INVENTORY MANAGEMENT
1
By
Vimal Raj K
DEFINITION
INVENTORY is the stock of any item
or resource used in an organization.
It may consists of Raw materials,
Spare parts/consumable, and Finished
Goods.
2
INVENTORY TYPES
 Movement Inventories
 Buffer Inventories
 Anticipation Inventories
 Decoupling Inventories
 Cycle Inventories
3
MOVEMENT INVENTORY
 Inventory is moved from one location to
another.
 Transportation time is involved in
transferring substantial amount of
resources.
 Example : Coal is transported from the
coal fields to an industrial town by trains.
 It is also called as transit or pipeline
inventories
4
COAL TRANSPORTATION
5
BUFFER INVENTORY
 Protect against the uncertainties of
demand and supply.
 Actual demand may not exactly
match the average and could well
exceed it.
 Also known as Safety stock.
 Idea of keeping buffer stock is to
render high level of customer service
and consequently reduce number of
stockouts and back-orders.
6
ANTICIPATION INVENTORY
 Anticipation inventories are held for
reason that a future demand for the
product is anticipated.
 Underlying idea is to smoothen the
production process for a longer
duration on a continuous scale
rather than operating with excessive
over time in one period.
7
DECOUPLING INVENTORY
 Idea of the decoupling inventories is to decouple,
different parts of the production system.
 Inventory shared by two operations to prevent
breakdown or unevenness for machines.
 Provides a cushioning effect in the face of varying
work-rates, and machine breakdowns and failures.
8
CYCLE INVENTORY
 Purchase are usually made in lots rather than for
the exact amounts which may me needed at a point
of time.
 If all purchase are made exactly, then there is no
use of cycle inventory.
9
INVENTORY COST
 Purchase cost
 Ordering cost / Setup cost
 Carrying cost
 Stockout cost
10
PURCHASE COST
 Purchase price – items that are
bought from outside sources.
 Production cost – items that are
produced with in the organisation.
 This cost may be constant per unit, or
it may vary as the quantity
purchased/produced increases or
decreases.
 Also known as nominal cost of
inventory.
11
ORDERING COST / SETUP-COST
 Ordering cost is incurred whenever the
inventory is replenished.
 It includes cost associated with the
processing (setup cost) and chasing of
the purchase order, transportation,
inspection for quality, expediting overdue
orders, and so on.
 Also known as procurement cost.
12
CARRYING COST
 Cost associated with storing an item in
inventory.
 Carrying cost includes – cost of capital
invested in the stock, costs directly
associated with storing goods,
deterioration costs, general insurance,
etc.
 Also known as holding cost or storage
cost.
13
STOCKOUT COST
 Stockout imply shortages.
 If stock out is internal, it
would imply that some
production is lost.
 If stock out is external, it
would result in a loss of
potential sales and loss of
customer goodwill.
14
ECONOMIC ORDERING QUANTITY
The Economic Order Quantity
(EOQ) is the number of units that a
company should add to inventory
with each order to minimize the
total costs of inventory—such as
holding costs, order costs, and
shortage costs.
15
CONT…
16
EOQ MODEL
17
TYPES OF MODEL IN EOQ
 Purchase model without shortage
 Manufacture model without shortage
 Purchase model with shortage
 Manufacture model with shortage
18
PURCHASE MODEL WITHOUT SHORTAGE
19
ASSUMPTIONS
 Demand is known and uniform
 Purchasing at equal interval
 Zero lead time
 No shortages
 Instantaneous replenishment.
20
MANUFACTURING MODEL WITHOUT SHORTAGE
21
ASSUMPTIONS
 Demand is at a constant rate (D).
 All cost coefficients (C1, C2, C3) are constants.
 There is no shortage cost.
 The replacement rate is finite and greater than the
demand rate. This is also called replenishment rate
or manufacturing rate, denoted by R.
22
PURCHASE MODEL WITH SHORTAGE
23
MANUFACTURING MODEL WITH SHORTAGE
24
SELECTIVE APPROACHES
 ABC analysis
 VED analysis
 HML analysis
 SDE analysis
 S-OS analysis
 FSN analysis
 XYZ analysis
25
ABCANALYSIS
 The inventory items in an organization are
classified on the basis of their usage in monetary
terms.
 A – high consumption value items.
 B – moderate consumption value items.
 C – low consumption value items.
 By plotting the usage value of the items to obtain
the ABC distribution curve.
26
ABC DISTRIBUTION CURVE
27
VEDANALYSIS
 The items are classified on the basis of their
criticality to the production process.
 V – vital items with out which production process
would come to a standstill.
 E – essential item whose stock out would
adversely affect the efficiency of the production
system.
 D – desirable item which are required but do not
immediately cause a loss of production.
28
HML ANALYSIS
 The items are classified on the basis of the unit
cost.
 H – high rate.
 M – medium rate.
 L – low rate.
29
SDE ANALYSIS
 The items are classified based on the availability.
 S – scarce items which are in short supply.
 D – difficult items means that might be available in
the indigenous market but cannot be procured
easily.
 E – easily available items which are from local
markets.
30
S-OS ANALYSIS
 Analysis is based on the nature of supplies.
 S – seasonal items.
 OS – off seasonal items.
31
FSN ANALYSIS
 Based on the consumption pattern the items are
classified in this analysis.
 F – fast moving items.
 S – slow moving items.
 N – non moving items.
 This classification helps in the arrangement of
stocks in the stores.
32
XYZ ANALYSIS
 In this analysis the classification is based on the
closing inventory value of different items.
 X – item with high investment.
 Z – item with low investment.
 Y – item with moderate investment.
33
34

