1 of 31


Mumbai's population: shot up by 40% in
1951-61 , by 43.80% in 1961 – 1971



Various acute Infrastructural problem



CIDCO was incorporated on 17th March, 1970
under the Indian Companies Act, 1956


Navi
Mumbai
is
a
rapidly
growing, modern metropolis



The largest totally planned city in the
world



Planned to accommodate a target
population of 4 million and jobs of 2
million in near future



The well-planned transport network


World’s largest ”Greenfield” state-of-the-art
international airports, offering world-class
facilities



The proposed second airport for MMR is
located at Navi Mumbai for several reasons



To cater for the future
population, business and
activities of MMR

growth in
commercial


It is both technically feasible and financially
viable.



The Airport master plan will be developed in
modules..
•The site of airport is located in an area of 1140 hectares
accommodating two parallel runways

•It is expected to absorb annually 10 million passengers in its first
operational year 2012, doubling to 20 million by 2020 followed by
30 million passengers in 2025 and ultimately 40 million by 2030.
•The Navi Mumbai Airport is proposed to be developed through
public-private participation
(i)CREATE JOBS

(ii)DIVERTING POPULATION INTO NEW
TOWN


The existing airport is fast reaching saturation



The air travel demand expected to grow



Unable to handle such an increase in demand



Imperative to build a second Airport for MMR.
Includes Cost of Pre-Development Works of 4017
Crores.
 The Airport is proposed to be developed in three
phases.
 In the first phase, North runway & attached taxi way
system, terminal building & concourse (2,69,000 sq.
PHASE
OPERATIONAL YEAR
m.) PROJECT COST(IN CR.)


1

2015

950

2

2020

1031

3

2025

3036
14573


Generation of 1.42 lakh new jobs directly,2 lakh
jobs indirectly



Likely to attract an investment of about 60,000
crores



This boost to industrial development in turn


Further, enhanced cargo facilities will open up
huge opportunities



Proposed Airport will also make the export / import
of cargo more economical, efficient and fast


Re-settlements & Rehabilitation (R&R)



Hill Cutting



Sustainable Green Development



Connectivity





The NMIA project is going to affect number of
households, minor business activities and
structures located in the vicinity of Airport area
and the same are required to be relocated.
approximately 5,000 families will have to be
re-settled due to the NMIA project.
The R&R entitlements include the allotment of
fully developed plot of area equivalent to
loss, besides other benefits in accordance with
the R&R policy


Encompasses a hill



Ten crore cubic metre
of material like murun
and rock



About six crore cubic
metre of rock is
required


Involves various mandatory pre development
activities to be undertaken



They include land development, filling /
reclamation, recurring of the Ulwe river and
shifting of EHVT lines(Extra High Tension )
CIDCO has stressed enormously on the preservation and
enhancement of the natural environment
Measures Taken

Development of 245 Ha Mangrove Park/ Bio-diversity zone on
Waghivali Island, along with regeneration of lush green
mangroves in an area of 310 Ha.
At Kamothe and 60 Ha. at Moha Creek are being proposed for
preserving the ecological balance of the project area.
A large water body to the north is also being retained


1997 Ministry of civil aviation constituted a committee to
examine various sites for a second airport for Mumbai.
Rewas-Mandwa was recommended as suitable site



2000 A sub-committee constituted by the Airports
Authority of India (AAI) examined the Navi Mumbai site
and found it technically and operationally feasible



2006 International Civil Aviation Organisation conducted
simulation study sponsored jointly by Cidco/GoM & AAI.
Study said simultaneous operation is possible



2007 Cidco submitted project feasibility and business plan
to civil aviation ministry which obtained an in-principle
approval from the Union cabinet


2009 Bombay high court accepted Cidco’s
request for amendment of CRZ notifications and
MoEF issued notification permitting greenfield
airport at Navi Mumbai in CRZ areas, subject to
environmental safeguards



2010 Environment and CRZ clearance for NMIA
project granted by MoEF



2013 Forest department gave last of the
mandatory clearances for airport, only land
acquisition remains for the project to take off


The NMIA was soon mired in controversy, based on the
Environmental Impact Assessment.



