Corrosion
        Under
                      Insulation
                           Loop steam drum


     Present by :   Patiphon Suksawat
Contents
Leader
                                     Patiphon Suksawat




                             Consultant



Wasan Cheeppensuk                              Atip Nualnet
                            CUI team




Komsan Bangkrut     Nawa Bunsayang        Narong Sakulprasitsiri
What is CUI (Corrosion Under Insulation) ?
        - CUI is a particularly severe form of localized corrosion
that has been plaguing chemical process industries since the
energy crisis of the       s forced plant designers to include much
more insulation in their designs
        - Intruding water is the key problem in CUI Special care
must be taken during design not to promote corrosion by
permitting water to enter a system either directly or indirectly by
capillary action
What is CUI (Corrosion Under Insulation) ?


                External damage



    Carbon steels or          Stainless
     low alloy steels           steels




                           Subject to stress
  Subject to thinning
                          corrosion cracking
•   CUI is the mainly problem in petrochemical
    plant.
•   Current Inspection Program is not consider
    corrosion under insulation problem.
•   Increase Reliability of Plant.




                        Reference TPE
Conclusion and Future action Plan

                 Inspection ( Visual and Ultrasonic Testing)

                 Risk Evaluation and Identification

              List up EQ and Collection Data

    Make Inspection Guide Line (Check Sheet)

      Select Loop To Implement CUI

Study CUI Theory From API 581, 570
Schedule
Insulated Piping Systems
    Susceptible to CUI

1. Carbon steel piping systems, including those insulated
   operating between (– C to           C).
2. Austenitic stainless steel piping systems operating
   between ( C–           C).
Common Locations on Piping Systems
Susceptible to CUI




      Flange                Tee


                            Valve
Common Locations on Piping Systems
Susceptible to CUI




                              Ve
                              nt




 Insulation has          Support point
Guide Line for CUI inspection




                               No




                Yes


                                No



                Yes




                      - 12 -
Check Sheet




              - 13 -
Loop steam drum

              TE-201

                                 PM-500 A,B



                                              PE-302
                       TD-1203


                       TD-1201



                       TD-1210
    TA-203A


     PE-502




                                      PD-1205
List up Equipment
    No.               Line No.                 No.                Line No.

          10BW-0201-4B-3P2-H3-17K                    1S-0201-2B-P2
          10BW-0202-4B-3P2-H3-17K                    1S-0202-1.5B-P2
          10BW-0203-2B-1P2-H3-13.5K                  1S-0203-2B-P2
          10BW-0205-3B-P2(1S1(V))-H2-5K              1S-0205-3B-P2
          10BW-0208-6B-1P2-H3-13.5K                  25SC-0001-6B-3P2-H3-28.5K
          10BW-0209-6B-1P2-H3-13.5K                  25SC-0001-6B-3S1-H3-28.5K
          10S-0006-4B-1P2-H3-13.5K                   25SC-0004-6B-3S1-H3-28.5K
          10SC-0001-6B-1S1(V)-H3-13.5K               3BW-0201-3B-1P2-H2-13.5K
          10SC-0002-4B-1P2-H3-13.5K                  3BW-0202-3B-1P2-H2-13.5K
          1BW-0201-6B-P2-H-9.5K                      3BW-0203-1B-1S1(V)-H2-5K
          1BW-0202-6B-P2-H-9.5K                      3BW-0203-1B-P2-H2-5K
          1BW-0203-1.5B-1S1(V)-H-5K                  3BW-0204-3B-P2-H2-5K
          1BW-0205-2B-P2-H-9.5K                      3BW-0204-4B-PS(1S1(V))-H2-5K
          1BW-0206-3B-P2-H-9.5K                      3BW-0205-3B-P2-H2-5K
          1BW-0210-6B-P2-H-5K                        3S-0001-12B-P2-H2-5K
          1BW-0211-8B-P2-H-5K                        3S-0009-4B-P2-H2-5K
          1BW-0212-8B-P2-H-5K                        3SC-0008-8B-1S1(V)-H2-5K
          1BW-2202-4B-P2-H-5K                        3SC-0202-3B-P2(1S1(V))-H2-5K
          1S-0001-4B-P2-H-5K                         3SC-5502-4B-P2-H2-5K
          1S-0005-6B-P2-H-5K                         LPW-0001-3B-1S1(J)-H-13.5K

                                          - 15 -
List up Equipment
    No.               Line No.                 No.               Line No.




