Amy Chen, Director of MWD Program
Imported Water Committee
January 23, 2014
 Public draft of BDCP and
EIR/EIS released December
13, 2013
◦ 120 day formal review period
◦ Public meeting scheduled for
February 6, 2014 in San Diego at
the Convention Center from
3:00pm – 7:00pm
 Staff continues its evaluation
of the public draft
2
BDCP Component
Type of Cost1
Capital O&M Total
Water Facilities & Operation (CM1)
$14,571 $1,456 $16,027
Natural Community Restoration (CM2-CM11) $4,170 $237 $4,406
Other stressors (CM12-CM22) $927 $1,735 $2,661
Changed circumstances $184 - $184
Local government revenue replacement - $226 $226
Monitoring & research measures - $913 $913
Plan admin. - $336 $336
Total2
$19,851 $4,902 $24,754
1 in Millions of 2012 dollars
2 Total may not add due to rounding
Source: Bay Delta Conservation Plan, Tables 8-33 and 8-34
3
 BDCP envisions costs will be shared between water
export contractors and the state and federal
governments
4
State &
Federal
Contractors
69%
State
funding
17%
Federal
funding
14%
o Exporters:
Conveyance facilities
and related mitigation
costs
o State/Federal:
Ecosystem restoration
costs
Funding Source
Water
Facilities &
Operations
Nat.Com.
Protect. &
Mgt.
Nat. Com.
Restoration
Other
Stressors
Monitoring
Research
Etc.
Program
Admin.
Total
Contractors $16,027 $266 $269 $224 $113 $31 $16,930
USBR $0 $50 $602 $1,077 $640 $100 $2,469
Other Fed Funds $0 $346 $460 $10 $200 $60 $1,076
Props 1E & 84 $0 $0 $142 $21 $0 $0 $163
2014 Water Bond $0 $184 $900 $430 $0 $0 $1,514
Future Water Bond $0 $205 $1,200 $840 $0 $0 $2,245
Other State Funds $0 $10 $40 $0 $145 $0 $195
Interest Income $0 $0 $0 $20 $0 $145 $165
Total Funding $16,027 $1,061 $3,613 $2,623 $1,098 $336 $24,758
Total Cost $16,027 $1,061 $3,610 $2,623 $1,097 $336 $24,754
Difference $0 $0 $3 $0 $1 $0 $4
1 In millions of 2012 dollars
Source: Bay Delta Conservation Plan, Public Draft, Chapter 8, December 2013, Table 8-37.
5
 State and federal regulations require assurance of
funding to issue permits under the habitat
conservation plan
 Federal ESA requires that HCPs specify “the applicant
will ensure that adequate funding for the plan will be
provided” for conservation actions – courts have
interpreted broadly
 ESA case law strongly supports the notion that
funding must be assured and an HCP “cannot rely on
speculative future actions of others”
6
 Cost allocation negotiations between and among
state and federal water export contractors are
ongoing
◦ Water Authority requested, but is not involved in cost
allocation negotiations
 BDCP indicates that the actual funding share
between state and federal contractors will not be
determined until “near the time that permits are
issued for BDCP”
 Lack of cost allocation certainty hinders the
ability to assess cost impacts and risks
7
 Because cost allocation has not been finalized, staff
analysis uses a bookend approach to potential cost
allocation scenarios
 Scenarios
1. Contractors pay for only conveyance/mitigation costs of $16.9
billion, with costs shared 55/45 between SWP and CVP
2. All $24.8 billion of BDCP costs paid by contractors, with costs
shared 55/45 between SWP and CVP
3. Contractors pay for only conveyance mitigation costs of $16.9
billion, with urban agencies from SWP and CVP paying 90
percent of costs and agricultural agencies paying 10 percent
- MWD share assumed to be 58 percent of urban share
8
Scenario 1 Scenario 2 Scenario 3
Description
Contractors pay for
conveyance
Cost share between
SWP & CVP:
55/45
Contractors pay for
all costs
Cost share between
SWP & CVP:
55/45
Contractors pay for
conveyance;
Urban and
agricultural split:
90/10
Total Cost
(Capital and O&M)
$16,930M $24,754M $16,930M
SWP
(or urban in
scenario 3)
$9,312M $13,617M $15,237M
MWD $4,218M $6,168M $8,832M
Water Authority $1,055M $1,542M $2,208M
9
10
Scenario 1 Scenario 2 Scenario 3
Description
Contractors pay for
conveyance
Cost share between
SWP & CVP
55/45
Contractors pay for all
costs
Cost share between
SWP & CVP
55/45
Contractors pay for
conveyance;
Urban and agricultural
split: 90/10
Annualized Debt
Service
$1,111M $1,563M $1,111M
SWP share (or urban) $611M $859M $1,000M
Annualized Debt
Service to MWD
$277M $389M $579M
BDCP Op Scn. High
Outflow
Low
Outflow
High
Outflow
Low
Outflow
High
Outflow
Low
Outflow
Potential Benefit
(TAF)
299 424 299 424 299 424
Incremental Unit
cost ($/AF)
$926 $653 $1,302 $919 $1,938 $1,368
*Analysis varied the cost obligations only, assumes MWD’s share of the BDCP benefits remains constant –
i.e., 45.3 percent (Table A) of 55 percent (SWP share).
 Funding
◦ Federal and state share – dependent on future bond
passage and/or appropriation
◦ Exporters share
 Allocation not yet finalized
 BDCP “Big Gulp”
◦ Contractors’ ability and willingness to capture and
store wet year supply for dry year use critical
◦ Storage fill plan and financing strategy needed at
MWD
11