More Related Content

What's hot

Inventory Control & Management
Inventory Control & ManagementInventory Control & Management
Inventory Control & ManagementMahmudul Hasan
 
Inventory management
Inventory managementInventory management
Inventory managementRajThakuri
 
Inventory Control Final Ppt
Inventory Control Final PptInventory Control Final Ppt
Inventory Control Final Pptrajnikant
 
Inventory management
 Inventory management Inventory management
Inventory managementN M
 
Cost associated with inventory
Cost associated with inventoryCost associated with inventory
Cost associated with inventoryDrAnurag Saxena
 
Inventory Management
Inventory ManagementInventory Management
Inventory Managementanoos
 
Seminar on inventory management by kailash vilegave
Seminar on inventory management by kailash vilegaveSeminar on inventory management by kailash vilegave
Seminar on inventory management by kailash vilegaveKailash Vilegave
 
Inventory management
Inventory managementInventory management
Inventory managementkahogan62
 
Inventory management
Inventory managementInventory management
Inventory managementHpm India
 
Inventory and warehouse management
Inventory and warehouse managementInventory and warehouse management
Inventory and warehouse managementMuhammad Amir Sohail
 
inventory control & ABC analysis ppt
inventory control & ABC analysis pptinventory control & ABC analysis ppt
inventory control & ABC analysis ppthyderali123
 
Inventory and inventory management
Inventory and inventory managementInventory and inventory management
Inventory and inventory managementMohammed Jasir PV
 
Inventory control
Inventory controlInventory control
Inventory controllekshmibaba
 
selective inventory control
 selective inventory control selective inventory control
selective inventory controlHimani Chowhan
 
Inventory management and control
Inventory management and controlInventory management and control
Inventory management and controlGurpreet Kaur
 
Inventory Management Presentation
Inventory Management  Presentation Inventory Management  Presentation
Inventory Management Presentation KattareeyaPrompreing
 

What's hot (20)

Inventory Management
Inventory Management Inventory Management
Inventory Management
 
Inventory Control & Management
Inventory Control & ManagementInventory Control & Management
Inventory Control & Management
 
Inventory management
Inventory managementInventory management
Inventory management
 
Inventory
InventoryInventory
Inventory
 
Inventory Control Final Ppt
Inventory Control Final PptInventory Control Final Ppt
Inventory Control Final Ppt
 
