Presented by : VENUMADHAV.R.YEMUL 
Guided by : MILIND.D.DARADE 
Roll No : 5073 
1
Manpower, equipment, and materials are 
important project resources that require 
management attention. 
The basic objective of resource planning and 
resource allocation is to supply and support 
the field operations. 
The term resource allocation is used in the 
case where required resources are assigned 
such that available resources are not 
exceeded. 
2
Resources are the means of production 
needed to complete a project. 
Most project managers would consider the 
big three resources that will require your 
attention to be: 
• Material 
• Labor 
• Equipment 
3
A. LABOUR 
a. In the limited resource allocation case, there 
are two assumptions: 
(1) There are a fixed number of crews available 
to perform the work and 
(2) The project may be delayed as a result of 
the limitation of crews. 
The objective of the resource allocation 
problem is to determine when the project will 
be completed. 
4
b. In the unlimited resource leveling case, there 
are two assumptions: 
(1) There are an unlimited number of crews 
available to perform the work and 
(2) The project may not be delayed. 
The objective of the resource leveling 
problem is to determine how to limit the 
fluctuation in crews required on the job. 
5
B. MATERIALS 
Materials, for projects with sufficient on-site 
storage, are delivered to the site and assumed 
to be available to workers as needed. 
A material-related concern for sites that have 
sufficient space is that of optimizing the position 
of materials on the site so that they require the 
least travel time from the lay-down yard to the 
work-face. 
6
C. EQUIPMENTS 
There are various types of equipment used on 
construction sites. 
Some of this equipment should be considered in 
the project plan, some need not be included. 
Workers, and their companies, are typically 
required to provide the small tools needed to 
complete their specific features of work. 
There are some types of equipment, however, that 
can affect the overall sequence and duration of the 
project. 
7
Resource allocation is used to assign the 
available resources in an economic way. 
It is part of resource management. 
In project management, resource allocation 
is the scheduling of activities and the 
resources required by those activities while 
taking into consideration both the resource 
availability and the project time. 
8
Resource planning cannot be accomplished 
without four essential resources necessary 
to accomplish the given scope of work: 
• MATERIAL 
• MAN POWER 
• MACHINARY 
• TIME 
9
Human resources for construction planning 
breaks down into three major categories as 
follows: 
• Home office personnel(Administrative 
Persons) 
• Construction personnel (field supervision 
and labor) 
• Construction subcontractors(Electrification, 
Plumbing, etc) 
10
The ideal form of a personnel loading curves 
is a trapezoid. 
The average personnel loading curve is a 
straight line. 
Actual practice loading curves take the 
shape of a bell curve 
11
12
The latter two result when the personnel 
loading curves occur earlier or later than 
planned on a project. 
Front loaded curve- the work started as early 
as possible. 
Normal loaded curve- the work started at 
normal time. 
Back loaded curve- the work started as late 
as possible. 
13
The "S" curve for the ideally loaded project has 
a gradual start and finish, which indicates 
smooth starting and finishing conditions. 
The forward loaded curve shows a rapid project 
start up and an even more gradual than normal 
phase out at the end. 
The backward-loaded project indicates a more 
relaxed start and a very steep finish slope on 
the "S" curve. 
14
15
16
Ensuring that the material resources for the 
project arrive on time involves these 
important planning areas: 
• Long-delivery equipment 
• Special materials and alloys 
• Common materials in short supply 
• Services and system requirements 
• Transportation systems 
17
Resource Limited: The project must be finished as 
soon as possible, but without exceeding some 
specific level of resource usage or some general 
resource constraint 
18
1. When the schedule demands more workers 
per day than are available or if we have 
workers standing around without jobs, we 
have a problem. 
2. When a new hire is trained, there is loss of 
productivity. So, if we can keep the trained 
people and reduce the number of new hires, 
we should be better off. 
19
. As we know, every project suffers from start-up 
problems of some sort. Superintendents and 
project managers are very busy trying to get 
everybody working in a productivity manner. 
Therefore, if we can start with a small crew and 
increase its size gradually, we will eliminate some 
of the start-up problems. 
. Most projects suffer from congestion around 
project completion time because of reduced work 
areas. Thus, if we can gradually reduce the crew 
size as we approach project completion, we can 
improve productivity by reducing congestion. 
20
The leveling procedure are as follows: 
• Scheduling all the critical jobs first. 
• Starting the non-critical jobs whenever there 
is a drop in scheduled man power upto the 
point where the peak is reached. 
• Starting the non-critical jobs whenever there 
is a drop so that no ups and downs occur in 
the resource profile. 
21
› Time Limited: The project must be finished by a 
certain time, using as few resources as possible. 
But it is time, not resource usage, that is critical 
22
Resource Histograms: 
• A bar chart showing the amount of time 
assigned to a resource for the time interval. 
• Resource availability is depicted as a line for 
comparison purposes. 
• Resources assigned more work than 
available hours are considered “over-allocated”. 
23
INTRODUCTION 
ERP is a business management software, 
usually a suite of integrated applications, that a 
company can use to store and manage data 
from every stage of business, including: 
Product planning, cost and development 
Manufacturing 
Marketing and sales 
Inventory management 
Shipping and payment 
24
ERP systems could be used in the construction 
industry for the following general purposes: 
1. To improve responsibilities in relation to 
customers. 
2. To strength supply chain partnerships. 
3. To enhance organizational flexibility. 
4. To improve decision-making capabilities. 
5. To reduce project completion time and cost. 
25
26
27
Without the proper resource allocation, one will 
pay the price for late job completions and cost 
overruns. 
The goal of resource leveling is to assign 
resources to project activities in a manner that 
will improve productivity and efficiency. 
During the last two decades, the construction 
industry has progressed in this trend of 
improving resource allocation it merely out of 
interest but as a means of survival in a more 
competitive world. 
28
29
30