          10BW-0205-3B-P2(1S1(V))-H2-5K


                                                     25SC-0001-6B-3S1-H3-28.5K
                                                     25SC-0004-6B-3S1-H3-28.5K
          10SC-0001-6B-1S1(V)-H3-13.5K


          1BW-0201-6B-P2-H-9.5K                      3BW-0203-1B-1S1(V)-H2-5K
          1BW-0202-6B-P2-H-9.5K
          1BW-0203-1.5B-1S1(V)-H-5K
          1BW-0205-2B-P2-H-9.5K                      3BW-0204-4B-PS(1S1(V))-H2-5K
          1BW-0206-3B-P2-H-9.5K
          1BW-0210-6B-P2-H-5K
          1BW-0211-8B-P2-H-5K
          1BW-0212-8B-P2-H-5K                        3SC-0008-8B-1S1(V)-H2-5K
          1BW-2202-4B-P2-H-5K                        3SC-0202-3B-P2(1S1(V))-H2-5K
          1S-0001-4B-P2-H-5K
          1S-0005-6B-P2-H-5K                         LPW-0001-3B-1S1(J)-H-13.5K

                                          - 16 -
Collection Data
Collection Data
Collection Data
Consequence of failure rating
Consequence
                    1              2                  3             4             5
   class
                No / Slight      Minor              Local         Major        Extensive
 Economics       Damage         Damage             Damage        Damage         Damage
                 < 0.4 M      0.4 – 4 M        4 – 40 M        40 – 400 M      > 400 M
                No / Slight                                                    Multiple
Health & Safe                 Minor Injury    Major Injury     Single Injury
                  Injury                                                        Injury
                No / Slight      Minor             Localized      Major         Massive
Environment
                  effect         effect             effect        effect         effect




                                                   Select 3


              Example
                                          - 20 -
Probability Score Table of Carbon Steel
                             Initial
         Operating                                          Wall thickness Internal corrosion    External coil /      External
Point                       Coating       Insulation Type
        Temperature                                         surface feature   / erosion rate     Steam tracing      environment
                             Status

         > 175 0C
                         Full QA paint
 0          Or                                                                   Negligible       Not present      Inside Building
                          protection
          < -5 0C

                                             Perlite
                                           Foamglass                                                                Rarely wetted
                                                                                    Low          High Integrity
 1      150 – 175   0C                     Closed cell         >7.1 mm                                              (<10% of the
                                                                               ( < 0.1 mm/y)        design
                                           Foam (right                                                                  time)
                                              type)

                          Normal QA        Fiberglass        4 – 7.1 mm or
         -5 – 500C            paint         Cal Sil,        surface location                                        Intermittently
                                                                                  Medium        Medium Integrity
 3            or            protection     Asbestos          of penetrations                                       wetted (~40% of
                                                                               (0.1-0.4 mm/y)       design
        120 – 150 0C      field weld at   Mineral Rock           through                                               the time)
                          construction       wool               insulation

                                                               < 4 mm or
                                                                                                                    Permanently
                                                               surface at
                                                                                                                    wetted (e.g.
                          Unpainted or                        location of          High          Low Integrity
 5      50 – 120 0C                                                                                                condensation,
                           Unknown                          reinforcement      ( >0.4 mm/y)        design
                                                                                                                   cooling tower
                                                             ring & other
                                                                                                                   dripping water
                                          5+5+1+1+1+0+1 = 14  water traps


     score               Example
Probability Score Table of Stainless Steel

             Operating       Initial Coating                           External coil /      External
Points                                           Insulation Type
            Temperature           Status                               Steam tracing      environment

          Constantly > 150                         Low chloride
          0C or Constantly   Full QA paint
  0                                             insulation material     Not present      Inside Building
                              protection
              < 50 0C                             (<10 ppm Cl-)

                                                                                          Rarely wetted
                                                                       High Integrity
  2                                                                                       (<10% of the
                                                                          design
                                                                                              time)