Meeting Imported Water Committee/Board Activity
7/25/2013 Provide input on scope of proposed Water Authority analysis of
BDCP alternatives; provide input on policy questions to be addressed
√
8/8/2013
Special
Meeting
Overview of Bay-Delta and proposals for Delta fix, including
description of alternatives
√
8/22/2013 Review of technical analysis – demand assumptions; alternative
project yield assumptions; projected costs
√
9/12/2013
Special
Meeting
BDCP economic study on cost-benefit of BDCP preferred alternative √
9/26/2013 Review of technical analysis (cont.), including yield review √
10/24/2013 Information: Review of technical analysis (cont.), including baselines;
BDCP timeline and processes impacting implementation
√
11/14/2013
Special
Meeting
Supply and demand evaluation and analysis √
Meeting Imported Water Committee/Board Activity
1/9/2014
Special Meeting
Identification of BDCP Physical features and facilities;
supply/demand risk assessment
√
1/23/2014 Preliminary cost estimates and risk assessment to Water
Authority
√
2/13/2014
Special Meeting
Engineering assessment of BDCP cost estimates; BDCP
Governance
2/27/2014 Economic and risk assessment (cont.)
3/13/2014
Special Meeting
Summary presentation of BDCP issues; Identification of issues to
be addressed in the EIR/EIS comment letter
3/27/2014 Action: Consider action on final EIR/EIS comment letter
4/24/2014 Revise BDCP schedule; discuss outstanding policy issues; timeline
for future board meetings
14
 BDCP Update
 Overview of BDCP Economic Assessment
Issues
◦ Cost Estimates
◦ Funding Sources
◦ Cost Allocation
 Preliminary assessment of potential
financial impacts
 Summary
 Next Steps
15
16
$-
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
$7,000
$8,000
$9,000
$10,000
1-5 6-10 11-15 16-20 21-25 26-30 31-35 36-40 41-45 46-50
Program Costs (Administration,
Monitoring, Research, Other)
Other Stressors Conservation
Measures (CM13 to CM 21)
Habitat Protection and
Restoration Conservation
Measures (CM2 to CM12)
Water Facility Conveyance
(CM1, CM22)
CapitalCosts
(MillionsofUndiscounted2012Dollars)
Plan Years
Estimated Capital Costs in 5-Year Increments
Source: BDCP Executive Summary, Page 28
17
$-
$100
$200
$300
$400
$500
$600
1-5 6-10 11-15 16-20 21-25 26-30 31-35 36-40 41-45 46-50
Habitat Protection and
Restoration
Conservation Measures
(CM2 to CM12)
Other Stressors
Conservation Measures
(CM13 to CM 21)
Water Facility
Conveyance (CM1,
CM22)
Program Costs
(Administration,
Monitoring, Research,
Other)
CapitalCosts
(MillionsofUndiscounted2012Dollars)
Plan Years
Estimated Operational Costs in 5-Year Increments
Source: BDCP Executive Summary, Page 28
 Unclear whether reliance on federal funding and
future state bonds will meet the “adequate funding”
test for permit issuance
 BDCP public draft indicates that if a shortfall in
state or federal funding occurs
◦ Authorized entities will not be required to provide land,
water, or monetary resources beyond their commitment
in the Plan
18
 BDCP public draft indicates the SWP share of new
water conveyance system costs could be paid similar
to how existing SWP is being paid for
◦ DWR-issued revenue bonds
◦ Take-or-pay contracts for participating SWP contractors
◦ SWP contracts will need to be amended to allow costs to be
financed beyond current term of 2035
 Individual contractors may issue their own revenue
bonds or collectively through a JPA
◦ BDCP public draft identifies State and Federal Water Contractors
Water Agency as possible JPA to finance project
 JPA formed in 2009 – majority of SWP/CVP contractors are
members
19
 Incremental unit costs for MWD depend on
benefit it receives from BDCP yield
◦ Consumptive need for water
◦ Ability to place water in storage when available
 High outflow scenario = 1.2 MAF average annual
benefit compared with no action
 Low outflow scenario = 1.7 MAF average annual
benefit compared with no action
 Range of potential average annual benefit to
MWD = 299,000 acre-feet to 424,000 acre-feet
20
 Aggregate annual debt service and operations costs for the
conveyance facility only
◦ Average annual capital debt service costs are approx $1.1 billion from
2021 through 2055
21
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
2012 2014 2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 2052 2054 2056 2058 2060 2062 2064
$inMillions
Figure 4
Aggregate Debt & Operations
(Conveyance only)
Debt serv O&M
 Aggregate annual debt service and operations costs for
conveyance plus habitat restoration
◦ Average annual capital debt service costs are approx $1.6 billion from
2021 through 2055
22
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
$1,600
$1,800
$2,000
2012 2014 2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 2052 2054 2056 2058 2060 2062 2064
$inMillions
Figure 5
Aggregate Debt & Operations
(Conveyance and Habitat)
Debt Serv (CM1) Debt Serv (Habitat) O&M (CM1) O&M (Habitat)