More Related Content

What's hot

RESOURCE LEVELLING (MS PROJECT)
RESOURCE LEVELLING (MS PROJECT)RESOURCE LEVELLING (MS PROJECT)
RESOURCE LEVELLING (MS PROJECT)Mayur Rahangdale
 
Network Problem CPM & PERT
Network Problem CPM &  PERTNetwork Problem CPM &  PERT
Network Problem CPM & PERTPulchowk Campus
 
Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management A Makwana
 
Strategic project management
Strategic project managementStrategic project management
Strategic project managementRamesh Dorairaj
 
Financial & Economic Evaluation of projects
Financial & Economic Evaluation of projectsFinancial & Economic Evaluation of projects
Financial & Economic Evaluation of projectsamanideutsch
 
Aggragate planning1
Aggragate planning1Aggragate planning1
Aggragate planning1arathymalz
 
6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource SmoothingDavidMcLachlan1
 
Jonson"s Rule Production scheduling
 Jonson"s Rule Production scheduling Jonson"s Rule Production scheduling
Jonson"s Rule Production schedulingmrinalmanik64
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP. shoaibzaheer1
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisAsif Sultan Razu
 

What's hot (20)

RESOURCE LEVELLING (MS PROJECT)
RESOURCE LEVELLING (MS PROJECT)RESOURCE LEVELLING (MS PROJECT)
RESOURCE LEVELLING (MS PROJECT)
 
Network Problem CPM & PERT
Network Problem CPM &  PERTNetwork Problem CPM &  PERT
Network Problem CPM & PERT
 
Forecasting
ForecastingForecasting
Forecasting
 
Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management
 
Strategic project management
Strategic project managementStrategic project management
Strategic project management
 
Financial & Economic Evaluation of projects
Financial & Economic Evaluation of projectsFinancial & Economic Evaluation of projects
Financial & Economic Evaluation of projects
 
Aggragate planning1
Aggragate planning1Aggragate planning1
Aggragate planning1
 
Cpm and pert
Cpm and pertCpm and pert
Cpm and pert
 
S curves
S curvesS curves
S curves
 
CPM AND PERT
CPM AND PERTCPM AND PERT
CPM AND PERT
 
Resource allocation and smoothing
Resource allocation and smoothingResource allocation and smoothing
Resource allocation and smoothing
 
Resource allocation
Resource allocationResource allocation
Resource allocation
 
S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6
 
6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing
 
Module :-5 project scheduling and resource levelling
Module :-5 project scheduling and resource levellingModule :-5 project scheduling and resource levelling
Module :-5 project scheduling and resource levelling
 
Time cost-trade-off
Time cost-trade-offTime cost-trade-off
Time cost-trade-off
 
Jonson"s Rule Production scheduling
 Jonson"s Rule Production scheduling Jonson"s Rule Production scheduling
Jonson"s Rule Production scheduling
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network Analysis
 

Similar to Resource planning and resource allocation

Resource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPResource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPSagar Kaptan
 
PM-Chapter8-1.pptx
PM-Chapter8-1.pptxPM-Chapter8-1.pptx
PM-Chapter8-1.pptxTecnicoItca
 
Scheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.pptScheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.pptTecnicoItca
 
PM Session 6
PM Session 6PM Session 6
PM Session 6dmdk12
 
Project typed
Project typedProject typed
Project typedRahul
 
Chapter-8-Post-Mid.ppt
Chapter-8-Post-Mid.pptChapter-8-Post-Mid.ppt
Chapter-8-Post-Mid.pptTecnicoItca
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWAREKHUSHBU SHAH
 