                                                                                          Permanently
                             Normal QA paint
                             protection field
                                                                                          wetted (e.g.
                                                                      Medium Integrity
  4        120 – 150 0C         weld at                                                  condensation,
                                                                          design
                              construction                                               cooling tower
                                                                                         dripping water


                                                  Higher chloride                         Intermittently
                             Unpainted or                              Low Integrity
  7         50 – 120 0C                         insulation material                      wetted (~40% of
                              Unknown                                    design
                                                  (>10 ppm Cl-)                             the time)


  score
                                                   - 22 -
CUI Criticality ranking




     Example
                  - 23 -
CUI Confidence rating
                    CUI Confidence Questions                     Yes   Interm   NO
  Cladding and Insulation conditions
      -Cladding/Insulation fully maintained : Yes
                                                                 +1      0      -1
                     0 -1 + 0 = - 1
      -Cladding/Insulation normal : Interm
      -Cladding/Insulation in poor condition : NO
  Multiple reliable inspections for CUI have been carried been
  carried out
      -Frequent inspection and selective delagly fallowed by
                                                                 +1      0      -1
  appropriate remedial action : Yes
      -Inspection irregular / not standard : Interm
      - No proper inspections : No
  Monitoring CUI promoting condition
      - The pressure of all possible CUI promoting condition
  (see susceptibility categories) has been established and
  quantified : Yes
      - The operating temperature is monitored and constantly    +1      0      -1
  in identified rouge and coating condition is know /
  established : Interm
      - The operating temperature is not established or the
  coating condition is not know : No




            score                Example


                                              - 24 -
Strategy Matrix for Carbon Steel




                     Strategy 3




      Example
                   - 25 -
Strategy Matrix for Stainless Steel




                    - 26 -
Strategies for Carbon steel
Strategies for Carbon steel
Strategies for Stainless Steel
Strategy flowchart
                                             Strategy 3


                                    Yes                                     No
                                             Piping > 8 in


          100 % NDE and delegging of all                                Delegging of
           susceptible area within 6 years                          susceptible within 6
                                                                            years

                                   Yes                                      No
                                               Significant
                                               CUI found


Every              Delag 100%                                          Delag more selective area
6 years            within 1 year                                             Within 1 year                       Every
                                                                                                                 6 years


                                                                               Significant
                                                                               CUI found                  No
                 Repair and Paint                         Yes


                                                100 % delegging , repair and paint           Adjust confidence
                                                          within 1 year                          with +1
Risk Evaluation and Identification
CUI Criticality ranking




                          Medium High
                          Medium
                          Noinspection
Strategy Matrix




                  Strategy
                  Strategy
                  No inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Strategy flowchart
                                             Strategy 3


                                    Yes                                     No
                                             Piping > 8 in


          100 % NDE and delegging of all                                Delegging of
           susceptible area within 6 years                          susceptible within 6
                                                                            years

                                   Yes                                      No
                                               Significant
                                               CUI found


Every              Delag 100%                                          Delag more selective area
6 years            within 1 year                                             Within 1 year                       Every
                                                                                                                 6 years


                                                                               Significant
                                                                               CUI found                  No
                 Repair and Paint                         Yes


                                                100 % delegging , repair and paint           Adjust confidence
                                                          within 1 year                          with +1
Inspection
Risk management

  Corrosion

     Think of module

        Friendship
Thank You
N/A = not available




Internal Use Only – Do not distribute

More Related Content

What's hot

Wis5 stress and distortion 15
Wis5 stress and distortion 15Wis5 stress and distortion 15
Wis5 stress and distortion 15Thang Do Minh
 
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdf
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdfINSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdf
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdfTeddy Setiady
 
Corrosion Under Insulation Inspection In Ammonia Urea Plant
Corrosion Under Insulation Inspection In Ammonia Urea PlantCorrosion Under Insulation Inspection In Ammonia Urea Plant
Corrosion Under Insulation Inspection In Ammonia Urea PlantAsirul Hoq
 
Magnetite layer
Magnetite layerMagnetite layer
Magnetite layerImran Khan
 
Structural Steel Welding Inspection
Structural Steel Welding InspectionStructural Steel Welding Inspection
Structural Steel Welding InspectionAsirul Hoq
 