More Related Content

What's hot

Fy2015 council budget_meeting_presentation_05212014 final
Fy2015 council budget_meeting_presentation_05212014 finalFy2015 council budget_meeting_presentation_05212014 final
Fy2015 council budget_meeting_presentation_05212014 final
Susie Cambria
 
American Recovery and Reinvestment Conference Report DivisionA
American Recovery and Reinvestment Conference Report DivisionA American Recovery and Reinvestment Conference Report DivisionA
American Recovery and Reinvestment Conference Report DivisionA
finance3
 
Briefing to Dublin City Council on Irish Water
Briefing to Dublin City Council on Irish WaterBriefing to Dublin City Council on Irish Water
Briefing to Dublin City Council on Irish Water
Naoise
 
Acc 410 wk 7 quiz 5 ch. 8 & 9
Acc 410 wk 7 quiz 5 ch. 8 & 9Acc 410 wk 7 quiz 5 ch. 8 & 9
Acc 410 wk 7 quiz 5 ch. 8 & 9
fascinating_heart
 

What's hot (20)

Sp5 fy2014 1st qtr financial report presentation v2 5.19.14
Sp5 fy2014   1st qtr financial report presentation v2 5.19.14Sp5 fy2014   1st qtr financial report presentation v2 5.19.14
Sp5 fy2014 1st qtr financial report presentation v2 5.19.14
 
Fy2015 council budget_meeting_presentation_05212014 final
Fy2015 council budget_meeting_presentation_05212014 finalFy2015 council budget_meeting_presentation_05212014 final
Fy2015 council budget_meeting_presentation_05212014 final
 
American Recovery and Reinvestment Conference Report DivisionA
American Recovery and Reinvestment Conference Report DivisionA American Recovery and Reinvestment Conference Report DivisionA
American Recovery and Reinvestment Conference Report DivisionA
 
NDMA ROAD AHEAD
NDMA ROAD AHEADNDMA ROAD AHEAD
NDMA ROAD AHEAD
 
Briefing to Dublin City Council on Irish Water
Briefing to Dublin City Council on Irish WaterBriefing to Dublin City Council on Irish Water
Briefing to Dublin City Council on Irish Water
 
Approval of Uniform Contract for Member Agency Purchase of Treated Water from...
Approval of Uniform Contract for Member Agency Purchase of Treated Water from...Approval of Uniform Contract for Member Agency Purchase of Treated Water from...
Approval of Uniform Contract for Member Agency Purchase of Treated Water from...
 