Inventory management
 Inventory management Inventory management
Inventory management
 
Cost associated with inventory
Cost associated with inventoryCost associated with inventory
Cost associated with inventory
 
Inventory Management
Inventory ManagementInventory Management
Inventory Management
 
Seminar on inventory management by kailash vilegave
Seminar on inventory management by kailash vilegaveSeminar on inventory management by kailash vilegave
Seminar on inventory management by kailash vilegave
 
Inventory management
Inventory managementInventory management
Inventory management
 
Inventory management
Inventory managementInventory management
Inventory management
 
Inventory management
Inventory managementInventory management
Inventory management
 
Inventory and warehouse management
Inventory and warehouse managementInventory and warehouse management
Inventory and warehouse management
 
Inventory Management
Inventory ManagementInventory Management
Inventory Management
 
inventory control & ABC analysis ppt
inventory control & ABC analysis pptinventory control & ABC analysis ppt
inventory control & ABC analysis ppt
 
Inventory and inventory management
Inventory and inventory managementInventory and inventory management
Inventory and inventory management
 
Inventory control
Inventory controlInventory control
Inventory control
 
selective inventory control
 selective inventory control selective inventory control
selective inventory control
 
Inventory management and control
Inventory management and controlInventory management and control
Inventory management and control
 
Inventory Management Presentation
Inventory Management  Presentation Inventory Management  Presentation
Inventory Management Presentation
 

Similar to Inventory management

Inventory Management Project
Inventory Management ProjectInventory Management Project
Inventory Management ProjectMOHD ARISH
 
NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5
NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5
NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5Jacqueline Quek
 
Inventory Management and Control, Production Planning and Control
Inventory Management and Control, Production Planning and ControlInventory Management and Control, Production Planning and Control
Inventory Management and Control, Production Planning and ControlSimranDhiman12
 
Basic terminologies and EOQ models of Inventory Theory
Basic terminologies and EOQ models of Inventory TheoryBasic terminologies and EOQ models of Inventory Theory
Basic terminologies and EOQ models of Inventory TheoryShashank Naruka
 
inventory-management.pptx
inventory-management.pptxinventory-management.pptx
inventory-management.pptxNittamallik216
 
inventory-management.pptx
inventory-management.pptxinventory-management.pptx
inventory-management.pptxranjit907044
 
Inventory Management
Inventory Management Inventory Management
Inventory Management sean186595
 
Material Control- techniques
Material Control- techniquesMaterial Control- techniques
Material Control- techniquesmonikakansal
 
Inventory Management
Inventory ManagementInventory Management
Inventory ManagementMOHD ARISH
 
Independent demand inventory
Independent demand inventoryIndependent demand inventory
Independent demand inventoryMaya Shasha
 
Inventory Management
Inventory ManagementInventory Management
Inventory ManagementImran Nawaz
 
Module 2 Inventory Mangement.pptx
Module 2 Inventory Mangement.pptxModule 2 Inventory Mangement.pptx
Module 2 Inventory Mangement.pptxNachiketHanmantgad
 
8 later inventorycontrolfinalppt 091029152005-phpapp01
8 later inventorycontrolfinalppt 091029152005-phpapp018 later inventorycontrolfinalppt 091029152005-phpapp01
8 later inventorycontrolfinalppt 091029152005-phpapp01shahidch44
 
Inventory Policy Decisions Chap 9 part 1
Inventory Policy Decisions Chap 9 part 1Inventory Policy Decisions Chap 9 part 1
Inventory Policy Decisions Chap 9 part 1Abnormal8
 
Material Management
Material ManagementMaterial Management
Material ManagementNishit Mehta
 
Management of stock
Management of stockManagement of stock
Management of stockVikram Singh
 
Inventory Management. Dr. Arindam Maiti.pptx
Inventory Management. Dr. Arindam Maiti.pptxInventory Management. Dr. Arindam Maiti.pptx
Inventory Management. Dr. Arindam Maiti.pptxarindammaiti9
 