List of API standards for rotating equipment
List of API standards for rotating equipmentList of API standards for rotating equipment
List of API standards for rotating equipmentravisriniv
 
Corrosion Sl Part Two
Corrosion Sl Part TwoCorrosion Sl Part Two
Corrosion Sl Part TwoSteve1954
 
CSWIP 3.2 New BOOK.pdf
CSWIP 3.2  New BOOK.pdfCSWIP 3.2  New BOOK.pdf
CSWIP 3.2 New BOOK.pdfVENKATESAN S
 
API 610 Centrifugal Pump Repairs By Clyde Union Pump Company
API 610 Centrifugal Pump Repairs By Clyde Union Pump CompanyAPI 610 Centrifugal Pump Repairs By Clyde Union Pump Company
API 610 Centrifugal Pump Repairs By Clyde Union Pump CompanyAbdulrahman Alkhowaiter
 
Hydrogen Induced Cracking
Hydrogen Induced CrackingHydrogen Induced Cracking
Hydrogen Induced Crackingguestc7cc985
 
Casting defects
Casting defectsCasting defects
Casting defectsDaniel raj
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Gaurav Singh Rajput
 
Piping components, materials, codes and standards part 1- pipe
Piping components, materials, codes and standards   part 1- pipePiping components, materials, codes and standards   part 1- pipe
Piping components, materials, codes and standards part 1- pipeAlireza Niakani
 

What's hot (20)

Wis5 stress and distortion 15
Wis5 stress and distortion 15Wis5 stress and distortion 15
Wis5 stress and distortion 15
 
Pipe Support Field Inspection, Installation & Maintenance
Pipe Support Field Inspection, Installation & MaintenancePipe Support Field Inspection, Installation & Maintenance
Pipe Support Field Inspection, Installation & Maintenance
 
Continuous casting of steel
Continuous casting of steel Continuous casting of steel
Continuous casting of steel
 
Piping materials lhk
Piping materials lhkPiping materials lhk
Piping materials lhk
 
Heat Treatment
Heat TreatmentHeat Treatment
Heat Treatment
 
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdf
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdfINSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdf
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdf
 
Corrosion Under Insulation Inspection In Ammonia Urea Plant
Corrosion Under Insulation Inspection In Ammonia Urea PlantCorrosion Under Insulation Inspection In Ammonia Urea Plant
Corrosion Under Insulation Inspection In Ammonia Urea Plant
 
Magnetite layer
Magnetite layerMagnetite layer
Magnetite layer
 
Structural Steel Welding Inspection
Structural Steel Welding InspectionStructural Steel Welding Inspection
Structural Steel Welding Inspection
 
Gaskets
GasketsGaskets
Gaskets
 
List of API standards for rotating equipment
List of API standards for rotating equipmentList of API standards for rotating equipment
List of API standards for rotating equipment
 
Corrosion Sl Part Two
Corrosion Sl Part TwoCorrosion Sl Part Two
Corrosion Sl Part Two
 
CSWIP 3.2 New BOOK.pdf
CSWIP 3.2  New BOOK.pdfCSWIP 3.2  New BOOK.pdf
CSWIP 3.2 New BOOK.pdf
 
API 610 Centrifugal Pump Repairs By Clyde Union Pump Company
API 610 Centrifugal Pump Repairs By Clyde Union Pump CompanyAPI 610 Centrifugal Pump Repairs By Clyde Union Pump Company
API 610 Centrifugal Pump Repairs By Clyde Union Pump Company
 
Hydrogen Induced Cracking
Hydrogen Induced CrackingHydrogen Induced Cracking
Hydrogen Induced Cracking
 
Casting defects
Casting defectsCasting defects
Casting defects
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
 
Cracks in-welds
Cracks in-weldsCracks in-welds
Cracks in-welds
 
Piping components, materials, codes and standards part 1- pipe
Piping components, materials, codes and standards   part 1- pipePiping components, materials, codes and standards   part 1- pipe
Piping components, materials, codes and standards part 1- pipe
 
