Introduction
One of the problems created by road traffic is parking. Not only do vehicles require
street space to move about, but also do they require space to park where the occupants
can be loaded and unloaded. The period over which a car is parked is very great
compared with the time it is in motion. The size of average parking space is 14 m2. It is
roughly estimated that out of 8760 hours in a year, the car runs on an average for only
400 hours, leaving 8360 hours when it is parked. Every car owner would wish to park
the car as closely as possible to his destination so as to minimize his walking.
Effect of parking
 Congestion
 Accidents
 Obstruction to fire fighting operations
 Effect on environment
Objectives
 To study the parking characteristics in Pattambi-Cherpulassery road and to assess
whether the demand is met with.
 Identification of the problems in traffic and parking in Pattambi-Cherpulassery road
 To project the present traffic scenario in Pattambi-Cherpulassery road.
 To improve the parking facilities utilizing the available infrastructure for meeting the
parking demand of various categories of vehicles.
 To smoothen the vehicular traffic flow by conducting relevant traffic studies
General Terms of Parking
Facilities
1. Parking Accumulation :-The total number of vehicles parked in an area at a
specified moment.
2. Parking volume:-The number of vehicles parked in a particular area over a
given period of time. It is usually measured in vehicles per day.
3. Parking load:-The area under the parking accumulation curve during a specified
period.
4. Parking duration:-The length of time spent in a parking space.
5. Parking index:-Percentage of parking bays actually occupied by parked vehicles
as compared to the theoretical number available.
6. Parking turn over:-Rate of the usage of the available parking space. Thus if
there were 10 parking spaces used by 100 vehicles in a period of say 12 hours then
the parking turnover would be
Parking facilities
 On – street or Kerb Parking
 Off – street Parking
On – street or Kerb Parking
1. Parallel Parking
2. 30 degree parking
3. 45 degree parking
4. 60 degree Parking
5. 90 degree Parking
 Parallel Parking
 30 degree parking
 45 degree parking
 60 degree Parking
 90 degree Parking
Off-street Parking
1.Surface car parks
2.Multistoried car parks
3.Roof parks
4.Mechanical parks
5.Underground car parks
Off-street Parking
 Surface car parks
 Multistoried car parks
 Roof parks
 Mechanical parks
 Underground car parks
Peripheral Parking Schemes
1. Park and walk
Under this scheme the motorists are
included to park at the outskirts of the town and
walk down to the town.
2. Park and ride
This scheme provide for peripheral parking
facilities and public transport side to the destinations
in the town.
Parking studies
 Inventory of existing parking space supply and measure current
levels of space usage (accumulation and space turn over).
 Identify salient parking characteristics (duration, purpose, trip
destination and walking distances to destination).
 Qualify demands and needs.
 Estimate facility capital and operating costs, usage and revenues.
Types of Parking Surveys
 Parking Space in inventory
 Parking Usage Survey by Patrol
 Questionnaire Type Parking Usage Survey
 Cordon Count
Comprehensive Parking
Studies
 Location where parked
 Trip purpose and frequency
 Primary trip destination
 Length of time parked
 Parking fees paid and
 Distance walked from primary space to primary destination
Land Use Survey
The nature of the Commercial Centre was decided by making observations at the