Fy12 year end financial report - presentation - v2 3.11.13
Fy12 year end financial report - presentation - v2 3.11.13Fy12 year end financial report - presentation - v2 3.11.13
Fy12 year end financial report - presentation - v2 3.11.13
 
Piven hsc presentation final 3.18.13
Piven hsc presentation   final 3.18.13Piven hsc presentation   final 3.18.13
Piven hsc presentation final 3.18.13
 
TWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” RuleTWCA Webinar - New “Waters of the United States” Rule
TWCA Webinar - New “Waters of the United States” Rule
 
Acc 410 wk 7 quiz 5 ch. 8 & 9
Acc 410 wk 7 quiz 5 ch. 8 & 9Acc 410 wk 7 quiz 5 ch. 8 & 9
Acc 410 wk 7 quiz 5 ch. 8 & 9
 
Texas Water Development Board Update
Texas Water Development Board UpdateTexas Water Development Board Update
Texas Water Development Board Update
 
Integrated municipal stormwater and wastewater planning approach framework
Integrated municipal stormwater and wastewater planning approach frameworkIntegrated municipal stormwater and wastewater planning approach framework
Integrated municipal stormwater and wastewater planning approach framework
 
2011 Preliminary Budget & Levy Presentation
2011 Preliminary Budget & Levy Presentation2011 Preliminary Budget & Levy Presentation
2011 Preliminary Budget & Levy Presentation
 
Additional revenue for Road Repair : 04 27-2021 agenda packet
Additional revenue for Road Repair : 04 27-2021 agenda packetAdditional revenue for Road Repair : 04 27-2021 agenda packet
Additional revenue for Road Repair : 04 27-2021 agenda packet
 
French, DFC Update
French, DFC UpdateFrench, DFC Update
French, DFC Update
 
Public Funding Current Trends & Successful Strategies
Public Funding Current Trends & Successful StrategiesPublic Funding Current Trends & Successful Strategies
Public Funding Current Trends & Successful Strategies
 
Bay-Delta Activities Update - Aug. 25, 2011
Bay-Delta Activities Update - Aug. 25, 2011Bay-Delta Activities Update - Aug. 25, 2011
Bay-Delta Activities Update - Aug. 25, 2011
 
FY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial ReviewFY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial Review
 
Sp4 2013 budget amendment 05.20.13
Sp4 2013 budget amendment 05.20.13Sp4 2013 budget amendment 05.20.13
Sp4 2013 budget amendment 05.20.13
 
Pinellas County Tourist Development Tax Joint TDC/BCC Meeting 6-20-19
Pinellas County Tourist Development Tax Joint TDC/BCC Meeting 6-20-19Pinellas County Tourist Development Tax Joint TDC/BCC Meeting 6-20-19
Pinellas County Tourist Development Tax Joint TDC/BCC Meeting 6-20-19
 

Similar to Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Parameters - Jan. 23, 2014

Is the Bay Delta Conservation Plan a Doable Deal? - Rodney T. Smith - Sept. 1...
Is the Bay Delta Conservation Plan a Doable Deal? - Rodney T. Smith - Sept. 1...Is the Bay Delta Conservation Plan a Doable Deal? - Rodney T. Smith - Sept. 1...
Is the Bay Delta Conservation Plan a Doable Deal? - Rodney T. Smith - Sept. 1...
San Diego County Water Authority
 
Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013
Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013
Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013
San Diego County Water Authority
 
ET April 2023 Investor Presentation_Final.pdf
ET April 2023 Investor Presentation_Final.pdfET April 2023 Investor Presentation_Final.pdf
ET April 2023 Investor Presentation_Final.pdf
ssuser6f254f1
 
Economic Analyses Conducted on the Bay Delta Conservation Plan - David Sung, ...
Economic Analyses Conducted on the Bay Delta Conservation Plan - David Sung, ...Economic Analyses Conducted on the Bay Delta Conservation Plan - David Sung, ...
Economic Analyses Conducted on the Bay Delta Conservation Plan - David Sung, ...
San Diego County Water Authority
 

Similar to Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Parameters - Jan. 23, 2014 (20)

State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...
 
Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...
Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...
Bay-Delta Conservation Plan: Economic and Financial Risk Assessment to the Wa...
 
Is the Bay Delta Conservation Plan a Doable Deal? - Rodney T. Smith - Sept. 1...
Is the Bay Delta Conservation Plan a Doable Deal? - Rodney T. Smith - Sept. 1...Is the Bay Delta Conservation Plan a Doable Deal? - Rodney T. Smith - Sept. 1...
Is the Bay Delta Conservation Plan a Doable Deal? - Rodney T. Smith - Sept. 1...
 
State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...State Treasurer's Assessment of the Affordability and Financing Consideration...
State Treasurer's Assessment of the Affordability and Financing Consideration...
 
Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013
Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013
Bay-Delta Conservation Plan: Costs and Funding - Sept. 12, 2013
 
DCNR Department Budget Overview
DCNR Department Budget OverviewDCNR Department Budget Overview
DCNR Department Budget Overview
 
Bay-Delta Conservation Plan (BDCP) Supply and Demand Risk Assessment - Jan. 9...
Bay-Delta Conservation Plan (BDCP) Supply and Demand Risk Assessment - Jan. 9...Bay-Delta Conservation Plan (BDCP) Supply and Demand Risk Assessment - Jan. 9...
Bay-Delta Conservation Plan (BDCP) Supply and Demand Risk Assessment - Jan. 9...
 
002 ccet training_workshop_fy2016_to_t
002 ccet training_workshop_fy2016_to_t002 ccet training_workshop_fy2016_to_t
002 ccet training_workshop_fy2016_to_t
 
Company Presentation - October 2014
Company Presentation - October 2014Company Presentation - October 2014
Company Presentation - October 2014
 
Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...
Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...
Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...
 
The Stimulus Package And Energy Projects
The Stimulus Package And Energy ProjectsThe Stimulus Package And Energy Projects
The Stimulus Package And Energy Projects
 
ET April 2023 Investor Presentation_Final.pdf
ET April 2023 Investor Presentation_Final.pdfET April 2023 Investor Presentation_Final.pdf
ET April 2023 Investor Presentation_Final.pdf
 
Corporate presentation 4 q 14 sa
Corporate presentation 4 q 14 saCorporate presentation 4 q 14 sa
Corporate presentation 4 q 14 sa
 
Economic Analyses Conducted on the Bay Delta Conservation Plan - David Sung, ...
Economic Analyses Conducted on the Bay Delta Conservation Plan - David Sung, ...Economic Analyses Conducted on the Bay Delta Conservation Plan - David Sung, ...
Economic Analyses Conducted on the Bay Delta Conservation Plan - David Sung, ...
 
Wp special master-plan[071113]
Wp special master-plan[071113]Wp special master-plan[071113]
Wp special master-plan[071113]
 
Company Presentation October 2014
Company Presentation October 2014Company Presentation October 2014
Company Presentation October 2014
 
Company website presentation october 2014
Company website presentation   october 2014Company website presentation   october 2014
Company website presentation october 2014
 
The Rate Setting Process
The Rate Setting ProcessThe Rate Setting Process
The Rate Setting Process
 
Water-Wastewater Impact Fees
Water-Wastewater Impact FeesWater-Wastewater Impact Fees
Water-Wastewater Impact Fees
 
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
Bay Delta Conservation Plan/California WaterFix: Potential Cost Impact to the...
 

More from San Diego County Water Authority

More from San Diego County Water Authority (20)

Session 2 presentation
Session 2 presentationSession 2 presentation
Session 2 presentation
 
Update on Supply Conditions and Drought Response Activities - September 24, 2015
Update on Supply Conditions and Drought Response Activities - September 24, 2015Update on Supply Conditions and Drought Response Activities - September 24, 2015
Update on Supply Conditions and Drought Response Activities - September 24, 2015
 
Update on Supply Conditions and Drought Response Activities - June 25, 2015
Update on Supply Conditions and Drought Response Activities - June 25, 2015 Update on Supply Conditions and Drought Response Activities - June 25, 2015
Update on Supply Conditions and Drought Response Activities - June 25, 2015
 
Update on Supply Conditions and Drought Response Activities - October 22, 2015
Update on Supply Conditions and Drought Response Activities - October 22, 2015Update on Supply Conditions and Drought Response Activities - October 22, 2015
Update on Supply Conditions and Drought Response Activities - October 22, 2015
 
Update on Supply Conditions and Drought Response Activities - December 10, 2015
Update on Supply Conditions and Drought Response Activities - December 10, 2015Update on Supply Conditions and Drought Response Activities - December 10, 2015
Update on Supply Conditions and Drought Response Activities - December 10, 2015
 
Update on Supply Conditions and Drought Response Activities - February 25, 2016
Update on Supply Conditions and Drought Response Activities - February 25, 2016Update on Supply Conditions and Drought Response Activities - February 25, 2016
Update on Supply Conditions and Drought Response Activities - February 25, 2016
 
Update on Supply Conditions and Drought Response Activities - August 27, 2015
Update on Supply Conditions and Drought Response Activities - August 27, 2015Update on Supply Conditions and Drought Response Activities - August 27, 2015
Update on Supply Conditions and Drought Response Activities - August 27, 2015
 