API 653 TANK INSPECTION.pdf
API 653 TANK INSPECTION.pdfAPI 653 TANK INSPECTION.pdf
API 653 TANK INSPECTION.pdf
 

Similar to Corrosion under insulation

Original PNP Transistor BF421 421 TO-92 New
Original PNP Transistor BF421 421 TO-92 NewOriginal PNP Transistor BF421 421 TO-92 New
Original PNP Transistor BF421 421 TO-92 NewAUTHELECTRONIC
 
BOOST110.pdf
BOOST110.pdfBOOST110.pdf
BOOST110.pdftahar6
 
J108 component replacement
J108 component replacementJ108 component replacement
J108 component replacementGabby Ukago
 
Lect2 up080 (100324)
Lect2 up080 (100324)Lect2 up080 (100324)
Lect2 up080 (100324)aicdesign
 
Original PNP Transistor 2SA2098 SA2098 2098 TO-220 New Sanyo
Original PNP Transistor 2SA2098 SA2098 2098 TO-220 New SanyoOriginal PNP Transistor 2SA2098 SA2098 2098 TO-220 New Sanyo
Original PNP Transistor 2SA2098 SA2098 2098 TO-220 New SanyoAUTHELECTRONIC
 
Fuji sc and sw series contactors
Fuji sc and sw series contactorsFuji sc and sw series contactors
Fuji sc and sw series contactorsEko Kiswanto
 
Vlt hvac basic_quick_start_guide_fc101
Vlt hvac basic_quick_start_guide_fc101Vlt hvac basic_quick_start_guide_fc101
Vlt hvac basic_quick_start_guide_fc101Toàn Huỳnh
 
QES___________datasheet_____Crimping.pdf
QES___________datasheet_____Crimping.pdfQES___________datasheet_____Crimping.pdf
QES___________datasheet_____Crimping.pdfIvanHerrera897380
 
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...AUTHELECTRONIC
 
TMQC-Pipeline NDT2015
TMQC-Pipeline NDT2015TMQC-Pipeline NDT2015
TMQC-Pipeline NDT2015Ping Hung Lee
 
Original PNP Transistor BC560C BC560 560 TO-92 New
Original PNP Transistor BC560C BC560 560 TO-92 NewOriginal PNP Transistor BC560C BC560 560 TO-92 New
Original PNP Transistor BC560C BC560 560 TO-92 NewAUTHELECTRONIC
 
Original NPN Transistor DTC143ESATP DTC143 C143 TO-92 New
Original NPN Transistor DTC143ESATP DTC143 C143 TO-92 NewOriginal NPN Transistor DTC143ESATP DTC143 C143 TO-92 New
Original NPN Transistor DTC143ESATP DTC143 C143 TO-92 NewAUTHELECTRONIC
 
Original Opto LTV-354T LTV354T 354T 354 SOP-4 New
Original Opto LTV-354T LTV354T 354T 354 SOP-4 NewOriginal Opto LTV-354T LTV354T 354T 354 SOP-4 New
Original Opto LTV-354T LTV354T 354T 354 SOP-4 NewAUTHELECTRONIC
 
06 pinze di-terra-eng
06 pinze di-terra-eng06 pinze di-terra-eng
06 pinze di-terra-engHai Pham
 
WEG Contactors Oveload Relays
WEG Contactors Oveload RelaysWEG Contactors Oveload Relays
WEG Contactors Oveload RelaysAllan Bernardino
 
Miniature Circuit Breakers BC-E Series - Fuji Electric
Miniature Circuit Breakers BC-E Series - Fuji ElectricMiniature Circuit Breakers BC-E Series - Fuji Electric
Miniature Circuit Breakers BC-E Series - Fuji ElectricCTY TNHH HẠO PHƯƠNG
 

Similar to Corrosion under insulation (20)

Original PNP Transistor BF421 421 TO-92 New
Original PNP Transistor BF421 421 TO-92 NewOriginal PNP Transistor BF421 421 TO-92 New
Original PNP Transistor BF421 421 TO-92 New
 
BOOST110.pdf
BOOST110.pdfBOOST110.pdf
BOOST110.pdf
 
J108 component replacement
J108 component replacementJ108 component replacement
J108 component replacement
 
Lect2 up080 (100324)
Lect2 up080 (100324)Lect2 up080 (100324)
Lect2 up080 (100324)
 