particular site for 1 hour. Commercial center in which more than 5 customers visited
within 1 hour was taken as Customer attractive Commercial center; otherwise it was
taken as Non-customer attractive Commercial center. Shops like textiles attracted
more customers whereas in Beauty Parlors, Printing shops etc. customers were less.
The table 4.1 shows the types of shops considered for this study.
Types of Shops
Sl No Customer attractive
Shops
Non-Customer attractive
shops
1 Textile Electricals
2 Vegetable Shop Printing Shop
3 Restaurant Furniture
4 Stationery Grocery Shop
5 Flower marts Beauty Parlor
6 Fancy Shop Tailoring Shop
7 Internet cafe Hotel
8 Photostat shop Mill
9 STD Booth Appliances
10 Bakery Electronics Shop
Types of Office
Sl No Customer attractive Office Non-Customer attractive
Office
1 Bank School
2 Post Office Government Offices
For all the sections the
buildings are divided into
 Customer Attractive Shops (CAS)
 Non-customer Attractive Shops (NCAS)
 Customer Attractive Office (CAO)
 Non-customer Attractive Office (NCAO)
Kerala Municipality
Building Rules
for off-street parking space
Sl
No:
Occupancy One parking space for every or fraction of
1 Group A1
Residential apartment
houses/flats
a 8 units (with each unit up to 100 sq.m of
carpet area)
b 4 units (with each unit 102 to 150 sq.m of
carpet area)
c 2 units (with each unit 151 to 200 sq.m of
carpet area)
d Single unit (exceeding 200m of carpet area)
2 Group A2
special residential lodging
and rooming houses,
tourist homes and hostels,
dormitories etc. without
any attached eating
facility such as restaurant,
canteen, cafeteria, mess
or dinning.
I.
Rooms with attached bath and Water
Closet
(a) 8 rooms (with each room up to 12 sq.m
carpet area)
(b) 5 rooms (with each room 12 to 20 sq.m
carpet area)
(c) 3 rooms (with each room above 20 sq.m
carpet area)
II.
Rooms without attached bath and Water
Closet
(a) 18 rooms (with each room up to 5 sq.m
carpet area)
(b) 12 rooms (with each rooms 5 to 12 sq.m
carpet area)
(c) 6 rooms (with each room above 12 sq.m
carpet area)
3 Group B
Educational
High school, higher secondary
school, junior technical school,
industrial training institutes etc.
(i) 300 sq.m of carpet area
(2) Higher educational
institutions
(ii) 200 sq.m of carpet area
4 Group C
Medical/Hospitals
100 sq.m of carpet area
5 Group D-Assembly 25 Seats of accommodation
i. In the case of wedding halls &
community halls for calculating in the
carpet area/seating accommodation,
for the purpose of off-street parking,
the carpet area of either the
auditorium/dining hall, whichever is
higher, alone need be taken.
ii. For the purpose of this rules 1.5 sq.m
carpet areas shall be considered as
one seating accommodation.
6 Group E
Business/Office Building
100 sq,m of carpet area
7 Group F
Mercantile/Commercial building
exceeding 75 sq.m of carpet area
100 sq.m of carpet area
8 Group G
Small Industrial exceeding
100sq.m of carpet area
200 sq.m of carpet area
9 Group H
Storage
200 sq.m of carpet area
Conclusion
Now a day’s parking scenario has to be seriously impacted in every areas.
Because parking problems has been increasing day by day at an alarming
rate. In order to alloy congestion, these are certain new parking problems
that can be easily established. Such as on street kerb parking, off street
parking, Angle parking & parallel parking can be made. Surface Car Parks,
Multistoried Car Parks, Roof of Parks, Underground Car Parks, Peripheral
Parking Schemes, Park and walk, Park and ride are those. By adopting this
method the problem can be easily solved.
8086918147If you are satisfied pls call me
Parking problems
Parking problems

