Drawing a
Process Flow Diagram
What is a PFD
• A process flow diagram is a pictorial
representation of what is happening in a
process in a sequential order
• It is a snapshot of the process at the time
of inspection
• It is a paper based tool
Why Draw a PFD
• Industries do not know
– What is wasted
– Where is it generated
– How much is wasted
PFD for Cleaner Production
A simple diagram which uses only three
main symbols and one auxiliary symbol
Not to be confused with other types of
diagrams
Symbols to be Used
Rectangle is used for representing a process
step
Arrow is used to show link and direction
Ellipse represents the beginning and the
end of diagram
A
Circle (with character or sign) is used to
show continuation of a process
Tips in drawing a PFD
• List all the process steps prior to drawing PFD
• Break larger steps into simpler steps as much as
possible
• The PFD is drawn from top to bottom of a paper
• Arrows link process steps in sequential order
• Arrows linking process steps must always be
directed downwards (Top to Bottom PFD)
• Labour, Time and Capital equipment not
included as inputs or waste streams
• Inputs should be consumable items/material
only
Always Start With an Ellipse
• Draw an ellipse on the top of the page and
• Insert the name of the main raw material
which undergoes the change to form the
final product within it
Raw Peanuts
Drawing Process Steps
• Process steps (activities) are
depicted by rectangles
• Rectangles are drawn below
the elipse, one per process
step
• Sequential process steps
(are linked by downward
arrows
• Insert the name of the
process step inside the
rectangle
Storing
Raw Peanuts
De-shelling
Sorting
Frying
Indicating Resources Used
• Resources used are
known as INPUTS
• Inputs are indicated on the
left side of the rectangles
(process steps)
• Inward arrows are drawn
from each input material
towards the rectangle
• Inputs are consumable
material used to carry out
the change to the main
raw material at each
process step
Electricity
(Lighting)
LP Gas
Coconut Oil
Hot air
Storing
Raw Peanuts
De-shelling
Sorting
Frying
Electricity
(Lighting)
Electricity
(Lighting)
Indicating Waste Streams
• Waste streams are known as OUTPUTS
• Outputs are indicated on the right side
of the rectangle
• Outward arrows are drawn towards
each Output stream from the rectangle
• All waste stream generated at this point
should be indicated on the PFD
Shells
Spilt
nuts
Dust
Oil Spills
Nut spills
Oil Evaporation
Waste Heat
Excess gas
Over fried nuts
Storing
Raw Peanuts
De-shelling
Sorting
Frying
LP Gas
Coconut Oil
Hot air
Electricity
(Lighting)
Electricity
(Lighting)
Electricity
(Lighting)
Energy Loss
Foreign Matter
Spilt
nuts Dust
How to End the PFD
• The PFD is ended with
an elipse depicting the
finished product
Main Raw material
Finished product
Inputs Outputs
Shells
Spilt nuts
Dust
Oil Spills
Nut spills
Oil Evaporation
Waste Heat
Excess gas
Over fried nuts
Storing
Raw Peanuts
De-shelling
Sorting
Frying
LP Gas
Coconut Oil
Hot air
Electricity
(Lighting)
Electricity
(Lighting)
Electricity
(Lighting)
Energy Loss
Foreign Matter
Spilt nuts
Dust
Oil DrainingOil Paper Drained Oil
Used Oil Paper
Salting
Packing
Salt Spilt Salt
Spilt nuts
Packing Material Rejected Packing Material
Spilt Nuts
Overfilled packs
Fried Salted Peanuts
Continuation
• If one page is
insufficient to
complete the PFD,
use another.
• Do not try to draw
two PFDs on one
paper.
• Arrows are never
directed upwards
The following method is not correct
The following method though correct is
not preferred
The following method is correct and preferred
Major Raw Material
A
Page 1
Finished Product
A
Page 2
Repeated Processes
Filtering
Mixing
Bagasse
Juice 1
Water
Electrical
Energy
Sugar Cane
Crushing
Juice 2 Juice 3
Electrical
Energy
Filtering
BagasseElectrical
Energy
Mixing
Filtering
BagasseElectrical
Energy
Water
Electrical
Energy
Branching
Preparing
Dyeing Printing Bleaching
Combining
Dyeing Printing Bleaching
Finishing
Auxiliary Processes
• Auxiliary processes are those that support
the main process.
• They include cleaning, Bottle washing,
Steam Generation, Water treatment etc.
• PFD for Auxiliary processes should be
drawn separately and linked to the main
PFD
Chemical Spills
Waste
Chemicals
Cleaning
Chemical Washing
Hot water rinsing
First Washing
Bottles
Cleaned Bottles
B
Water
Electricity
(Lighting)
Electricity
(Lighting)
Electricity
(Lighting)
Electricity
(Lighting)
Chemicals
Hot Water
Energy Loss
Energy Loss
Water Spills
Waste Water
Energy Loss
Energy Loss
Hot Water Spills
Waste Water
Boiling
(Boiler)
Fuel
Chemicals
Air
Flue Gas loss
Radiation Heat loss
Steam Leaks
Blow-down loss