Original PNP Transistor 2SA2098 SA2098 2098 TO-220 New Sanyo
Original PNP Transistor 2SA2098 SA2098 2098 TO-220 New SanyoOriginal PNP Transistor 2SA2098 SA2098 2098 TO-220 New Sanyo
Original PNP Transistor 2SA2098 SA2098 2098 TO-220 New Sanyo
 
Fuji sc and sw series contactors
Fuji sc and sw series contactorsFuji sc and sw series contactors
Fuji sc and sw series contactors
 
Vlt hvac basic_quick_start_guide_fc101
Vlt hvac basic_quick_start_guide_fc101Vlt hvac basic_quick_start_guide_fc101
Vlt hvac basic_quick_start_guide_fc101
 
JVC AX-V8000
JVC AX-V8000JVC AX-V8000
JVC AX-V8000
 
QES___________datasheet_____Crimping.pdf
QES___________datasheet_____Crimping.pdfQES___________datasheet_____Crimping.pdf
QES___________datasheet_____Crimping.pdf
 
RICH
RICHRICH
RICH
 
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
Original NPN Darlington Transistor MC1413DR2G 1413DR2G NCV1413BDG 1413BDG 141...
 
TMQC-Pipeline NDT2015
TMQC-Pipeline NDT2015TMQC-Pipeline NDT2015
TMQC-Pipeline NDT2015
 
Original PNP Transistor BC560C BC560 560 TO-92 New
Original PNP Transistor BC560C BC560 560 TO-92 NewOriginal PNP Transistor BC560C BC560 560 TO-92 New
Original PNP Transistor BC560C BC560 560 TO-92 New
 
Original NPN Transistor DTC143ESATP DTC143 C143 TO-92 New
Original NPN Transistor DTC143ESATP DTC143 C143 TO-92 NewOriginal NPN Transistor DTC143ESATP DTC143 C143 TO-92 New
Original NPN Transistor DTC143ESATP DTC143 C143 TO-92 New
 
Original Opto LTV-354T LTV354T 354T 354 SOP-4 New
Original Opto LTV-354T LTV354T 354T 354 SOP-4 NewOriginal Opto LTV-354T LTV354T 354T 354 SOP-4 New
Original Opto LTV-354T LTV354T 354T 354 SOP-4 New
 
Accessories ds 20111018
Accessories ds 20111018Accessories ds 20111018
Accessories ds 20111018
 
06 pinze di-terra-eng
06 pinze di-terra-eng06 pinze di-terra-eng
06 pinze di-terra-eng
 
WEG Contactors Oveload Relays
WEG Contactors Oveload RelaysWEG Contactors Oveload Relays
WEG Contactors Oveload Relays
 
Miniature Circuit Breakers BC-E Series - Fuji Electric
Miniature Circuit Breakers BC-E Series - Fuji ElectricMiniature Circuit Breakers BC-E Series - Fuji Electric
Miniature Circuit Breakers BC-E Series - Fuji Electric
 
Day 3
Day 3Day 3
Day 3
 

Recently uploaded

Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 

Recently uploaded (20)

Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 

Corrosion under insulation

  • 1. Corrosion Under Insulation Loop steam drum Present by : Patiphon Suksawat
  • 3. Leader Patiphon Suksawat Consultant Wasan Cheeppensuk Atip Nualnet CUI team Komsan Bangkrut Nawa Bunsayang Narong Sakulprasitsiri
  • 4. What is CUI (Corrosion Under Insulation) ? - CUI is a particularly severe form of localized corrosion that has been plaguing chemical process industries since the energy crisis of the s forced plant designers to include much more insulation in their designs - Intruding water is the key problem in CUI Special care must be taken during design not to promote corrosion by permitting water to enter a system either directly or indirectly by capillary action
  • 5. What is CUI (Corrosion Under Insulation) ? External damage Carbon steels or Stainless low alloy steels steels Subject to stress Subject to thinning corrosion cracking
  • 6. CUI is the mainly problem in petrochemical plant. • Current Inspection Program is not consider corrosion under insulation problem. • Increase Reliability of Plant. Reference TPE
  • 7. Conclusion and Future action Plan Inspection ( Visual and Ultrasonic Testing) Risk Evaluation and Identification List up EQ and Collection Data Make Inspection Guide Line (Check Sheet) Select Loop To Implement CUI Study CUI Theory From API 581, 570
  • 9. Insulated Piping Systems Susceptible to CUI 1. Carbon steel piping systems, including those insulated operating between (– C to C). 2. Austenitic stainless steel piping systems operating between ( C– C).
  • 10. Common Locations on Piping Systems Susceptible to CUI Flange Tee Valve
  • 11. Common Locations on Piping Systems Susceptible to CUI Ve nt Insulation has Support point
  • 12. Guide Line for CUI inspection No Yes No Yes - 12 -
  • 13. Check Sheet - 13 -
  • 14. Loop steam drum TE-201 PM-500 A,B PE-302 TD-1203 TD-1201 TD-1210 TA-203A PE-502 PD-1205
  • 15. List up Equipment No. Line No. No. Line No. 10BW-0201-4B-3P2-H3-17K 1S-0201-2B-P2 10BW-0202-4B-3P2-H3-17K 1S-0202-1.5B-P2 10BW-0203-2B-1P2-H3-13.5K 1S-0203-2B-P2 10BW-0205-3B-P2(1S1(V))-H2-5K 1S-0205-3B-P2 10BW-0208-6B-1P2-H3-13.5K 25SC-0001-6B-3P2-H3-28.5K 10BW-0209-6B-1P2-H3-13.5K 25SC-0001-6B-3S1-H3-28.5K 10S-0006-4B-1P2-H3-13.5K 25SC-0004-6B-3S1-H3-28.5K 10SC-0001-6B-1S1(V)-H3-13.5K 3BW-0201-3B-1P2-H2-13.5K 10SC-0002-4B-1P2-H3-13.5K 3BW-0202-3B-1P2-H2-13.5K 1BW-0201-6B-P2-H-9.5K 3BW-0203-1B-1S1(V)-H2-5K 1BW-0202-6B-P2-H-9.5K 3BW-0203-1B-P2-H2-5K 1BW-0203-1.5B-1S1(V)-H-5K 3BW-0204-3B-P2-H2-5K 1BW-0205-2B-P2-H-9.5K 3BW-0204-4B-PS(1S1(V))-H2-5K 1BW-0206-3B-P2-H-9.5K 3BW-0205-3B-P2-H2-5K 1BW-0210-6B-P2-H-5K 3S-0001-12B-P2-H2-5K 1BW-0211-8B-P2-H-5K 3S-0009-4B-P2-H2-5K 1BW-0212-8B-P2-H-5K 3SC-0008-8B-1S1(V)-H2-5K 1BW-2202-4B-P2-H-5K 3SC-0202-3B-P2(1S1(V))-H2-5K 1S-0001-4B-P2-H-5K 3SC-5502-4B-P2-H2-5K 1S-0005-6B-P2-H-5K LPW-0001-3B-1S1(J)-H-13.5K - 15 -
  • 16. List up Equipment No. Line No. No. Line No. 10BW-0205-3B-P2(1S1(V))-H2-5K 25SC-0001-6B-3S1-H3-28.5K 25SC-0004-6B-3S1-H3-28.5K 10SC-0001-6B-1S1(V)-H3-13.5K 1BW-0201-6B-P2-H-9.5K 3BW-0203-1B-1S1(V)-H2-5K 1BW-0202-6B-P2-H-9.5K 1BW-0203-1.5B-1S1(V)-H-5K 1BW-0205-2B-P2-H-9.5K 3BW-0204-4B-PS(1S1(V))-H2-5K 1BW-0206-3B-P2-H-9.5K 1BW-0210-6B-P2-H-5K 1BW-0211-8B-P2-H-5K 1BW-0212-8B-P2-H-5K 3SC-0008-8B-1S1(V)-H2-5K 1BW-2202-4B-P2-H-5K 3SC-0202-3B-P2(1S1(V))-H2-5K 1S-0001-4B-P2-H-5K 1S-0005-6B-P2-H-5K LPW-0001-3B-1S1(J)-H-13.5K - 16 -
  • 20. Consequence of failure rating Consequence 1 2 3 4 5 class No / Slight Minor Local Major Extensive Economics Damage Damage Damage Damage Damage < 0.4 M 0.4 – 4 M 4 – 40 M 40 – 400 M > 400 M No / Slight Multiple Health & Safe Minor Injury Major Injury Single Injury Injury Injury No / Slight Minor Localized Major Massive Environment effect effect effect effect effect Select 3 Example - 20 -