The Ministry of Environment and Forests (MoEF)
appointed an Expert Appraisal Committee to take
decisions regarding the NMIA and its proposed location.



The CIDCO, the Government of Maharashtra, the Ministry
of Civil Aviation and the MoEF had their points of view.



There was a process of negotiation, review and
modification of plans. Finally, in November 2010, the
approval with conditions was granted


The original option of locating near Rewas
Mandwa-



The other option of locating near Kalyan – Nevali



Recourse channel for Ulwe Creek -



Archeological / Cultural / Historic Sites -



Reclamation of marshy lands


The Government of India has recently released
the Draft National Land Acquisition and
Resettlement and Rehabilitation Bill 2011 (LARR
Bill).



The LARR Bill seeks to repeal and replace the
Land Acquisition Act 1894.



Right to Fair Compensation and Transparency in
Land Acquisition, Rehabilitation and
Resettlement Act, 2013


The airport requires 2,042 ha (5,050 acres).

Land acquisition is stuck as the villagers
(5,000 families) are demanding a higher
compensation package of 20 crore per acre
 The committee had offered the projectaffected-people (PAP) two rehabilitationrelated compensation options:
a) 12.5% of developed land at the ready
reckoner rates, in addition to monetary
compensation
b) 22.5% developed land in Navi Mumbai.








Each landowner will get 22.5 per cent Of this,
12.5 per cent was part of the original
agreement while 10 per cent will be given
based on the current value of the land.
Farmers will also get triple the size of their
plots to construct houses. And Rs 1,000 per
square metre.
100 shares in the companies which will
develop the airport.
1cr land becomes 3.5 cr.


Concerns such as altering courses of rivers to avoid
flooding, reclamation of land, leveling of
hillocks, hacking hundreds of acres of mangroves &
forests.



The airport is within close vicinity of the Karnala
bird sanctuary.



Aviation experts like Hormuz Mama have raised
concerns regarding the impact of aircraft
operations on birds as well as on flight safety due
to potential instances of bird ingestion into


Construction would damage mangrove cultivation
in the 2,000 hectares, besides the diversion of
Gadhi and Ulwe rivers.



90 per cent of the site i.e 170 hectares are covered
with dense and lush mangroves.



According to the Coastal Regulation Zone
Notification 1991, no development is permitted on
mangroves and other ecologically sensitive areas.



However, in May 2009, this Notification was
amended to make an exception for Mumbai's new
airport.


Noise monitoring will be carried out at critical
locations



A thick green belt should be planned all
around the project site to mitigate noise and
vibrations to the nearby settlements.



The identification of species/plants should be
made based on the botanical studies.



Landscape plan, green belts and open spaces
may be described.


The Environment Impact Assessment (EIA) Study to
obtain Environmental and CRZ Clearance from the
Ministry of Environment and Forests (MoEF).



EIA identifies ways and means for improving the
project environmentally friendly by preventing
minimizing, mitigating or compensating for
adverse impact, so as to achieve a sustainable
development
The coastal land up to 500m from the High Tide Line
(HTL) and a stage of 100m along banks of
creeks, estuaries, backwater and rivers subject to tidal
fluctuations, is called the Coastal Regulation Zone(CRZ).
1.

Diversion of rivers and quarrying/cutting of
mountains/earth is not a permissible activity under CRZ
Notification, 1991.

2.

Examine the details of impact of sea level rise on the
project in the next 100 years.

After amendments the crz gave a clearance.


The 160-hectare Pushpak Nagar to be developed
close to the Navi Mumbai airport site is the next
real-estate gold mine.



Of the 160 hectares, about 105 hectares will go
to the PAPs, while the rest will be used for the
development of civic amenities such as
roads,
sewerage
and
water
supply.

The value of the land here will be minimum Rs
60,000 per sq m, and once the airport work
begins it will touch Rs 1.20 lakh per sq m for sure.