Similar to Inventory management (20)

Inventory Management Project
Inventory Management ProjectInventory Management Project
Inventory Management Project
 
NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5
NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5
NMIT-SUPPLY-CHAIN-MANAGEMENT-Lesson5
 
Inventory Management and Control, Production Planning and Control
Inventory Management and Control, Production Planning and ControlInventory Management and Control, Production Planning and Control
Inventory Management and Control, Production Planning and Control
 
Basic terminologies and EOQ models of Inventory Theory
Basic terminologies and EOQ models of Inventory TheoryBasic terminologies and EOQ models of Inventory Theory
Basic terminologies and EOQ models of Inventory Theory
 
inventory-management.pptx
inventory-management.pptxinventory-management.pptx
inventory-management.pptx
 
inventory-management.pptx
inventory-management.pptxinventory-management.pptx
inventory-management.pptx
 
Inventory Management
Inventory Management Inventory Management
Inventory Management
 
INVENTORY MANAGEMENT
INVENTORY MANAGEMENTINVENTORY MANAGEMENT
INVENTORY MANAGEMENT
 
Material Control- techniques
Material Control- techniquesMaterial Control- techniques
Material Control- techniques
 
Inventory management
Inventory managementInventory management
Inventory management
 
Inventory Management
Inventory ManagementInventory Management
Inventory Management
 
Inventory Management
Inventory ManagementInventory Management
Inventory Management
 
Independent demand inventory
Independent demand inventoryIndependent demand inventory
Independent demand inventory
 
Inventory Management
Inventory ManagementInventory Management
Inventory Management
 
Module 2 Inventory Mangement.pptx
Module 2 Inventory Mangement.pptxModule 2 Inventory Mangement.pptx
Module 2 Inventory Mangement.pptx
 
8 later inventorycontrolfinalppt 091029152005-phpapp01
8 later inventorycontrolfinalppt 091029152005-phpapp018 later inventorycontrolfinalppt 091029152005-phpapp01
8 later inventorycontrolfinalppt 091029152005-phpapp01
 
Inventory Policy Decisions Chap 9 part 1
Inventory Policy Decisions Chap 9 part 1Inventory Policy Decisions Chap 9 part 1
Inventory Policy Decisions Chap 9 part 1
 
Material Management
Material ManagementMaterial Management
Material Management
 
Management of stock
Management of stockManagement of stock
Management of stock
 
Inventory Management. Dr. Arindam Maiti.pptx
Inventory Management. Dr. Arindam Maiti.pptxInventory Management. Dr. Arindam Maiti.pptx
Inventory Management. Dr. Arindam Maiti.pptx
 

Recently uploaded

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 

Recently uploaded (20)