More Related Content

What's hot

Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation System
guest6d72ec
 

What's hot (20)

Parking
ParkingParking
Parking
 
Automated highway systems
Automated highway systemsAutomated highway systems
Automated highway systems
 
Parking study
Parking studyParking study
Parking study
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation System
 
On street and off street parking
On street and off street parkingOn street and off street parking
On street and off street parking
 
MASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEMMASS RAPID TRANSIT SYSTEM
MASS RAPID TRANSIT SYSTEM
 
ELEVATOR SYSTEM IN DELHI METRO STATIONS
ELEVATOR SYSTEM IN DELHI METRO STATIONSELEVATOR SYSTEM IN DELHI METRO STATIONS
ELEVATOR SYSTEM IN DELHI METRO STATIONS
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
Ferrocement ppt
Ferrocement pptFerrocement ppt
Ferrocement ppt
 
Traffic control devices
Traffic control devicesTraffic control devices
Traffic control devices
 
Skybus ppt
Skybus pptSkybus ppt
Skybus ppt
 
Advanced construction equipments and techniques
Advanced construction equipments and techniquesAdvanced construction equipments and techniques
Advanced construction equipments and techniques
 
Intersection,types
Intersection,typesIntersection,types
Intersection,types
 
Presentation on Railway STATION LAYOUT
Presentation on  Railway STATION LAYOUTPresentation on  Railway STATION LAYOUT
Presentation on Railway STATION LAYOUT
 
Intersection designs ppt
Intersection designs pptIntersection designs ppt
Intersection designs ppt
 
Type of traffic signals Ppt
Type of traffic signals PptType of traffic signals Ppt
Type of traffic signals Ppt
 
Traffic signal co ordination
Traffic signal co ordinationTraffic signal co ordination
Traffic signal co ordination
 
Highway failure & their maintenance ppt
 Highway failure & their maintenance ppt Highway failure & their maintenance ppt
Highway failure & their maintenance ppt
 
Automatic parking SYSTEM
Automatic parking SYSTEMAutomatic parking SYSTEM
Automatic parking SYSTEM
 
Origin – Destination survey
Origin – Destination surveyOrigin – Destination survey
Origin – Destination survey
 

Similar to Parking problems

pptparking-160731172031 (1).pdf
pptparking-160731172031 (1).pdfpptparking-160731172031 (1).pdf
pptparking-160731172031 (1).pdf
YashKoli22
 
From Parking to Paradise: An Evening with Professor Donald Shoup
From Parking to Paradise: An Evening with Professor Donald ShoupFrom Parking to Paradise: An Evening with Professor Donald Shoup
From Parking to Paradise: An Evening with Professor Donald Shoup
TransFormCA
 
Activity Centre Parking Demand; a Novel Forecasting Model, its Applications a...
Activity Centre Parking Demand; a Novel Forecasting Model, its Applications a...Activity Centre Parking Demand; a Novel Forecasting Model, its Applications a...
Activity Centre Parking Demand; a Novel Forecasting Model, its Applications a...
JumpingJaq
 
book report graduation project
book report graduation projectbook report graduation project
book report graduation project
Ahmed Adel
 
Revision of parking code for IRC
Revision of parking code for IRCRevision of parking code for IRC
Revision of parking code for IRC
Akanksha Chopra
 
Shum li sze individual
Shum li sze individualShum li sze individual
Shum li sze individual
liszee
 

Similar to Parking problems (20)

pptparking-160731172031 (1).pdf
pptparking-160731172031 (1).pdfpptparking-160731172031 (1).pdf
pptparking-160731172031 (1).pdf
 
akash.pptx
akash.pptxakash.pptx
akash.pptx
 
From Parking to Paradise: An Evening with Professor Donald Shoup
From Parking to Paradise: An Evening with Professor Donald ShoupFrom Parking to Paradise: An Evening with Professor Donald Shoup
From Parking to Paradise: An Evening with Professor Donald Shoup
 
Car Parking Design in Urban Planning
Car Parking Design in Urban PlanningCar Parking Design in Urban Planning
Car Parking Design in Urban Planning
 
Smart parking
Smart parkingSmart parking
Smart parking
 
Smart parking 2020 vision
Smart parking 2020 vision Smart parking 2020 vision
Smart parking 2020 vision
 
Activity Centre Parking Demand; a Novel Forecasting Model, its Applications a...
Activity Centre Parking Demand; a Novel Forecasting Model, its Applications a...Activity Centre Parking Demand; a Novel Forecasting Model, its Applications a...
Activity Centre Parking Demand; a Novel Forecasting Model, its Applications a...
 
Parking studies
Parking studiesParking studies
Parking studies
 
IRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular ParkingIRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular Parking
 
tata motors
tata motorstata motors
tata motors
 
DNCC-DSCC.RoadSide.&.Towered.Parking.Solution.ppt
DNCC-DSCC.RoadSide.&.Towered.Parking.Solution.pptDNCC-DSCC.RoadSide.&.Towered.Parking.Solution.ppt
DNCC-DSCC.RoadSide.&.Towered.Parking.Solution.ppt
 