RFQ is a pre-bid process of the
government which narrows down the
interested bidders according to various
criteria
companies like L&T and Reliance
Infrastructure are interested in bidding
for the project.
GVK Infrastructure, the operator of the
Mumbai airport, has the first right of
refusal.
As per the its right, GVK will be
allowed to revise its bid in case it falls
short of the highest bid by 10%.


Thank you

More Related Content

What's hot

Pedestrian Guidelines 20 Nov09
Pedestrian Guidelines 20 Nov09Pedestrian Guidelines 20 Nov09
Pedestrian Guidelines 20 Nov09uttipecDRAFT
 
comprehensive mobality plan of vellore
comprehensive mobality plan of vellorecomprehensive mobality plan of vellore
comprehensive mobality plan of velloreSatyam Rai
 
Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showkiranightly
 
Study of Multihazard on urban habitats of India: A case study of Ahmedabad City
Study of Multihazard on urban habitats of India: A case study of Ahmedabad CityStudy of Multihazard on urban habitats of India: A case study of Ahmedabad City
Study of Multihazard on urban habitats of India: A case study of Ahmedabad CityIEI GSC
 
Planning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at RourkelaPlanning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at RourkelaMaitreyi Yellapragada
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentShruthi Kshirasagar
 
Planning for a multimodal transport interchange literature
Planning for a multimodal transport interchange   literaturePlanning for a multimodal transport interchange   literature
Planning for a multimodal transport interchange literatureGargee Ghosh
 
local area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabadlocal area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, AhmedabadPratham Pincha
 
EIA on Construction impact on NAVI MUMBAI INTERNATIONAL AIRPORT
EIA on Construction impact on NAVI MUMBAI INTERNATIONAL AIRPORTEIA on Construction impact on NAVI MUMBAI INTERNATIONAL AIRPORT
EIA on Construction impact on NAVI MUMBAI INTERNATIONAL AIRPORTRamya Srinivas
 
Smart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiSmart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiJaspal Singh
 
Planning for mumbai the development plan for greater mumbai 2014 2034
Planning for mumbai the development plan for greater mumbai 2014 2034Planning for mumbai the development plan for greater mumbai 2014 2034
Planning for mumbai the development plan for greater mumbai 2014 2034Mumbaikar Le
 
Atta Market, Sector 18, Noida - Case study
Atta Market, Sector 18, Noida - Case studyAtta Market, Sector 18, Noida - Case study
Atta Market, Sector 18, Noida - Case studyAyushi Agrawal
 
Navi mumbai development
Navi mumbai developmentNavi mumbai development
Navi mumbai developmentsmritigupta24
 

What's hot (20)

Tokyo station city
Tokyo station cityTokyo station city
Tokyo station city
 
OVERVIEW OF BANGLORE CMP
OVERVIEW OF BANGLORE CMPOVERVIEW OF BANGLORE CMP
OVERVIEW OF BANGLORE CMP
 
Pune city
Pune cityPune city
Pune city
 
Report
ReportReport
Report
 
Pedestrian Guidelines 20 Nov09
Pedestrian Guidelines 20 Nov09Pedestrian Guidelines 20 Nov09
Pedestrian Guidelines 20 Nov09
 
comprehensive mobality plan of vellore
comprehensive mobality plan of vellorecomprehensive mobality plan of vellore
comprehensive mobality plan of vellore
 
Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt show
 
Study of Multihazard on urban habitats of India: A case study of Ahmedabad City
Study of Multihazard on urban habitats of India: A case study of Ahmedabad CityStudy of Multihazard on urban habitats of India: A case study of Ahmedabad City
Study of Multihazard on urban habitats of India: A case study of Ahmedabad City
 
Planning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at RourkelaPlanning for a Multi-Modal Transportation Hub at Rourkela
Planning for a Multi-Modal Transportation Hub at Rourkela
 
L&T
L&TL&T
L&T
 
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented Development
 
Planning for a multimodal transport interchange literature
Planning for a multimodal transport interchange   literaturePlanning for a multimodal transport interchange   literature
Planning for a multimodal transport interchange literature
 
local area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabadlocal area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabad
 