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 

Inventory management

  • 2. DEFINITION INVENTORY is the stock of any item or resource used in an organization. It may consists of Raw materials, Spare parts/consumable, and Finished Goods. 2
  • 3. INVENTORY TYPES  Movement Inventories  Buffer Inventories  Anticipation Inventories  Decoupling Inventories  Cycle Inventories 3
  • 4. MOVEMENT INVENTORY  Inventory is moved from one location to another.  Transportation time is involved in transferring substantial amount of resources.  Example : Coal is transported from the coal fields to an industrial town by trains.  It is also called as transit or pipeline inventories 4
  • 6. BUFFER INVENTORY  Protect against the uncertainties of demand and supply.  Actual demand may not exactly match the average and could well exceed it.  Also known as Safety stock.  Idea of keeping buffer stock is to render high level of customer service and consequently reduce number of stockouts and back-orders. 6
  • 7. ANTICIPATION INVENTORY  Anticipation inventories are held for reason that a future demand for the product is anticipated.  Underlying idea is to smoothen the production process for a longer duration on a continuous scale rather than operating with excessive over time in one period. 7
  • 8. DECOUPLING INVENTORY  Idea of the decoupling inventories is to decouple, different parts of the production system.  Inventory shared by two operations to prevent breakdown or unevenness for machines.  Provides a cushioning effect in the face of varying work-rates, and machine breakdowns and failures. 8
  • 9. CYCLE INVENTORY  Purchase are usually made in lots rather than for the exact amounts which may me needed at a point of time.  If all purchase are made exactly, then there is no use of cycle inventory. 9
  • 10. INVENTORY COST  Purchase cost  Ordering cost / Setup cost  Carrying cost  Stockout cost 10
  • 11. PURCHASE COST  Purchase price – items that are bought from outside sources.  Production cost – items that are produced with in the organisation.  This cost may be constant per unit, or it may vary as the quantity purchased/produced increases or decreases.  Also known as nominal cost of inventory. 11
  • 12. ORDERING COST / SETUP-COST  Ordering cost is incurred whenever the inventory is replenished.  It includes cost associated with the processing (setup cost) and chasing of the purchase order, transportation, inspection for quality, expediting overdue orders, and so on.  Also known as procurement cost. 12
  • 13. CARRYING COST  Cost associated with storing an item in inventory.  Carrying cost includes – cost of capital invested in the stock, costs directly associated with storing goods, deterioration costs, general insurance, etc.  Also known as holding cost or storage cost. 13
  • 14. STOCKOUT COST  Stockout imply shortages.  If stock out is internal, it would imply that some production is lost.  If stock out is external, it would result in a loss of potential sales and loss of customer goodwill. 14
  • 15. ECONOMIC ORDERING QUANTITY The Economic Order Quantity (EOQ) is the number of units that a company should add to inventory with each order to minimize the total costs of inventory—such as holding costs, order costs, and shortage costs. 15
  • 18. TYPES OF MODEL IN EOQ  Purchase model without shortage  Manufacture model without shortage  Purchase model with shortage  Manufacture model with shortage 18
  • 19. PURCHASE MODEL WITHOUT SHORTAGE 19
  • 20. ASSUMPTIONS  Demand is known and uniform  Purchasing at equal interval  Zero lead time  No shortages  Instantaneous replenishment. 20
  • 22. ASSUMPTIONS  Demand is at a constant rate (D).  All cost coefficients (C1, C2, C3) are constants.  There is no shortage cost.  The replacement rate is finite and greater than the demand rate. This is also called replenishment rate or manufacturing rate, denoted by R. 22
  • 23. PURCHASE MODEL WITH SHORTAGE 23
  • 25. SELECTIVE APPROACHES  ABC analysis  VED analysis  HML analysis  SDE analysis  S-OS analysis  FSN analysis  XYZ analysis 25
  • 26. ABCANALYSIS  The inventory items in an organization are classified on the basis of their usage in monetary terms.  A – high consumption value items.  B – moderate consumption value items.  C – low consumption value items.  By plotting the usage value of the items to obtain the ABC distribution curve. 26
  • 28. VEDANALYSIS  The items are classified on the basis of their criticality to the production process.  V – vital items with out which production process would come to a standstill.  E – essential item whose stock out would adversely affect the efficiency of the production system.  D – desirable item which are required but do not immediately cause a loss of production. 28
  • 29. HML ANALYSIS  The items are classified on the basis of the unit cost.  H – high rate.  M – medium rate.  L – low rate. 29
  • 30. SDE ANALYSIS  The items are classified based on the availability.  S – scarce items which are in short supply.  D – difficult items means that might be available in the indigenous market but cannot be procured easily.  E – easily available items which are from local markets. 30
  • 31. S-OS ANALYSIS  Analysis is based on the nature of supplies.  S – seasonal items.  OS – off seasonal items. 31
  • 32. FSN ANALYSIS  Based on the consumption pattern the items are classified in this analysis.  F – fast moving items.  S – slow moving items.  N – non moving items.  This classification helps in the arrangement of stocks in the stores. 32
  • 33. XYZ ANALYSIS  In this analysis the classification is based on the closing inventory value of different items.  X – item with high investment.  Z – item with low investment.  Y – item with moderate investment. 33
  • 34. 34