolio managementProject portfolio management
Project portfolio management
 
PMO and Project Portfolio Management
PMO and Project Portfolio ManagementPMO and Project Portfolio Management
PMO and Project Portfolio Management
 
Chap 4 Defining A Project
Chap 4 Defining A ProjectChap 4 Defining A Project
Chap 4 Defining A Project
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And Benefits
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
PMO - Delivering Business Results
PMO - Delivering Business ResultsPMO - Delivering Business Results
PMO - Delivering Business Results
 
Program Management Playbook
Program Management PlaybookProgram Management Playbook
Program Management Playbook
 
Project management basics
Project management basicsProject management basics
Project management basics
 

Similar to P3M - Project, Program, Portfolio Management Framework

ePMO Workshop - Ali Kaabi
ePMO Workshop - Ali KaabiePMO Workshop - Ali Kaabi
ePMO Workshop - Ali KaabiAli Kaabi
 
Project Management Office Vol. 1 - One Page Gold Vol. 1
Project Management Office Vol. 1  - One Page Gold Vol. 1Project Management Office Vol. 1  - One Page Gold Vol. 1
Project Management Office Vol. 1 - One Page Gold Vol. 1ken martin
 
Programme control it's not all about the tool-11-10-17
Programme control it's not all about the tool-11-10-17Programme control it's not all about the tool-11-10-17
Programme control it's not all about the tool-11-10-17Nick Wilson
 
P3M3 - Discovery Assessment
P3M3 - Discovery AssessmentP3M3 - Discovery Assessment
P3M3 - Discovery AssessmentProfeo
 
PMO and PPM Best Practices
PMO and PPM Best PracticesPMO and PPM Best Practices
PMO and PPM Best PracticesJeff McClay
 
Sa isej pmi-pmp training (1)
Sa isej  pmi-pmp training (1)Sa isej  pmi-pmp training (1)
Sa isej pmi-pmp training (1)Meghalaya Dhar
 
The role of the project manager based on pmbok6 by mm rahman stm skill that m...
The role of the project manager based on pmbok6 by mm rahman stm skill that m...The role of the project manager based on pmbok6 by mm rahman stm skill that m...
The role of the project manager based on pmbok6 by mm rahman stm skill that m...STM-Skill That Matters
 
PMP Certification Course in Indonesia - Spoclearn
PMP Certification Course in Indonesia - SpoclearnPMP Certification Course in Indonesia - Spoclearn
PMP Certification Course in Indonesia - Spoclearninfoeducationspoc
 
Capm Free Seminar Presentation
Capm Free Seminar PresentationCapm Free Seminar Presentation
Capm Free Seminar PresentationRavindra Kamthe
 
SSCG Project Management Services
SSCG Project Management ServicesSSCG Project Management Services
SSCG Project Management ServicesSSCG Consulting
 
Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)flexibleresources
 
The AtekPC Project Management Office case study.docx
The AtekPC Project Management Office case study.docxThe AtekPC Project Management Office case study.docx
The AtekPC Project Management Office case study.docxssuser13a155
 
Article - Global Project Management
Article - Global Project ManagementArticle - Global Project Management
Article - Global Project ManagementGregory A. Garrett
 
25 BENEFITS OF A PROJECT MANAGEMENT OFFICE
25 BENEFITS OF A PROJECT MANAGEMENT OFFICE25 BENEFITS OF A PROJECT MANAGEMENT OFFICE
25 BENEFITS OF A PROJECT MANAGEMENT OFFICEKenMartin18
 

Similar to P3M - Project, Program, Portfolio Management Framework (20)

ePMO Workshop - Ali Kaabi
ePMO Workshop - Ali KaabiePMO Workshop - Ali Kaabi
ePMO Workshop - Ali Kaabi
 
pmos.pptx
pmos.pptxpmos.pptx
pmos.pptx
 
Project Management Office Vol. 1 - One Page Gold Vol. 1
Project Management Office Vol. 1  - One Page Gold Vol. 1Project Management Office Vol. 1  - One Page Gold Vol. 1
Project Management Office Vol. 1 - One Page Gold Vol. 1
 
Programme control it's not all about the tool-11-10-17
Programme control it's not all about the tool-11-10-17Programme control it's not all about the tool-11-10-17
Programme control it's not all about the tool-11-10-17
 
P3M3 - Discovery Assessment
P3M3 - Discovery AssessmentP3M3 - Discovery Assessment
P3M3 - Discovery Assessment
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
PMO and PPM Best Practices
PMO and PPM Best PracticesPMO and PPM Best Practices
PMO and PPM Best Practices
 
Prime profile pmo
Prime profile pmoPrime profile pmo
Prime profile pmo
 
Sa isej pmi-pmp training (1)
Sa isej  pmi-pmp training (1)Sa isej  pmi-pmp training (1)
Sa isej pmi-pmp training (1)
 
The role of the project manager based on pmbok6 by mm rahman stm skill that m...
The role of the project manager based on pmbok6 by mm rahman stm skill that m...The role of the project manager based on pmbok6 by mm rahman stm skill that m...
The role of the project manager based on pmbok6 by mm rahman stm skill that m...
 
