                          Definitions
       Terminology is sometimes confusing between
             American & European standards
American Standard                      European Standards
          Conformity checks & static de-energized test.
 •Mechanical Completion              •Precommissioning

    Dynamic verification, on-line test & pre start-up activities
     •Precommissioning               •Commissioning

       Plant initial start-up introducing hydrocarbons
         •Commissioning              •Start-up

                                                                   1
Typical Project Phases (European terminology)

                PRE-     BASIC         DETAILED
Engineering   PROJECT ENGINEERING    ENGINEERING

                            Long
                             Lead      PROCUREMENT
          Procurement       Items

                                           CONSTRUCTION            MECHANICAL
                                                                   COMPLETION
                      Construction     Precom       Precom              =
                                                                    READY FOR
                                       Prepa.      Execution      COMMISSIONING


                                             Comm          Comm           READY FOR
                                                                           START-UP
                        Commissioning        Prepa.       Execution


                                                                           ROUTINE
                                                               START-UP
                                                                          OPERATION



                                                                              2
PT. TEKNIKA REGULINDO ASIA
One Wolter Place Building 4th Floor
Jl. Wolter Monginsidi 63B Kebayoran Baru
Jakarta. 12180, Indonesia.
Phone : +62(0)21 7280 1162
Fax : +62(0)21 7280 1163
www.tra-indonesia.com
Piping – Mechanical – Electrical – Instrument – Control System - Telecommunication




                                                                                     3

More Related Content

What's hot

Mechanical completion
Mechanical completionMechanical completion
Mechanical completion
Ronie Chu
 
Ptw loto training
Ptw loto trainingPtw loto training
Ptw loto training
umar farooq
 
HYDROSTATIC TESTING
HYDROSTATIC TESTINGHYDROSTATIC TESTING
HYDROSTATIC TESTING
Paul Sumal
 
CV Oil and Gas Field Operator Nishanth P Joy
CV Oil and Gas Field Operator Nishanth P JoyCV Oil and Gas Field Operator Nishanth P Joy
CV Oil and Gas Field Operator Nishanth P Joy
NISHANTH JOY
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
Surya Kant
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Varun Patel
 

What's hot (20)

Mechanical Completions
Mechanical CompletionsMechanical Completions
Mechanical Completions
 
7) hydro test 3
7) hydro test 37) hydro test 3
7) hydro test 3
 
Testing And Commissioning
Testing And CommissioningTesting And Commissioning
Testing And Commissioning
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completion
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completion
 
Ptw loto training
Ptw loto trainingPtw loto training
Ptw loto training
 
Hydrotest
HydrotestHydrotest
Hydrotest
 
Piping hydrotest
Piping hydrotestPiping hydrotest
Piping hydrotest
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
Commissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating ConsiderationsCommissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating Considerations
 
HAZARDS-Pneumatic Test(1)
HAZARDS-Pneumatic Test(1)HAZARDS-Pneumatic Test(1)
HAZARDS-Pneumatic Test(1)
 
HYDROSTATIC TESTING
HYDROSTATIC TESTINGHYDROSTATIC TESTING
HYDROSTATIC TESTING
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
Piping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning ProcedurePiping and Vessels Flushing and Cleaning Procedure
Piping and Vessels Flushing and Cleaning Procedure
 
190391352-Pressure-Testing.ppt
190391352-Pressure-Testing.ppt190391352-Pressure-Testing.ppt
190391352-Pressure-Testing.ppt
 
Pre commissioning
Pre commissioningPre commissioning
Pre commissioning
 
CV Oil and Gas Field Operator Nishanth P Joy
CV Oil and Gas Field Operator Nishanth P JoyCV Oil and Gas Field Operator Nishanth P Joy
CV Oil and Gas Field Operator Nishanth P Joy
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
 
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
Piping Training course-How to be an Expert in Pipe & Fittings for Oil & Gas c...
 

Viewers also liked

The commissioning process
The commissioning processThe commissioning process
The commissioning process
treshammedia
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
Nagesh H
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedure
ABVSAI
 

Viewers also liked (13)

The commissioning process
The commissioning processThe commissioning process
The commissioning process
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedure
 
Power Point On Hydrocarbon
Power Point On HydrocarbonPower Point On Hydrocarbon
Power Point On Hydrocarbon
 
Oil And Gas Processing
Oil And Gas ProcessingOil And Gas Processing
Oil And Gas Processing
 
Commissioning Plan Robert Thelander, Svenska kraftnät
Commissioning Plan Robert Thelander, Svenska kraftnät Commissioning Plan Robert Thelander, Svenska kraftnät
Commissioning Plan Robert Thelander, Svenska kraftnät
 
Hydrocarbons
HydrocarbonsHydrocarbons
Hydrocarbons
 
Petrolium and gas processing
Petrolium and gas processingPetrolium and gas processing
Petrolium and gas processing
 