Water
Steam
A
Page 2
Mangoes
Washing
Peeling & Cutting
Crushing
Mixing
Page 1
Finished Product
Cooking
Cooling
Bottling
Labelling and Storing
Electricity
(Lighting)
WaterElectricity
(Lighting)
Electricity
Electricity
Steam
Electricity
Sugar
Electricity
Bottles
Electricity
Caps
Electricity
Labels
A
B
How to Indicate Cleaning Processes
• Pay attention to processes such as
cleaning operations
– Floor Cleaning
– Machine Cleaning
– Equipment Cleaning
• Such operations should also be indicated
on the PFD
This Method is Wrong!
Mangoes
Washing
Peeling & Cutting
Crushing
Mixing
Bottled Mango Juice
Cooking
Cooling
Bottling
Labelling and Storing
Electricity
(Lighting)
WaterElectricity
(Lighting)
Electricity
Electricity
Steam
Electricity
Sugar
Electricity
Bottles
Electricity
Caps
Electricity
Labels
A
B
Water
Detergents
How to Indicate Cleaning of the Juice Cooking Pan
Page 1
Mangoes
Washing
Peeling & Cutting
Crushing
Mixing
Bottled Mango Juice
Cooking
Cooling
Bottling
Labelling and Storing
Electricity
(Lighting)
WaterElectricity
(Lighting)
Electricity
Electricity
Steam
Electricity
Sugar
Electricity
Bottles
Electricity
Caps
Electricity
Labels
A
B
C
Page 2
Washing
Electricity
(Lighting)
C Pan Cleaning Process
Detergents
Hot Water
Energy Loss
Waste Water
Water Spills
Detergent Spills
PFDs for Services
• The PFD for a service
organization may be
drawn as a block
diagram/Unit Process
• These are prepared for
activities that do not
have sequential steps,
such as Boilers,
Housekeeping activities
in Hotels, Kitchen
activities in Hotels etc.
House keeping
Room
Cleaned Room
Energy
Room cleaning chemicals
Cotton Rags
Toilet cleaning chemicals
Tissue Paper
Toilet paper rolls
Use ofUse of
Raw MaterialsRaw Materials
ManufactureManufacture DistributionDistribution UseUse DisposalDisposal
Product Life CycleProduct Life Cycle
For PFDs are not drawn for products
We can draw Life Cycle Diagrams
Can we Draw PFDs for Products?
Wording
• All process steps are considered to be
dynamic (process step is taking place at
the time of observation)
• Therefore all steps are referred in present
continuous – Checking
Frying
Dyeing
Drying
• Do not Mention the equipment as the
process step
• These terms are wrong
- Dry - Dye - Fry
- Dried - Dyed - Fried
- Dryer - Dying Machine - Frying Pan
Additional points
• However small the resource quantity may
be indicate it on the PFD.
• However small the waste stream may be
indicate it on the PFD.
• When considering the process steps the
normal, abnormal, occasional ,accidental
and maintenance operations should also
be taken into account
Other Tools
Ecomapping - One little picture says more than a long
speech !
• A visual, simple and practical tool to analyse
and manage the environmental performance
of companies industries
• An easy, creative and systematic method of
obtaining environmental data
• An awareness - creation and learning tool
based on the physical reality of the company
• A dynamic inventory of the changes in the
environmental behaviour of the company
How to Use Eco-maps
• Indispensable materials
– A4 -sized paper and a photocopy machine.
• Time needed
– Less than one hour of work for each map.
• When to do it?
– After the end of the accounting year.
• How often should they be up-dated ?
– Once a year, or if the site is renovated, or activities are
extended.
• Filing
– With documentation for your environmental
management system, with your annual accounts .
• Who can use them?
– The maps can be used by many different types of
companies: from small manufacturing and service
companies to large structures and local authorities.
How to Eco-map
1. Prepare Map of the
urban situation
• Make a map of the site,
seen from above,
including car parks,
access areas, roads
and the surrounding
environment.
• It should show the real
situation.
2. Map of the site
• Draw the outline of the site
using a scale and showing the
interior spaces. This map
should be copied and will be the
basis for the work to be done.
• The maps should show the real
situation - they should be
simple, recognisable and in
proportion. Maps should have a
date, a name and a reference.
Integrate one or two significant
objects such as machines and
boilers, which will enable the
user to orient himself with the
site easily
• If the site covers very different
areas, individual maps of the
different areas can be prepared
and brought together.
3. Symbols
• Develop your own
symbols, but use at least
two Hatched lines: small
problem (area to be
monitored, problem to be
studied)
• Circle: large problem
(stop, corrective action)
• The more serious the
problem, the thicker the
circle
Case Study