EIA on Construction impact on NAVI MUMBAI INTERNATIONAL AIRPORT
EIA on Construction impact on NAVI MUMBAI INTERNATIONAL AIRPORTEIA on Construction impact on NAVI MUMBAI INTERNATIONAL AIRPORT
EIA on Construction impact on NAVI MUMBAI INTERNATIONAL AIRPORT
 
Smart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of DelhiSmart and Connected Transport - A Case Study of Delhi
Smart and Connected Transport - A Case Study of Delhi
 
Planning for mumbai the development plan for greater mumbai 2014 2034
Planning for mumbai the development plan for greater mumbai 2014 2034Planning for mumbai the development plan for greater mumbai 2014 2034
Planning for mumbai the development plan for greater mumbai 2014 2034
 
Atta Market, Sector 18, Noida - Case study
Atta Market, Sector 18, Noida - Case studyAtta Market, Sector 18, Noida - Case study
Atta Market, Sector 18, Noida - Case study
 
Navi mumbai development
Navi mumbai developmentNavi mumbai development
Navi mumbai development
 
Cidco- NAVI MUMBAI
Cidco- NAVI MUMBAICidco- NAVI MUMBAI
Cidco- NAVI MUMBAI
 

Viewers also liked

Law presentation
Law presentationLaw presentation
Law presentationRachit Shiv
 
Environment Impact Assessment
Environment Impact Assessment Environment Impact Assessment
Environment Impact Assessment Istiak Asif
 
Marketing management project on hair oil class 12th by faizan khan
Marketing management project on hair oil class 12th by faizan khanMarketing management project on hair oil class 12th by faizan khan
Marketing management project on hair oil class 12th by faizan khanFaizan Khan
 

Viewers also liked (6)

Ryan khargar, navi mumbai
Ryan khargar, navi mumbaiRyan khargar, navi mumbai
Ryan khargar, navi mumbai
 
Law presentation
Law presentationLaw presentation
Law presentation
 
Environment Impact Assessment
Environment Impact Assessment Environment Impact Assessment
Environment Impact Assessment
 
Airports presentation
Airports presentationAirports presentation
Airports presentation
 
Marketing management project on hair oil class 12th by faizan khan
Marketing management project on hair oil class 12th by faizan khanMarketing management project on hair oil class 12th by faizan khan
Marketing management project on hair oil class 12th by faizan khan
 
MARKETING MANAGEMENT - JEANS
MARKETING MANAGEMENT - JEANSMARKETING MANAGEMENT - JEANS
MARKETING MANAGEMENT - JEANS
 

Similar to legal aspects of navi mumbai international airport

Navi Mumbai International Airport.pptx
Navi Mumbai International Airport.pptxNavi Mumbai International Airport.pptx
Navi Mumbai International Airport.pptxSaurabh Patil
 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureKANTHARAJAN GANESAN
 
2015 final order and ec to mundra
2015 final order and ec to mundra2015 final order and ec to mundra
2015 final order and ec to mundraAravind Maya
 
KISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAKISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAMNIT,JAIPUR
 
Zorlu pakistan eia april 2010
Zorlu pakistan eia april 2010Zorlu pakistan eia april 2010
Zorlu pakistan eia april 2010zubeditufail
 
IRJET- Environmental Impact Assessment on River Jhelum for Inland Water Trans...
IRJET- Environmental Impact Assessment on River Jhelum for Inland Water Trans...IRJET- Environmental Impact Assessment on River Jhelum for Inland Water Trans...
IRJET- Environmental Impact Assessment on River Jhelum for Inland Water Trans...IRJET Journal
 
Combine coal transshipment project report
Combine coal transshipment project reportCombine coal transshipment project report
Combine coal transshipment project reportshehri_cbe
 
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...Mayur Rahangdale
 
Thesis Defence: Methods to Enhance the Safe and Green Ship Recycling Capacity...
Thesis Defence: Methods to Enhance the Safe and Green Ship Recycling Capacity...Thesis Defence: Methods to Enhance the Safe and Green Ship Recycling Capacity...
Thesis Defence: Methods to Enhance the Safe and Green Ship Recycling Capacity...prasant behera
 
Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...
Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...
Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...MILLA MENGA
 
Construction Law: An Indian Perspective
Construction Law: An Indian PerspectiveConstruction Law: An Indian Perspective
Construction Law: An Indian Perspectivedesignesque
 
Esia Pakistan international bulk terminal - PROPOSED COAL, CLINKER & CEMENT T...
Esia Pakistan international bulk terminal - PROPOSED COAL, CLINKER & CEMENT T...Esia Pakistan international bulk terminal - PROPOSED COAL, CLINKER & CEMENT T...
Esia Pakistan international bulk terminal - PROPOSED COAL, CLINKER & CEMENT T...zubeditufail
 
Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3Parti Djibouti
 
THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...
THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...
THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...Caroline Kinya Ikiriinya
 
Chapter 3 Project Description - EIA Report - La Cambuse Hotel
Chapter 3 Project Description - EIA Report - La Cambuse HotelChapter 3 Project Description - EIA Report - La Cambuse Hotel
Chapter 3 Project Description - EIA Report - La Cambuse Hotelaknl-mauritius
 
Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi reportGeeva Chandana
 

Similar to legal aspects of navi mumbai international airport (20)

Navi Mumbai International Airport.pptx
Navi Mumbai International Airport.pptxNavi Mumbai International Airport.pptx
Navi Mumbai International Airport.pptx
 
Crz goals purpose & act
Crz goals  purpose & actCrz goals  purpose & act
Crz goals purpose & act
 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
 
2015 final order and ec to mundra
2015 final order and ec to mundra2015 final order and ec to mundra
2015 final order and ec to mundra
 
KISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAKISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIA
 
Zorlu pakistan eia april 2010
Zorlu pakistan eia april 2010Zorlu pakistan eia april 2010
Zorlu pakistan eia april 2010
 
IRJET- Environmental Impact Assessment on River Jhelum for Inland Water Trans...
IRJET- Environmental Impact Assessment on River Jhelum for Inland Water Trans...IRJET- Environmental Impact Assessment on River Jhelum for Inland Water Trans...
IRJET- Environmental Impact Assessment on River Jhelum for Inland Water Trans...
 
Combine coal transshipment project report
Combine coal transshipment project reportCombine coal transshipment project report
Combine coal transshipment project report
 
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
 
Thesis Defence: Methods to Enhance the Safe and Green Ship Recycling Capacity...
Thesis Defence: Methods to Enhance the Safe and Green Ship Recycling Capacity...Thesis Defence: Methods to Enhance the Safe and Green Ship Recycling Capacity...
Thesis Defence: Methods to Enhance the Safe and Green Ship Recycling Capacity...
 
Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...
Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...
Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...
 
Construction Law: An Indian Perspective
Construction Law: An Indian PerspectiveConstruction Law: An Indian Perspective
Construction Law: An Indian Perspective
 
EIA Report of Orange Line Train
EIA Report of Orange Line TrainEIA Report of Orange Line Train
EIA Report of Orange Line Train
 
Esia Pakistan international bulk terminal - PROPOSED COAL, CLINKER & CEMENT T...
Esia Pakistan international bulk terminal - PROPOSED COAL, CLINKER & CEMENT T...Esia Pakistan international bulk terminal - PROPOSED COAL, CLINKER & CEMENT T...
Esia Pakistan international bulk terminal - PROPOSED COAL, CLINKER & CEMENT T...
 
Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3
 
THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...
THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...
THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...
 