Update on Supply Conditions and Drought Response Activities - July 23, 2015
Update on Supply Conditions and Drought Response Activities - July 23, 2015 Update on Supply Conditions and Drought Response Activities - July 23, 2015
Update on Supply Conditions and Drought Response Activities - July 23, 2015
 
Bay Delta Conservation Plan/California WaterFix
Bay Delta Conservation Plan/California WaterFixBay Delta Conservation Plan/California WaterFix
Bay Delta Conservation Plan/California WaterFix
 
Bay Delta Conservation Plan/California WaterFix
Bay Delta Conservation Plan/California WaterFixBay Delta Conservation Plan/California WaterFix
Bay Delta Conservation Plan/California WaterFix
 
Bay-Delta Activities Update
Bay-Delta Activities UpdateBay-Delta Activities Update
Bay-Delta Activities Update
 
2015-2016 Bay-Delta Workplan - February 26, 2015
2015-2016 Bay-Delta Workplan - February 26, 20152015-2016 Bay-Delta Workplan - February 26, 2015
2015-2016 Bay-Delta Workplan - February 26, 2015
 
Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...
Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...
Bay-Delta Conservation Plan: Supplemental Draft EIR/EIS Comment Letter - July...
 
Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014
Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014
Bay-Delta Conservation Plan: Draft EIR/EIS Comment Letter - March 27, 2014
 
Update on Supply Conditions and Drought Response Activities
Update on Supply Conditions and Drought Response ActivitiesUpdate on Supply Conditions and Drought Response Activities
Update on Supply Conditions and Drought Response Activities
 
Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...
Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...
Approval of Shortage Management Actions in Response to MWD Supply Cutbacks an...
 
Update on Supply Conditions and Drought Response Actions
Update on Supply Conditions and Drought Response ActionsUpdate on Supply Conditions and Drought Response Actions
Update on Supply Conditions and Drought Response Actions
 
Water Supply and Drought Management Update - Feb. 26, 2015
Water Supply and Drought Management Update - Feb. 26, 2015Water Supply and Drought Management Update - Feb. 26, 2015
Water Supply and Drought Management Update - Feb. 26, 2015
 
Update on Water Supply Conditions and Drought Response Activities - March 26,...
Update on Water Supply Conditions and Drought Response Activities - March 26,...Update on Water Supply Conditions and Drought Response Activities - March 26,...
Update on Water Supply Conditions and Drought Response Activities - March 26,...
 
Water Supply and Drought Management Update - Nov. 20, 2014
Water Supply and Drought Management Update - Nov. 20, 2014Water Supply and Drought Management Update - Nov. 20, 2014
Water Supply and Drought Management Update - Nov. 20, 2014
 

Recently uploaded

Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
PsychicRuben LoveSpells
 

Recently uploaded (20)

Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 

Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Parameters - Jan. 23, 2014

  • 1. Amy Chen, Director of MWD Program Imported Water Committee January 23, 2014
  • 2.  Public draft of BDCP and EIR/EIS released December 13, 2013 ◦ 120 day formal review period ◦ Public meeting scheduled for February 6, 2014 in San Diego at the Convention Center from 3:00pm – 7:00pm  Staff continues its evaluation of the public draft 2
  • 3. BDCP Component Type of Cost1 Capital O&M Total Water Facilities & Operation (CM1) $14,571 $1,456 $16,027 Natural Community Restoration (CM2-CM11) $4,170 $237 $4,406 Other stressors (CM12-CM22) $927 $1,735 $2,661 Changed circumstances $184 - $184 Local government revenue replacement - $226 $226 Monitoring & research measures - $913 $913 Plan admin. - $336 $336 Total2 $19,851 $4,902 $24,754 1 in Millions of 2012 dollars 2 Total may not add due to rounding Source: Bay Delta Conservation Plan, Tables 8-33 and 8-34 3
  • 4.  BDCP envisions costs will be shared between water export contractors and the state and federal governments 4 State & Federal Contractors 69% State funding 17% Federal funding 14% o Exporters: Conveyance facilities and related mitigation costs o State/Federal: Ecosystem restoration costs
  • 5. Funding Source Water Facilities & Operations Nat.Com. Protect. & Mgt. Nat. Com. Restoration Other Stressors Monitoring Research Etc. Program Admin. Total Contractors $16,027 $266 $269 $224 $113 $31 $16,930 USBR $0 $50 $602 $1,077 $640 $100 $2,469 Other Fed Funds $0 $346 $460 $10 $200 $60 $1,076 Props 1E & 84 $0 $0 $142 $21 $0 $0 $163 2014 Water Bond $0 $184 $900 $430 $0 $0 $1,514 Future Water Bond $0 $205 $1,200 $840 $0 $0 $2,245 Other State Funds $0 $10 $40 $0 $145 $0 $195 Interest Income $0 $0 $0 $20 $0 $145 $165 Total Funding $16,027 $1,061 $3,613 $2,623 $1,098 $336 $24,758 Total Cost $16,027 $1,061 $3,610 $2,623 $1,097 $336 $24,754 Difference $0 $0 $3 $0 $1 $0 $4 1 In millions of 2012 dollars Source: Bay Delta Conservation Plan, Public Draft, Chapter 8, December 2013, Table 8-37. 5
  • 6.  State and federal regulations require assurance of funding to issue permits under the habitat conservation plan  Federal ESA requires that HCPs specify “the applicant will ensure that adequate funding for the plan will be provided” for conservation actions – courts have interpreted broadly  ESA case law strongly supports the notion that funding must be assured and an HCP “cannot rely on speculative future actions of others” 6
  • 7.  Cost allocation negotiations between and among state and federal water export contractors are ongoing ◦ Water Authority requested, but is not involved in cost allocation negotiations  BDCP indicates that the actual funding share between state and federal contractors will not be determined until “near the time that permits are issued for BDCP”  Lack of cost allocation certainty hinders the ability to assess cost impacts and risks 7
  • 8.  Because cost allocation has not been finalized, staff analysis uses a bookend approach to potential cost allocation scenarios  Scenarios 1. Contractors pay for only conveyance/mitigation costs of $16.9 billion, with costs shared 55/45 between SWP and CVP 2. All $24.8 billion of BDCP costs paid by contractors, with costs shared 55/45 between SWP and CVP 3. Contractors pay for only conveyance mitigation costs of $16.9 billion, with urban agencies from SWP and CVP paying 90 percent of costs and agricultural agencies paying 10 percent - MWD share assumed to be 58 percent of urban share 8
  • 9. Scenario 1 Scenario 2 Scenario 3 Description Contractors pay for conveyance Cost share between SWP & CVP: 55/45 Contractors pay for all costs Cost share between SWP & CVP: 55/45 Contractors pay for conveyance; Urban and agricultural split: 90/10 Total Cost (Capital and O&M) $16,930M $24,754M $16,930M SWP (or urban in scenario 3) $9,312M $13,617M $15,237M MWD $4,218M $6,168M $8,832M Water Authority $1,055M $1,542M $2,208M 9
  • 10. 10 Scenario 1 Scenario 2 Scenario 3 Description Contractors pay for conveyance Cost share between SWP & CVP 55/45 Contractors pay for all costs Cost share between SWP & CVP 55/45 Contractors pay for conveyance; Urban and agricultural split: 90/10 Annualized Debt Service $1,111M $1,563M $1,111M SWP share (or urban) $611M $859M $1,000M Annualized Debt Service to MWD $277M $389M $579M BDCP Op Scn. High Outflow Low Outflow High Outflow Low Outflow High Outflow Low Outflow Potential Benefit (TAF) 299 424 299 424 299 424 Incremental Unit cost ($/AF) $926 $653 $1,302 $919 $1,938 $1,368 *Analysis varied the cost obligations only, assumes MWD’s share of the BDCP benefits remains constant – i.e., 45.3 percent (Table A) of 55 percent (SWP share).
  • 11.  Funding ◦ Federal and state share – dependent on future bond passage and/or appropriation ◦ Exporters share  Allocation not yet finalized  BDCP “Big Gulp” ◦ Contractors’ ability and willingness to capture and store wet year supply for dry year use critical ◦ Storage fill plan and financing strategy needed at MWD 11