Project Resource Management-Good one.ppt
Project Resource Management-Good one.pptProject Resource Management-Good one.ppt
Project Resource Management-Good one.pptHabibullah Qayumi
 
Planning & Scheduling 222030008.pptx
Planning & Scheduling 222030008.pptxPlanning & Scheduling 222030008.pptx
Planning & Scheduling 222030008.pptxAditya Mane
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management A Makwana
 
Scheduling resources and costs is a crucial aspect of project management that...
Scheduling resources and costs is a crucial aspect of project management that...Scheduling resources and costs is a crucial aspect of project management that...
Scheduling resources and costs is a crucial aspect of project management that...THULASIMANOHARAN2
 
Lecture-8-Scheduling-Resources-and-Cost.pptx
Lecture-8-Scheduling-Resources-and-Cost.pptxLecture-8-Scheduling-Resources-and-Cost.pptx
Lecture-8-Scheduling-Resources-and-Cost.pptxTecnicoItca
 
SPM Resource Management
SPM Resource ManagementSPM Resource Management
SPM Resource ManagementSaqib Raza
 
SPM Resource Management
SPM Resource ManagementSPM Resource Management
SPM Resource ManagementSaqib Raza
 
SPM Resource Management
SPM Resource ManagementSPM Resource Management
SPM Resource ManagementSaqib Raza
 
Planning and scheduling Techniques.ppt
Planning and scheduling  Techniques.pptPlanning and scheduling  Techniques.ppt
Planning and scheduling Techniques.pptDejeneTsegaye6
 
Resource-Allocation.ppt
Resource-Allocation.pptResource-Allocation.ppt
Resource-Allocation.pptTecnicoItca
 

Similar to Resource planning and resource allocation (20)

Resource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSPResource scheduling in Construction Projects Using MSP
Resource scheduling in Construction Projects Using MSP
 
PM-Chapter8-1.pptx
PM-Chapter8-1.pptxPM-Chapter8-1.pptx
PM-Chapter8-1.pptx
 
Chap008.ppt
Chap008.pptChap008.ppt
Chap008.ppt
 
Project time management
Project time managementProject time management
Project time management
 
Allocating resources
Allocating resourcesAllocating resources
Allocating resources
 
Scheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.pptScheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.ppt
 
PM Session 6
PM Session 6PM Session 6
PM Session 6
 
Project typed
Project typedProject typed
Project typed
 
Chapter-8-Post-Mid.ppt
Chapter-8-Post-Mid.pptChapter-8-Post-Mid.ppt
Chapter-8-Post-Mid.ppt
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
 
Project Resource Management-Good one.ppt
Project Resource Management-Good one.pptProject Resource Management-Good one.ppt
Project Resource Management-Good one.ppt
 
Planning & Scheduling 222030008.pptx
Planning & Scheduling 222030008.pptxPlanning & Scheduling 222030008.pptx
Planning & Scheduling 222030008.pptx
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
 
Scheduling resources and costs is a crucial aspect of project management that...
Scheduling resources and costs is a crucial aspect of project management that...Scheduling resources and costs is a crucial aspect of project management that...
Scheduling resources and costs is a crucial aspect of project management that...
 
Lecture-8-Scheduling-Resources-and-Cost.pptx
Lecture-8-Scheduling-Resources-and-Cost.pptxLecture-8-Scheduling-Resources-and-Cost.pptx
Lecture-8-Scheduling-Resources-and-Cost.pptx
 
SPM Resource Management
SPM Resource ManagementSPM Resource Management
SPM Resource Management
 
SPM Resource Management
SPM Resource ManagementSPM Resource Management
SPM Resource Management
 
SPM Resource Management
SPM Resource ManagementSPM Resource Management
SPM Resource Management
 
Planning and scheduling Techniques.ppt
Planning and scheduling  Techniques.pptPlanning and scheduling  Techniques.ppt
Planning and scheduling Techniques.ppt
 
Resource-Allocation.ppt
Resource-Allocation.pptResource-Allocation.ppt
Resource-Allocation.ppt
 

Recently uploaded

DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming languageSmritiSharma901052
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfNainaShrivastava14
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 

Recently uploaded (20)

DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming language
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 