  • 21. Probability Score Table of Carbon Steel Initial Operating Wall thickness Internal corrosion External coil / External Point Coating Insulation Type Temperature surface feature / erosion rate Steam tracing environment Status > 175 0C Full QA paint 0 Or Negligible Not present Inside Building protection < -5 0C Perlite Foamglass Rarely wetted Low High Integrity 1 150 – 175 0C Closed cell >7.1 mm (<10% of the ( < 0.1 mm/y) design Foam (right time) type) Normal QA Fiberglass 4 – 7.1 mm or -5 – 500C paint Cal Sil, surface location Intermittently Medium Medium Integrity 3 or protection Asbestos of penetrations wetted (~40% of (0.1-0.4 mm/y) design 120 – 150 0C field weld at Mineral Rock through the time) construction wool insulation < 4 mm or Permanently surface at wetted (e.g. Unpainted or location of High Low Integrity 5 50 – 120 0C condensation, Unknown reinforcement ( >0.4 mm/y) design cooling tower ring & other dripping water 5+5+1+1+1+0+1 = 14 water traps score Example
  • 22. Probability Score Table of Stainless Steel Operating Initial Coating External coil / External Points Insulation Type Temperature Status Steam tracing environment Constantly > 150 Low chloride 0C or Constantly Full QA paint 0 insulation material Not present Inside Building protection < 50 0C (<10 ppm Cl-) Rarely wetted High Integrity 2 (<10% of the design time) Permanently Normal QA paint protection field wetted (e.g. Medium Integrity 4 120 – 150 0C weld at condensation, design construction cooling tower dripping water Higher chloride Intermittently Unpainted or Low Integrity 7 50 – 120 0C insulation material wetted (~40% of Unknown design (>10 ppm Cl-) the time) score - 22 -
  • 23. CUI Criticality ranking Example - 23 -
  • 24. CUI Confidence rating CUI Confidence Questions Yes Interm NO Cladding and Insulation conditions -Cladding/Insulation fully maintained : Yes +1 0 -1 0 -1 + 0 = - 1 -Cladding/Insulation normal : Interm -Cladding/Insulation in poor condition : NO Multiple reliable inspections for CUI have been carried been carried out -Frequent inspection and selective delagly fallowed by +1 0 -1 appropriate remedial action : Yes -Inspection irregular / not standard : Interm - No proper inspections : No Monitoring CUI promoting condition - The pressure of all possible CUI promoting condition (see susceptibility categories) has been established and quantified : Yes - The operating temperature is monitored and constantly +1 0 -1 in identified rouge and coating condition is know / established : Interm - The operating temperature is not established or the coating condition is not know : No score Example - 24 -
  • 25. Strategy Matrix for Carbon Steel Strategy 3 Example - 25 -
  • 26. Strategy Matrix for Stainless Steel - 26 -
  • 30. Strategy flowchart Strategy 3 Yes No Piping > 8 in 100 % NDE and delegging of all Delegging of susceptible area within 6 years susceptible within 6 years Yes No Significant CUI found Every Delag 100% Delag more selective area 6 years within 1 year Within 1 year Every 6 years Significant CUI found No Repair and Paint Yes 100 % delegging , repair and paint Adjust confidence within 1 year with +1
  • 31. Risk Evaluation and Identification
  • 32. CUI Criticality ranking Medium High Medium Noinspection
  • 33. Strategy Matrix Strategy Strategy No inspection
  • 42. Strategy flowchart Strategy 3 Yes No Piping > 8 in 100 % NDE and delegging of all Delegging of susceptible area within 6 years susceptible within 6 years Yes No Significant CUI found Every Delag 100% Delag more selective area 6 years within 1 year Within 1 year Every 6 years Significant CUI found No Repair and Paint Yes 100 % delegging , repair and paint Adjust confidence within 1 year with +1
  • 44. Risk management Corrosion Think of module Friendship
  • 46.
  • 47.
  • 48.
  • 49. N/A = not available Internal Use Only – Do not distribute