Hydrocarbon preeti bhatt
Hydrocarbon preeti bhattHydrocarbon preeti bhatt
Hydrocarbon preeti bhatt
 
Hydrocarbons
HydrocarbonsHydrocarbons
Hydrocarbons
 
Hp 2011 Rph Refining Hydrocarbon Technologies Profiles
Hp 2011 Rph Refining Hydrocarbon Technologies ProfilesHp 2011 Rph Refining Hydrocarbon Technologies Profiles
Hp 2011 Rph Refining Hydrocarbon Technologies Profiles
 
The Future of Leadership Development
The Future of Leadership DevelopmentThe Future of Leadership Development
The Future of Leadership Development
 
E nodeb commissioning guide(v100r005c00 04)(pdf)-en
E nodeb commissioning guide(v100r005c00 04)(pdf)-enE nodeb commissioning guide(v100r005c00 04)(pdf)-en
E nodeb commissioning guide(v100r005c00 04)(pdf)-en
 

Similar to Precommissioning and Commissioning

Competentia Presentation
Competentia PresentationCompetentia Presentation
Competentia Presentation
kingk99
 
Enel's CCS Project Current Status Overview
Enel's CCS Project Current Status OverviewEnel's CCS Project Current Status Overview
Enel's CCS Project Current Status Overview
canaleenergia
 
Feed report
Feed report Feed report
Feed report
jadamsm
 
Project Management
Project ManagementProject Management
Project Management
btharp
 
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Denis Senin
 
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Versli Lietuva (Enterprise Lithuania)
 
50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT
Tilal Ahmed
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
Ankur Singh
 

Similar to Precommissioning and Commissioning (19)

Indian railways workshop accounts
Indian railways workshop accountsIndian railways workshop accounts
Indian railways workshop accounts
 
Competentia Presentation
Competentia PresentationCompetentia Presentation
Competentia Presentation
 
Enel's CCS Project Current Status Overview
Enel's CCS Project Current Status OverviewEnel's CCS Project Current Status Overview
Enel's CCS Project Current Status Overview
 
Dornan Engineering Company Brochure
Dornan Engineering Company BrochureDornan Engineering Company Brochure
Dornan Engineering Company Brochure
 
Ingenious Services Group, Llc 2012 Service Offerings Detail
Ingenious Services Group, Llc   2012 Service Offerings DetailIngenious Services Group, Llc   2012 Service Offerings Detail
Ingenious Services Group, Llc 2012 Service Offerings Detail
 
Internship Presentation - Siemens Malaysia
Internship Presentation - Siemens MalaysiaInternship Presentation - Siemens Malaysia
Internship Presentation - Siemens Malaysia
 
Feed report
Feed report Feed report
Feed report
 
Cv noor ali syarifudin
Cv noor ali syarifudinCv noor ali syarifudin
Cv noor ali syarifudin
 
Project Management
Project ManagementProject Management
Project Management
 
Hv Cable Testing
Hv Cable TestingHv Cable Testing
Hv Cable Testing
 
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
 
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
 
50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT50 MW METRO WIND POWER PROJECT
50 MW METRO WIND POWER PROJECT
 
100122 Hca Overview
100122 Hca Overview100122 Hca Overview
100122 Hca Overview
 
100122 Hca Overview
100122 Hca Overview100122 Hca Overview
100122 Hca Overview
 
Eng enyon ingeniería 2011
Eng enyon ingeniería 2011Eng enyon ingeniería 2011
Eng enyon ingeniería 2011
 
Eng enyon ingeniería 2011
Eng enyon ingeniería 2011Eng enyon ingeniería 2011
Eng enyon ingeniería 2011
 
NY_ CV
NY_ CVNY_ CV
NY_ CV
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 

Precommissioning and Commissioning

  • 1. Introduction Definitions Terminology is sometimes confusing between American & European standards American Standard European Standards Conformity checks & static de-energized test. •Mechanical Completion •Precommissioning Dynamic verification, on-line test & pre start-up activities •Precommissioning •Commissioning Plant initial start-up introducing hydrocarbons •Commissioning •Start-up 1
  • 2. Typical Project Phases (European terminology) PRE- BASIC DETAILED Engineering PROJECT ENGINEERING ENGINEERING Long Lead PROCUREMENT Procurement Items CONSTRUCTION MECHANICAL COMPLETION Construction Precom Precom = READY FOR Prepa. Execution COMMISSIONING Comm Comm READY FOR START-UP Commissioning Prepa. Execution ROUTINE START-UP OPERATION 2
  • 3. PT. TEKNIKA REGULINDO ASIA One Wolter Place Building 4th Floor Jl. Wolter Monginsidi 63B Kebayoran Baru Jakarta. 12180, Indonesia. Phone : +62(0)21 7280 1162 Fax : +62(0)21 7280 1163 www.tra-indonesia.com Piping – Mechanical – Electrical – Instrument – Control System - Telecommunication 3