Presentation on DMRC
Presentation on DMRCPresentation on DMRC
Presentation on DMRC
 
Chapter 3 Project Description - EIA Report - La Cambuse Hotel
Chapter 3 Project Description - EIA Report - La Cambuse HotelChapter 3 Project Description - EIA Report - La Cambuse Hotel
Chapter 3 Project Description - EIA Report - La Cambuse Hotel
 
Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi report
 
Paper
PaperPaper
Paper
 

Recently uploaded

Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 

Recently uploaded (20)

Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 

legal aspects of navi mumbai international airport

  • 1.
  • 2.  Mumbai's population: shot up by 40% in 1951-61 , by 43.80% in 1961 – 1971  Various acute Infrastructural problem  CIDCO was incorporated on 17th March, 1970 under the Indian Companies Act, 1956
  • 3.  Navi Mumbai is a rapidly growing, modern metropolis  The largest totally planned city in the world  Planned to accommodate a target population of 4 million and jobs of 2 million in near future  The well-planned transport network
  • 4.  World’s largest ”Greenfield” state-of-the-art international airports, offering world-class facilities  The proposed second airport for MMR is located at Navi Mumbai for several reasons  To cater for the future population, business and activities of MMR growth in commercial
  • 5.  It is both technically feasible and financially viable.  The Airport master plan will be developed in modules..
  • 6. •The site of airport is located in an area of 1140 hectares accommodating two parallel runways •It is expected to absorb annually 10 million passengers in its first operational year 2012, doubling to 20 million by 2020 followed by 30 million passengers in 2025 and ultimately 40 million by 2030. •The Navi Mumbai Airport is proposed to be developed through public-private participation
  • 8.  The existing airport is fast reaching saturation  The air travel demand expected to grow  Unable to handle such an increase in demand  Imperative to build a second Airport for MMR.
  • 9. Includes Cost of Pre-Development Works of 4017 Crores.  The Airport is proposed to be developed in three phases.  In the first phase, North runway & attached taxi way system, terminal building & concourse (2,69,000 sq. PHASE OPERATIONAL YEAR m.) PROJECT COST(IN CR.)  1 2015 950 2 2020 1031 3 2025 3036 14573
  • 10.  Generation of 1.42 lakh new jobs directly,2 lakh jobs indirectly  Likely to attract an investment of about 60,000 crores  This boost to industrial development in turn
  • 11.  Further, enhanced cargo facilities will open up huge opportunities  Proposed Airport will also make the export / import of cargo more economical, efficient and fast
  • 12.  Re-settlements & Rehabilitation (R&R)  Hill Cutting  Sustainable Green Development  Connectivity
  • 13.    The NMIA project is going to affect number of households, minor business activities and structures located in the vicinity of Airport area and the same are required to be relocated. approximately 5,000 families will have to be re-settled due to the NMIA project. The R&R entitlements include the allotment of fully developed plot of area equivalent to loss, besides other benefits in accordance with the R&R policy
  • 14.  Encompasses a hill  Ten crore cubic metre of material like murun and rock  About six crore cubic metre of rock is required
  • 15.  Involves various mandatory pre development activities to be undertaken  They include land development, filling / reclamation, recurring of the Ulwe river and shifting of EHVT lines(Extra High Tension )
  • 16. CIDCO has stressed enormously on the preservation and enhancement of the natural environment Measures Taken Development of 245 Ha Mangrove Park/ Bio-diversity zone on Waghivali Island, along with regeneration of lush green mangroves in an area of 310 Ha. At Kamothe and 60 Ha. at Moha Creek are being proposed for preserving the ecological balance of the project area. A large water body to the north is also being retained
  • 17.  1997 Ministry of civil aviation constituted a committee to examine various sites for a second airport for Mumbai. Rewas-Mandwa was recommended as suitable site  2000 A sub-committee constituted by the Airports Authority of India (AAI) examined the Navi Mumbai site and found it technically and operationally feasible  2006 International Civil Aviation Organisation conducted simulation study sponsored jointly by Cidco/GoM & AAI. Study said simultaneous operation is possible  2007 Cidco submitted project feasibility and business plan to civil aviation ministry which obtained an in-principle approval from the Union cabinet
  • 18.  2009 Bombay high court accepted Cidco’s request for amendment of CRZ notifications and MoEF issued notification permitting greenfield airport at Navi Mumbai in CRZ areas, subject to environmental safeguards  2010 Environment and CRZ clearance for NMIA project granted by MoEF  2013 Forest department gave last of the mandatory clearances for airport, only land acquisition remains for the project to take off