More Related Content

What's hot

Recording techniques used in method study ppt
Recording techniques used in method study pptRecording techniques used in method study ppt
Recording techniques used in method study pptBeereddy Swapna
 
Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturinglakshya bhardwaj
 
Lecture # 05 Post processing of AM parts
Lecture # 05 Post processing of AM partsLecture # 05 Post processing of AM parts
Lecture # 05 Post processing of AM partsSolomon Tekeste
 
Treatment of Effluents from Petroleum Refineries
Treatment of Effluents from Petroleum RefineriesTreatment of Effluents from Petroleum Refineries
Treatment of Effluents from Petroleum RefineriesAsheesh Padiyar
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overviewPruek Pinyo
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_previewJaroslaw Gadek, MBA
 
Design of packed columns
Design of packed columnsDesign of packed columns
Design of packed columnsalsyourih
 
PROCESS PLANNING AND COST ESTIMATION 5 UNITS PPT
PROCESS PLANNING AND COST ESTIMATION 5 UNITS PPTPROCESS PLANNING AND COST ESTIMATION 5 UNITS PPT
PROCESS PLANNING AND COST ESTIMATION 5 UNITS PPTFelix John
 
Uasb water treatment process
Uasb water treatment processUasb water treatment process
Uasb water treatment processSakil Ahmed
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozenavijit biswas
 

What's hot (20)

Recording techniques used in method study ppt
Recording techniques used in method study pptRecording techniques used in method study ppt
Recording techniques used in method study ppt
 
Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturing
 
Lecture # 05 Post processing of AM parts
Lecture # 05 Post processing of AM partsLecture # 05 Post processing of AM parts
Lecture # 05 Post processing of AM parts
 
L 30 fertilizer industry
L 30 fertilizer industryL 30 fertilizer industry
L 30 fertilizer industry
 
Treatment of Effluents from Petroleum Refineries
Treatment of Effluents from Petroleum RefineriesTreatment of Effluents from Petroleum Refineries
Treatment of Effluents from Petroleum Refineries
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean basics
Lean basicsLean basics
Lean basics
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_preview
 
Design of packed columns
Design of packed columnsDesign of packed columns
Design of packed columns
 
Life Cycle Assessment (LCA)
Life Cycle Assessment (LCA)Life Cycle Assessment (LCA)
Life Cycle Assessment (LCA)
 
SMED-Observation Training
SMED-Observation TrainingSMED-Observation Training
SMED-Observation Training
 
Machine operations
Machine operationsMachine operations
Machine operations
 
PROCESS PLANNING AND COST ESTIMATION 5 UNITS PPT
PROCESS PLANNING AND COST ESTIMATION 5 UNITS PPTPROCESS PLANNING AND COST ESTIMATION 5 UNITS PPT
PROCESS PLANNING AND COST ESTIMATION 5 UNITS PPT
 
Uasb water treatment process
Uasb water treatment processUasb water treatment process
Uasb water treatment process
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Basic Elements of Lean
Basic Elements of LeanBasic Elements of Lean
Basic Elements of Lean
 
Spray metal tooling
Spray metal toolingSpray metal tooling
Spray metal tooling
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
Characteristics of Textile Sludge
Characteristics of Textile Sludge Characteristics of Textile Sludge
Characteristics of Textile Sludge
 

Viewers also liked

01 chapter01 process_flow_diagram
01 chapter01 process_flow_diagram01 chapter01 process_flow_diagram
01 chapter01 process_flow_diagramJohn Todora
 
02 chapter02 p&ids_and_symbols_split_animations
02 chapter02 p&ids_and_symbols_split_animations02 chapter02 p&ids_and_symbols_split_animations
02 chapter02 p&ids_and_symbols_split_animationsJohn Todora
 
Business power point templates vertical steps process flow diagram sales ppt ...
Business power point templates vertical steps process flow diagram sales ppt ...Business power point templates vertical steps process flow diagram sales ppt ...
Business power point templates vertical steps process flow diagram sales ppt ...SlideTeam.net
 
Data Flow Diagram (DFD)
Data Flow Diagram (DFD)Data Flow Diagram (DFD)
Data Flow Diagram (DFD)sadique_ghitm
 