  • 12. Meeting Imported Water Committee/Board Activity 7/25/2013 Provide input on scope of proposed Water Authority analysis of BDCP alternatives; provide input on policy questions to be addressed √ 8/8/2013 Special Meeting Overview of Bay-Delta and proposals for Delta fix, including description of alternatives √ 8/22/2013 Review of technical analysis – demand assumptions; alternative project yield assumptions; projected costs √ 9/12/2013 Special Meeting BDCP economic study on cost-benefit of BDCP preferred alternative √ 9/26/2013 Review of technical analysis (cont.), including yield review √ 10/24/2013 Information: Review of technical analysis (cont.), including baselines; BDCP timeline and processes impacting implementation √ 11/14/2013 Special Meeting Supply and demand evaluation and analysis √
  • 13. Meeting Imported Water Committee/Board Activity 1/9/2014 Special Meeting Identification of BDCP Physical features and facilities; supply/demand risk assessment √ 1/23/2014 Preliminary cost estimates and risk assessment to Water Authority √ 2/13/2014 Special Meeting Engineering assessment of BDCP cost estimates; BDCP Governance 2/27/2014 Economic and risk assessment (cont.) 3/13/2014 Special Meeting Summary presentation of BDCP issues; Identification of issues to be addressed in the EIR/EIS comment letter 3/27/2014 Action: Consider action on final EIR/EIS comment letter 4/24/2014 Revise BDCP schedule; discuss outstanding policy issues; timeline for future board meetings
  • 14. 14
  • 15.  BDCP Update  Overview of BDCP Economic Assessment Issues ◦ Cost Estimates ◦ Funding Sources ◦ Cost Allocation  Preliminary assessment of potential financial impacts  Summary  Next Steps 15
  • 16. 16 $- $1,000 $2,000 $3,000 $4,000 $5,000 $6,000 $7,000 $8,000 $9,000 $10,000 1-5 6-10 11-15 16-20 21-25 26-30 31-35 36-40 41-45 46-50 Program Costs (Administration, Monitoring, Research, Other) Other Stressors Conservation Measures (CM13 to CM 21) Habitat Protection and Restoration Conservation Measures (CM2 to CM12) Water Facility Conveyance (CM1, CM22) CapitalCosts (MillionsofUndiscounted2012Dollars) Plan Years Estimated Capital Costs in 5-Year Increments Source: BDCP Executive Summary, Page 28
  • 17. 17 $- $100 $200 $300 $400 $500 $600 1-5 6-10 11-15 16-20 21-25 26-30 31-35 36-40 41-45 46-50 Habitat Protection and Restoration Conservation Measures (CM2 to CM12) Other Stressors Conservation Measures (CM13 to CM 21) Water Facility Conveyance (CM1, CM22) Program Costs (Administration, Monitoring, Research, Other) CapitalCosts (MillionsofUndiscounted2012Dollars) Plan Years Estimated Operational Costs in 5-Year Increments Source: BDCP Executive Summary, Page 28
  • 18.  Unclear whether reliance on federal funding and future state bonds will meet the “adequate funding” test for permit issuance  BDCP public draft indicates that if a shortfall in state or federal funding occurs ◦ Authorized entities will not be required to provide land, water, or monetary resources beyond their commitment in the Plan 18
  • 19.  BDCP public draft indicates the SWP share of new water conveyance system costs could be paid similar to how existing SWP is being paid for ◦ DWR-issued revenue bonds ◦ Take-or-pay contracts for participating SWP contractors ◦ SWP contracts will need to be amended to allow costs to be financed beyond current term of 2035  Individual contractors may issue their own revenue bonds or collectively through a JPA ◦ BDCP public draft identifies State and Federal Water Contractors Water Agency as possible JPA to finance project  JPA formed in 2009 – majority of SWP/CVP contractors are members 19
  • 20.  Incremental unit costs for MWD depend on benefit it receives from BDCP yield ◦ Consumptive need for water ◦ Ability to place water in storage when available  High outflow scenario = 1.2 MAF average annual benefit compared with no action  Low outflow scenario = 1.7 MAF average annual benefit compared with no action  Range of potential average annual benefit to MWD = 299,000 acre-feet to 424,000 acre-feet 20
  • 21.  Aggregate annual debt service and operations costs for the conveyance facility only ◦ Average annual capital debt service costs are approx $1.1 billion from 2021 through 2055 21 $0 $200 $400 $600 $800 $1,000 $1,200 $1,400 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 2052 2054 2056 2058 2060 2062 2064 $inMillions Figure 4 Aggregate Debt & Operations (Conveyance only) Debt serv O&M
  • 22.  Aggregate annual debt service and operations costs for conveyance plus habitat restoration ◦ Average annual capital debt service costs are approx $1.6 billion from 2021 through 2055 22 $0 $200 $400 $600 $800 $1,000 $1,200 $1,400 $1,600 $1,800 $2,000 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 2052 2054 2056 2058 2060 2062 2064 $inMillions Figure 5 Aggregate Debt & Operations (Conveyance and Habitat) Debt Serv (CM1) Debt Serv (Habitat) O&M (CM1) O&M (Habitat)