  • 19.  The NMIA was soon mired in controversy, based on the Environmental Impact Assessment.  The Ministry of Environment and Forests (MoEF) appointed an Expert Appraisal Committee to take decisions regarding the NMIA and its proposed location.  The CIDCO, the Government of Maharashtra, the Ministry of Civil Aviation and the MoEF had their points of view.  There was a process of negotiation, review and modification of plans. Finally, in November 2010, the approval with conditions was granted
  • 20.  The original option of locating near Rewas Mandwa-  The other option of locating near Kalyan – Nevali  Recourse channel for Ulwe Creek -  Archeological / Cultural / Historic Sites -  Reclamation of marshy lands
  • 21.  The Government of India has recently released the Draft National Land Acquisition and Resettlement and Rehabilitation Bill 2011 (LARR Bill).  The LARR Bill seeks to repeal and replace the Land Acquisition Act 1894.  Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013
  • 22.  The airport requires 2,042 ha (5,050 acres). Land acquisition is stuck as the villagers (5,000 families) are demanding a higher compensation package of 20 crore per acre  The committee had offered the projectaffected-people (PAP) two rehabilitationrelated compensation options: a) 12.5% of developed land at the ready reckoner rates, in addition to monetary compensation b) 22.5% developed land in Navi Mumbai. 
  • 23.     Each landowner will get 22.5 per cent Of this, 12.5 per cent was part of the original agreement while 10 per cent will be given based on the current value of the land. Farmers will also get triple the size of their plots to construct houses. And Rs 1,000 per square metre. 100 shares in the companies which will develop the airport. 1cr land becomes 3.5 cr.
  • 24.  Concerns such as altering courses of rivers to avoid flooding, reclamation of land, leveling of hillocks, hacking hundreds of acres of mangroves & forests.  The airport is within close vicinity of the Karnala bird sanctuary.  Aviation experts like Hormuz Mama have raised concerns regarding the impact of aircraft operations on birds as well as on flight safety due to potential instances of bird ingestion into
  • 25.  Construction would damage mangrove cultivation in the 2,000 hectares, besides the diversion of Gadhi and Ulwe rivers.  90 per cent of the site i.e 170 hectares are covered with dense and lush mangroves.  According to the Coastal Regulation Zone Notification 1991, no development is permitted on mangroves and other ecologically sensitive areas.  However, in May 2009, this Notification was amended to make an exception for Mumbai's new airport.
  • 26.  Noise monitoring will be carried out at critical locations  A thick green belt should be planned all around the project site to mitigate noise and vibrations to the nearby settlements.  The identification of species/plants should be made based on the botanical studies.  Landscape plan, green belts and open spaces may be described.
  • 27.  The Environment Impact Assessment (EIA) Study to obtain Environmental and CRZ Clearance from the Ministry of Environment and Forests (MoEF).  EIA identifies ways and means for improving the project environmentally friendly by preventing minimizing, mitigating or compensating for adverse impact, so as to achieve a sustainable development
  • 28. The coastal land up to 500m from the High Tide Line (HTL) and a stage of 100m along banks of creeks, estuaries, backwater and rivers subject to tidal fluctuations, is called the Coastal Regulation Zone(CRZ). 1. Diversion of rivers and quarrying/cutting of mountains/earth is not a permissible activity under CRZ Notification, 1991. 2. Examine the details of impact of sea level rise on the project in the next 100 years. After amendments the crz gave a clearance.
  • 29.  The 160-hectare Pushpak Nagar to be developed close to the Navi Mumbai airport site is the next real-estate gold mine.  Of the 160 hectares, about 105 hectares will go to the PAPs, while the rest will be used for the development of civic amenities such as roads, sewerage and water supply. The value of the land here will be minimum Rs 60,000 per sq m, and once the airport work begins it will touch Rs 1.20 lakh per sq m for sure.
  • 30.     RFQ is a pre-bid process of the government which narrows down the interested bidders according to various criteria companies like L&T and Reliance Infrastructure are interested in bidding for the project. GVK Infrastructure, the operator of the Mumbai airport, has the first right of refusal. As per the its right, GVK will be allowed to revise its bid in case it falls short of the highest bid by 10%.