Research methodology and seminar on Rejuvenating UNIT 1 market complex of Bhu...
Research methodology and seminar on Rejuvenating UNIT 1 market complex of Bhu...Research methodology and seminar on Rejuvenating UNIT 1 market complex of Bhu...
Research methodology and seminar on Rejuvenating UNIT 1 market complex of Bhu...
 
book report graduation project
book report graduation projectbook report graduation project
book report graduation project
 
thesis Prestation design
thesis Prestation designthesis Prestation design
thesis Prestation design
 
Revision of parking code for IRC
Revision of parking code for IRCRevision of parking code for IRC
Revision of parking code for IRC
 
Shum li sze individual
Shum li sze individualShum li sze individual
Shum li sze individual
 
Final FYP-ppt
Final FYP-pptFinal FYP-ppt
Final FYP-ppt
 
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
Analysis of Parking Demand and Suggesting Alternative for Parking (A Case Stu...
 
Enterprise Architecture in a Car Park
Enterprise Architecture in a Car ParkEnterprise Architecture in a Car Park
Enterprise Architecture in a Car Park
 
Analysis for Maximum Utilization of Parking Area
Analysis for Maximum Utilization of Parking AreaAnalysis for Maximum Utilization of Parking Area
Analysis for Maximum Utilization of Parking Area
 

Recently uploaded

Recently uploaded (20)

Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 

Parking problems

  • 1.
  • 3. Introduction One of the problems created by road traffic is parking. Not only do vehicles require street space to move about, but also do they require space to park where the occupants can be loaded and unloaded. The period over which a car is parked is very great compared with the time it is in motion. The size of average parking space is 14 m2. It is roughly estimated that out of 8760 hours in a year, the car runs on an average for only 400 hours, leaving 8360 hours when it is parked. Every car owner would wish to park the car as closely as possible to his destination so as to minimize his walking.
  • 4. Effect of parking  Congestion  Accidents  Obstruction to fire fighting operations  Effect on environment
  • 5. Objectives  To study the parking characteristics in Pattambi-Cherpulassery road and to assess whether the demand is met with.  Identification of the problems in traffic and parking in Pattambi-Cherpulassery road  To project the present traffic scenario in Pattambi-Cherpulassery road.  To improve the parking facilities utilizing the available infrastructure for meeting the parking demand of various categories of vehicles.  To smoothen the vehicular traffic flow by conducting relevant traffic studies
  • 6. General Terms of Parking Facilities 1. Parking Accumulation :-The total number of vehicles parked in an area at a specified moment. 2. Parking volume:-The number of vehicles parked in a particular area over a given period of time. It is usually measured in vehicles per day. 3. Parking load:-The area under the parking accumulation curve during a specified period. 4. Parking duration:-The length of time spent in a parking space. 5. Parking index:-Percentage of parking bays actually occupied by parked vehicles as compared to the theoretical number available. 6. Parking turn over:-Rate of the usage of the available parking space. Thus if there were 10 parking spaces used by 100 vehicles in a period of say 12 hours then the parking turnover would be
  • 7. Parking facilities  On – street or Kerb Parking  Off – street Parking
  • 8. On – street or Kerb Parking 1. Parallel Parking 2. 30 degree parking 3. 45 degree parking 4. 60 degree Parking 5. 90 degree Parking
  • 10.  30 degree parking
  • 11.  45 degree parking
  • 12.  60 degree Parking
  • 13.  90 degree Parking
  • 14. Off-street Parking 1.Surface car parks 2.Multistoried car parks 3.Roof parks 4.Mechanical parks 5.Underground car parks Off-street Parking
  • 20. Peripheral Parking Schemes 1. Park and walk Under this scheme the motorists are included to park at the outskirts of the town and walk down to the town. 2. Park and ride This scheme provide for peripheral parking facilities and public transport side to the destinations in the town.
  • 21. Parking studies  Inventory of existing parking space supply and measure current levels of space usage (accumulation and space turn over).  Identify salient parking characteristics (duration, purpose, trip destination and walking distances to destination).  Qualify demands and needs.  Estimate facility capital and operating costs, usage and revenues.
  • 22. Types of Parking Surveys  Parking Space in inventory  Parking Usage Survey by Patrol  Questionnaire Type Parking Usage Survey  Cordon Count
  • 23. Comprehensive Parking Studies  Location where parked  Trip purpose and frequency  Primary trip destination  Length of time parked  Parking fees paid and  Distance walked from primary space to primary destination
  • 24. Land Use Survey The nature of the Commercial Centre was decided by making observations at the particular site for 1 hour. Commercial center in which more than 5 customers visited within 1 hour was taken as Customer attractive Commercial center; otherwise it was taken as Non-customer attractive Commercial center. Shops like textiles attracted more customers whereas in Beauty Parlors, Printing shops etc. customers were less. The table 4.1 shows the types of shops considered for this study.
  • 25. Types of Shops Sl No Customer attractive Shops Non-Customer attractive shops 1 Textile Electricals 2 Vegetable Shop Printing Shop 3 Restaurant Furniture 4 Stationery Grocery Shop 5 Flower marts Beauty Parlor 6 Fancy Shop Tailoring Shop 7 Internet cafe Hotel 8 Photostat shop Mill 9 STD Booth Appliances 10 Bakery Electronics Shop
  • 26. Types of Office Sl No Customer attractive Office Non-Customer attractive Office 1 Bank School 2 Post Office Government Offices
  • 27. For all the sections the buildings are divided into  Customer Attractive Shops (CAS)  Non-customer Attractive Shops (NCAS)  Customer Attractive Office (CAO)  Non-customer Attractive Office (NCAO)
  • 28. Kerala Municipality Building Rules for off-street parking space
  • 29. Sl No: Occupancy One parking space for every or fraction of 1 Group A1 Residential apartment houses/flats a 8 units (with each unit up to 100 sq.m of carpet area) b 4 units (with each unit 102 to 150 sq.m of carpet area) c 2 units (with each unit 151 to 200 sq.m of carpet area) d Single unit (exceeding 200m of carpet area)
  • 30. 2 Group A2 special residential lodging and rooming houses, tourist homes and hostels, dormitories etc. without any attached eating facility such as restaurant, canteen, cafeteria, mess or dinning. I. Rooms with attached bath and Water Closet (a) 8 rooms (with each room up to 12 sq.m carpet area) (b) 5 rooms (with each room 12 to 20 sq.m carpet area) (c) 3 rooms (with each room above 20 sq.m carpet area) II. Rooms without attached bath and Water Closet (a) 18 rooms (with each room up to 5 sq.m carpet area) (b) 12 rooms (with each rooms 5 to 12 sq.m carpet area) (c) 6 rooms (with each room above 12 sq.m carpet area)
  • 31. 3 Group B Educational High school, higher secondary school, junior technical school, industrial training institutes etc. (i) 300 sq.m of carpet area (2) Higher educational institutions (ii) 200 sq.m of carpet area 4 Group C Medical/Hospitals 100 sq.m of carpet area
  • 32. 5 Group D-Assembly 25 Seats of accommodation i. In the case of wedding halls & community halls for calculating in the carpet area/seating accommodation, for the purpose of off-street parking, the carpet area of either the auditorium/dining hall, whichever is higher, alone need be taken. ii. For the purpose of this rules 1.5 sq.m carpet areas shall be considered as one seating accommodation.
  • 33. 6 Group E Business/Office Building 100 sq,m of carpet area 7 Group F Mercantile/Commercial building exceeding 75 sq.m of carpet area 100 sq.m of carpet area 8 Group G Small Industrial exceeding 100sq.m of carpet area 200 sq.m of carpet area 9 Group H Storage 200 sq.m of carpet area
  • 34. Conclusion Now a day’s parking scenario has to be seriously impacted in every areas. Because parking problems has been increasing day by day at an alarming rate. In order to alloy congestion, these are certain new parking problems that can be easily established. Such as on street kerb parking, off street parking, Angle parking & parallel parking can be made. Surface Car Parks, Multistoried Car Parks, Roof of Parks, Underground Car Parks, Peripheral Parking Schemes, Park and walk, Park and ride are those. By adopting this method the problem can be easily solved.
  • 35. 8086918147If you are satisfied pls call me