Resource planning and resource allocation

  • 1. Presented by : VENUMADHAV.R.YEMUL Guided by : MILIND.D.DARADE Roll No : 5073 1
  • 2. Manpower, equipment, and materials are important project resources that require management attention. The basic objective of resource planning and resource allocation is to supply and support the field operations. The term resource allocation is used in the case where required resources are assigned such that available resources are not exceeded. 2
  • 3. Resources are the means of production needed to complete a project. Most project managers would consider the big three resources that will require your attention to be: • Material • Labor • Equipment 3
  • 4. A. LABOUR a. In the limited resource allocation case, there are two assumptions: (1) There are a fixed number of crews available to perform the work and (2) The project may be delayed as a result of the limitation of crews. The objective of the resource allocation problem is to determine when the project will be completed. 4
  • 5. b. In the unlimited resource leveling case, there are two assumptions: (1) There are an unlimited number of crews available to perform the work and (2) The project may not be delayed. The objective of the resource leveling problem is to determine how to limit the fluctuation in crews required on the job. 5
  • 6. B. MATERIALS Materials, for projects with sufficient on-site storage, are delivered to the site and assumed to be available to workers as needed. A material-related concern for sites that have sufficient space is that of optimizing the position of materials on the site so that they require the least travel time from the lay-down yard to the work-face. 6
  • 7. C. EQUIPMENTS There are various types of equipment used on construction sites. Some of this equipment should be considered in the project plan, some need not be included. Workers, and their companies, are typically required to provide the small tools needed to complete their specific features of work. There are some types of equipment, however, that can affect the overall sequence and duration of the project. 7
  • 8. Resource allocation is used to assign the available resources in an economic way. It is part of resource management. In project management, resource allocation is the scheduling of activities and the resources required by those activities while taking into consideration both the resource availability and the project time. 8
  • 9. Resource planning cannot be accomplished without four essential resources necessary to accomplish the given scope of work: • MATERIAL • MAN POWER • MACHINARY • TIME 9
  • 10. Human resources for construction planning breaks down into three major categories as follows: • Home office personnel(Administrative Persons) • Construction personnel (field supervision and labor) • Construction subcontractors(Electrification, Plumbing, etc) 10
  • 11. The ideal form of a personnel loading curves is a trapezoid. The average personnel loading curve is a straight line. Actual practice loading curves take the shape of a bell curve 11
  • 12. 12
  • 13. The latter two result when the personnel loading curves occur earlier or later than planned on a project. Front loaded curve- the work started as early as possible. Normal loaded curve- the work started at normal time. Back loaded curve- the work started as late as possible. 13
  • 14. The "S" curve for the ideally loaded project has a gradual start and finish, which indicates smooth starting and finishing conditions. The forward loaded curve shows a rapid project start up and an even more gradual than normal phase out at the end. The backward-loaded project indicates a more relaxed start and a very steep finish slope on the "S" curve. 14
  • 15. 15
  • 16. 16
  • 17. Ensuring that the material resources for the project arrive on time involves these important planning areas: • Long-delivery equipment • Special materials and alloys • Common materials in short supply • Services and system requirements • Transportation systems 17
  • 18. Resource Limited: The project must be finished as soon as possible, but without exceeding some specific level of resource usage or some general resource constraint 18
  • 19. 1. When the schedule demands more workers per day than are available or if we have workers standing around without jobs, we have a problem. 2. When a new hire is trained, there is loss of productivity. So, if we can keep the trained people and reduce the number of new hires, we should be better off. 19
  • 20. . As we know, every project suffers from start-up problems of some sort. Superintendents and project managers are very busy trying to get everybody working in a productivity manner. Therefore, if we can start with a small crew and increase its size gradually, we will eliminate some of the start-up problems. . Most projects suffer from congestion around project completion time because of reduced work areas. Thus, if we can gradually reduce the crew size as we approach project completion, we can improve productivity by reducing congestion. 20
  • 21. The leveling procedure are as follows: • Scheduling all the critical jobs first. • Starting the non-critical jobs whenever there is a drop in scheduled man power upto the point where the peak is reached. • Starting the non-critical jobs whenever there is a drop so that no ups and downs occur in the resource profile. 21
  • 22. › Time Limited: The project must be finished by a certain time, using as few resources as possible. But it is time, not resource usage, that is critical 22
  • 23. Resource Histograms: • A bar chart showing the amount of time assigned to a resource for the time interval. • Resource availability is depicted as a line for comparison purposes. • Resources assigned more work than available hours are considered “over-allocated”. 23
  • 24. INTRODUCTION ERP is a business management software, usually a suite of integrated applications, that a company can use to store and manage data from every stage of business, including: Product planning, cost and development Manufacturing Marketing and sales Inventory management Shipping and payment 24
  • 25. ERP systems could be used in the construction industry for the following general purposes: 1. To improve responsibilities in relation to customers. 2. To strength supply chain partnerships. 3. To enhance organizational flexibility. 4. To improve decision-making capabilities. 5. To reduce project completion time and cost. 25
  • 26. 26
  • 27. 27
  • 28. Without the proper resource allocation, one will pay the price for late job completions and cost overruns. The goal of resource leveling is to assign resources to project activities in a manner that will improve productivity and efficiency. During the last two decades, the construction industry has progressed in this trend of improving resource allocation it merely out of interest but as a means of survival in a more competitive world. 28
  • 29. 29
  • 30. 30