The Next Generation PMO
The Next Generation PMOThe Next Generation PMO
The Next Generation PMO
 
PMP Certification Course in Indonesia - Spoclearn
PMP Certification Course in Indonesia - SpoclearnPMP Certification Course in Indonesia - Spoclearn
PMP Certification Course in Indonesia - Spoclearn
 
Capm Free Seminar Presentation
Capm Free Seminar PresentationCapm Free Seminar Presentation
Capm Free Seminar Presentation
 
SSCG Project Management Services
SSCG Project Management ServicesSSCG Project Management Services
SSCG Project Management Services
 
Program & project management (pmo)
Program & project management (pmo)Program & project management (pmo)
Program & project management (pmo)
 
The AtekPC Project Management Office case study.docx
The AtekPC Project Management Office case study.docxThe AtekPC Project Management Office case study.docx
The AtekPC Project Management Office case study.docx
 
Article - Global Project Management
Article - Global Project ManagementArticle - Global Project Management
Article - Global Project Management
 
PgMP - Introduction to Program Management
PgMP -  Introduction to Program ManagementPgMP -  Introduction to Program Management
PgMP - Introduction to Program Management
 
25 BENEFITS OF A PROJECT MANAGEMENT OFFICE
25 BENEFITS OF A PROJECT MANAGEMENT OFFICE25 BENEFITS OF A PROJECT MANAGEMENT OFFICE
25 BENEFITS OF A PROJECT MANAGEMENT OFFICE
 
Certified Master Project Manager MPM
Certified Master Project Manager MPMCertified Master Project Manager MPM
Certified Master Project Manager MPM
 

Recently uploaded

Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 

Recently uploaded (20)

Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 

P3M - Project, Program, Portfolio Management Framework

  • 1. Project, Program, Portfolio Management (P3M™) Framework Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com This presentation is intended solely for the person or entity to which it was initially provided and contains confidential and privileged information. Any review, dissemination, copying, printing or other use of this presentation by persons or entities without consent of the author is prohibited.
  • 2. P3M Framework Agenda Problem Statement Industry, Public Sector, and Inside the Organization Definitions and Linkage PM, PgM, PfM P3M Framework Definition and Objectives P3M Implementation Methodology Assess, Recommend, Promote, Implement, Operate Contact Info Email, Blog, Bio Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 3. P3M Framework Problem Statement Industry and Public Sector 2006 STANDISH GROUP CHAOS REPORT 46% of application development projects are “challenged,” meaning they fail to deliver results on-time, within budget, or in scope. 2010 IT PROJECT SUCCESS SURVEY Traditional Projects: 47% are successful, 36% are challenged, and 17% are failures. 2010 UNITED STATES OFFICE OF MANAGEMENT AND BUDGET M-10-25 Too many Government IT projects cost hundreds of millions of dollars more than they should, take years longer than necessary to deploy, and deliver technologies that are obsolete by the time they are completed. Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 4. P3M Framework Problem Statement Inside the organization  Lack of standardized project management processes across the organization  Project Managers leverage various tools for tracking projects  No consistent way of deciding how to allocate investment resources  Project costs are tracked at various levels of detail  No consistent way of monitoring and controlling project performance Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 5. P3M Framework Definitions Project Management (PM) – The application of knowledge, skills, tools and techniques to project activities to meet project requirements. Projects are temporary and create a certain product, service, or result. Consequently, project management has a defined time period and results that can be determined successful or unsuccessful. Program Management (PgM) – The centralized management of a group of related projects to obtain benefits and control not available from managing them individually. Key themes include Benefits Management, Stakeholder Management, Financial Management, and Program Governance Portfolio Management (PfM) – The centralized management of one or more portfolios, which includes identifying, prioritizing, authorizing, managing and controlling programs, projects, or other related work, to achieve specific business objectives. Key themes include Strategic Alignment, Value Management, Risk Management, Resource Management, and Performance Management. Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 6. P3M Framework Portfolio, Program, Project Linkage Portfolio Executing the "right" projects Programs Projects Projects Executing projects "right" Projects Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 7. P3M Framework P3M Framework Definition and Key Objectives Project, Program, Portfolio Management (P3M) Framework – A set of policies, processes, tools, and governance models designed to support organizations in achieving strategic and tactical benefits from their investments in projects, programs, and portfolios. P3M Objectives • Transparency – Line of sight into decisions, performance, and benefits • Accountability – Ownership and decision-making thresholds defined and governed • Compliance – Comply with organizational and public sector policies, regulations, and guidelines • Cost Savings – Eliminate wasteful spending, out-of-control execution, reinvention, and disconnected operations • Funds Optimization – Obtain optimal benefits for amount budgeted and expended • Benefits Realization – Achieve the intended benefits as described in the business case Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 8. P3M Framework P3M Framework Lifecycle *PgM and PM lifecycles aligned with PMI Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 9. P3M Framework P3M Framework Implementation Methodology Supports continuous improvement to meet defined outcomes Are we getting the benefits? Are we doing the right things? Are we getting them done well? Operate Leverages best-inclass people, process, and technology Leverages industry best practices and public sector guidelines Assess Are we doing them the right way? Implement Recommend Promote Achieves leadership and stakeholder buy-in and ownership Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 10. Assess P3M Framework P3M Framework Methodology Operate Recommend Develop a comprehensive view of the current state Implement Promote Are we effectively communicating with our stakeholders? Do we have the right resources on this effort? Are they trained/certified? How are resources being consumed? What are my risks across the program? Are my projects on time, on schedule, and within scope? Are they achieving planned benefits? How well defined are our processes? Are they being used effectively? Stakeholders Resources Process Performance Technology Are we doing the right things to be successful? How can we improve? Are we reducing costs by streamlining and standardizing? What systems and applications can we use to manage our program/projects in a consistent, efficient manner? Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 11. Assess P3M Framework P3M Framework Methodology Operate Recommend Leverage industry best practices and public sector guidelines Implement Promote Industry Best Practices • Software Engineering Institute (SEI) / Capability Maturity Model Integrated (CMMI) – Is a model or collection of “best practices” that organizations follow to dramatically improve the effectiveness, efficiency, and quality of their product and service development work. • Project Management Institute (PMI) – Serves practitioners and organizations with standards that describe good practices, globally recognized credentials that certify project management expertise, and resources for professional development, networking and community. • IT Governance Institute – Helps enterprise leaders understand how effective governance can make IT successful in supporting the enterprise's mission and goals. • Knowledge Capital and Experience – Leverage external and internal experience assessing, implementing, and operating PMOs providing best-in-class people, methodologies, and tools. Public Sector Best Practices • United Statement Office of Management and Budget (OMB) Direction - OMB requires agency investment submissions to be justified by rigid cost/benefit analyses. It further requires that full life cycle costing be used; full funding for costs must be appropriated in advance; cost, schedule, and performance goals be clearly identified, achievable, and measured using Earned Value Management (EVM); and, that risks be identified. Recent guidance requires large IT projects to be implemented in 90 to 120 day increments to achieve benefits sooner and reduce the risk of schedule and cost overruns. • United States Government Accountability Office (GAO) IT Investment Management (ITIM) - The ITIM framework is a maturity model composed of five progressive stages of maturity that an agency can achieve in its IT investment management capabilities. For each maturity stage, the ITIM describes a set of critical processes that must be in place for the agency to achieve that stage. Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 12. Assess Operate Recommend Define current and desired level of P3M maturity Implement Promote Level 5 Level 4 Level 2 Level 1 Defined/Standardized · Policy, process, and methodology formally established and communicated for projects, programs, and portfolios · Programs and projects defined with appropriate business and technical objectives · PMO chartered to support the framework Visible But Reactive · Management has gained and communicated an awareness of the need for project management · Organization is in the process of learning and repeating certain techniques and methods from project-to-project as needed Input Level 3 Measured and Managed · Formal and standardized P3M metrics collected to support the portfolio governance process · Risks, outcomes, benefits, and business strategy/mission value quantified and managed Output Predictive and Optimized · Proven full life-cycle P3M framework is implemented, enforced, and integrated into organizational culture · Predictive analytics used at all levels of organization for transparency and accountability · On-going program to institutionalize best practices has been implemented Outcome P3M Maturity Model Maturity P3M Framework P3M Framework Methodology Initial/Ad hoc · Aware of need for project structure and risks of poorly managed projects · Use of project management techniques left to the individual Adoption Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 13. Assess P3M Framework P3M Framework Methodology Operate Recommend Develop an opportunity matrix and sequence plan Implement Promote Opportunity Objective Outcome/Benefit Timeframe Provide consolidated status and financial reporting Develop and implement standard report templates and provide procedures for their use Consistent information and ability to rollup results from projects to programs to portfolios Short term Establish a reports repository for historical reporting and tracking Ability to show trends which helps focus on future improvements Short term Implement an automated reports portal/dashboard for all stakeholders to access and drill down on details Less resource workload and easily accessible by stakeholders Long term Improve the ability for projects to deliver on schedule and on budget while meeting requirements Develop procedures for developing a project Standardized project schedules which Short term schedule using WBS, dependencies, and can be assessed using critical path resources and require it for all projects methods and can be viewed across projects to see resource leveling issues Develop procedures and implement a an Best practice for preventing project integrated baseline review of all new issues before the project begins projects to assess schedule, cost (estimates), technical, and resource risk Mid-term Implement an ANSI 748-b compliant earned Ability to monitor, control, and Long-term value management system (EVMS) forecast scope, schedule, and cost variance early in the project lifecycle Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 14. Assess P3M Framework P3M Framework Methodology Operate Recommend Communicate the benefits of P3M to leadership and stakeholders Implement Promote Buy-in [Sustained Usage of P3M Framework] Sustained communications to leadership and stakeholders selling the value of P3M Participation [ Leverage P3M Artifacts] Commitment [Stated Desire for Improvement] Awareness [Recognition of the Problem] Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 15. Assess P3M Framework P3M Framework Methodology Operate Recommend Perform market research and alternatives analysis Implement Total 5-Year Investment Total 5-Year Investment Total Year 5 Investment Total Year 5 Investment Total Year 4 Investment Total Year 4 Investment Total Year 3 Investment Total Year 3 Investment Total Year 2 Investment Total Year 2 Investment Total Year 1 Investment Promote Total Year 1 Investment $0 $0 $500,000 $1,000,000 $1,500,000 $2,000,000 Planview - Onsite $5,000,000 Sikich (Assistance PSA) - Onsite PlanView - SaaS Total 5-Year Investment Total Year 5 Investment Total Year 4 Investment Total Year 4 Investment Total Year 3 Investment Total Year 3 Investment Total Year 2 Investment Total Year 2 Investment Total Year 1 Investment Sikich (Assistance PSA) - SaaS Total 5-Year Investment Total Year 5 Investment $10,000,000 Total Year 1 Investment $0 $2,000,000 Tenrox - Onsite $4,000,000 Tenrox - SaaS $6,000,000 $0 $400,000 Unanet - Onsite $800,000 $1,200,000 Unanet - SaaS Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 16. Assess P3M Framework P3M Framework Methodology Operate Recommend Stand up organization structure and charter governance bodies Implement Vision/ Mission C-Suite/ Office of the Director Strategic Alignment Line of Business/ Program Office Promote Board of Directors/ Oversight Agency Executive Steering Committee Strategic Initiatives Business Alignment Initiative Initiative Initiative Initiative Program Management Office (PMO) Investment Review Board Portfolio Benefits Alignment Program/Projects Program/Project Advisory Board Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 17. Assess P3M Framework P3M Framework Methodology Operate Recommend Achieve small successes first, then increase complexity, risk, & benefits Implement Promote Program Management Initiate Plan Execute, Monitor, and Control Closeout Iterations - Charter - Market research - Alternatives - Business case - Acquisition Implementation Requirements Design Build Test Deploy Maintain/ Operate Successfully Migrate to the To-Be Vision and Realize Key Benefits that Achieve the Business Strategy Iterations - Inventory projects, resources, skills - Develop policies, standards, procedures, templates - Analyze and plan for data clean up and conversion Transformation Define Application Process/ Workflow Define Configuration Values Develop UAT Test Scenarios/ Scripts Develop and Execute Training Iterations - Identify Stakeholders and Communications Plan - Develop Comm and CM Plans Communication and Change Management Execute Communication and Change Management Iterations Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 18. Assess P3M Framework P3M Framework Methodology Operate Recommend Support operations, stakeholders, and governance Implement Promote * Representative graphic from http://www.planview.com Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com
  • 19. P3M Framework Contact Information Robert M. Buhrman, PMP, PgMP, CSM, ITIL rbuhrman@KoreFederal.com Mr. Buhrman has over 16 years experience in IT and management consulting in both the commercial and public sector. He was most recently the program manager for a large business management improvement program, helping to transform a $800 million fee-for-service Federal program into a best-in-class service delivery organization. He has led several implementations of performance and project management solutions providing key insights and improvement to customers’ business. Mr. Buhrman also has experience supporting organizations with their migration to modernized systems including PMO and acquisition support tasks. In addition, he has experience performing assessments of project performance including the areas of planning, quality, and process assessments. Mr. Buhrman’s implementation experience spans the full systems development lifecycle, including planning, requirements, design, development/configuration, testing, training, deployment, sustainment, and project management activities in support of enterprise resource planning (ERP), commercial off-the-shelf (COTS), and custom-built enterprise solutions. He also recently led a project management team supporting Agile development. Mr. Buhrman is one of a small number of Project Management Institute (PMI) certified Program Management Professionals (PgMP)® worldwide. He also is a certified Project Management Professional (PMP)® since 2005 and a certified ScrumMaster® since 2011. Rob Buhrman, PMP, PgMP, CSM, ITIL robbuhrman@gmail.com