Chap3 flow charts
Chap3 flow chartsChap3 flow charts
Chap3 flow chartsamit139
 
Business process diagram career analysis
Business process diagram   career analysisBusiness process diagram   career analysis
Business process diagram career analysisSuparna K
 
Design & Engineering proces Development
Design & Engineering proces DevelopmentDesign & Engineering proces Development
Design & Engineering proces DevelopmentJan Koskenmäki
 
Download flow diverging arrow process 7 stages circular network power point t...
Download flow diverging arrow process 7 stages circular network power point t...Download flow diverging arrow process 7 stages circular network power point t...
Download flow diverging arrow process 7 stages circular network power point t...SlideTeam.net
 
Directi Case Study Contest 2010- XLRI ViniVidiVici
Directi Case Study Contest 2010- XLRI ViniVidiViciDirecti Case Study Contest 2010- XLRI ViniVidiVici
Directi Case Study Contest 2010- XLRI ViniVidiViciDirecti Group
 
When is a U value real?
When is a U value real?When is a U value real?
When is a U value real?Colt UK
 
Construction Engineering Technology
Construction Engineering TechnologyConstruction Engineering Technology
Construction Engineering Technologycarlsandburg
 
Cpl Science, Engineering & Construction Brochure 2014
Cpl Science, Engineering & Construction Brochure 2014Cpl Science, Engineering & Construction Brochure 2014
Cpl Science, Engineering & Construction Brochure 2014Shane Grennan
 
Dean’s Honor List - Fall 2016
Dean’s Honor List - Fall 2016Dean’s Honor List - Fall 2016
Dean’s Honor List - Fall 2016Robert Nather
 
M.Tech. Programme in Sustainable
M.Tech. Programme in Sustainable M.Tech. Programme in Sustainable
M.Tech. Programme in Sustainable Cochin University
 
Food Safety Auditing - Practice and Principles
Food Safety Auditing - Practice and PrinciplesFood Safety Auditing - Practice and Principles
Food Safety Auditing - Practice and Principlessafefood360
 

Viewers also liked (20)

01 chapter01 process_flow_diagram
01 chapter01 process_flow_diagram01 chapter01 process_flow_diagram
01 chapter01 process_flow_diagram
 
Criteria for a good process flow diagram (PFD)
Criteria for a good process flow diagram (PFD)Criteria for a good process flow diagram (PFD)
Criteria for a good process flow diagram (PFD)
 
02 chapter02 p&ids_and_symbols_split_animations
02 chapter02 p&ids_and_symbols_split_animations02 chapter02 p&ids_and_symbols_split_animations
02 chapter02 p&ids_and_symbols_split_animations
 
Business power point templates vertical steps process flow diagram sales ppt ...
Business power point templates vertical steps process flow diagram sales ppt ...Business power point templates vertical steps process flow diagram sales ppt ...
Business power point templates vertical steps process flow diagram sales ppt ...
 
Data Flow Diagram (DFD)
Data Flow Diagram (DFD)Data Flow Diagram (DFD)
Data Flow Diagram (DFD)
 
Chap3 flow charts
Chap3 flow chartsChap3 flow charts
Chap3 flow charts
 
Flowchart
FlowchartFlowchart
Flowchart
 
Business process diagram career analysis
Business process diagram   career analysisBusiness process diagram   career analysis
Business process diagram career analysis
 
7 QC Tools
7 QC Tools7 QC Tools
7 QC Tools
 
Design & Engineering proces Development
Design & Engineering proces DevelopmentDesign & Engineering proces Development
Design & Engineering proces Development
 
Pmengineers
PmengineersPmengineers
Pmengineers
 
Resume - Rodennel Alcantara
Resume - Rodennel AlcantaraResume - Rodennel Alcantara
Resume - Rodennel Alcantara
 
Download flow diverging arrow process 7 stages circular network power point t...
Download flow diverging arrow process 7 stages circular network power point t...Download flow diverging arrow process 7 stages circular network power point t...
Download flow diverging arrow process 7 stages circular network power point t...
 
Directi Case Study Contest 2010- XLRI ViniVidiVici
Directi Case Study Contest 2010- XLRI ViniVidiViciDirecti Case Study Contest 2010- XLRI ViniVidiVici
Directi Case Study Contest 2010- XLRI ViniVidiVici
 
When is a U value real?
When is a U value real?When is a U value real?
When is a U value real?
 
Construction Engineering Technology
Construction Engineering TechnologyConstruction Engineering Technology
Construction Engineering Technology
 
Cpl Science, Engineering & Construction Brochure 2014
Cpl Science, Engineering & Construction Brochure 2014Cpl Science, Engineering & Construction Brochure 2014
Cpl Science, Engineering & Construction Brochure 2014
 
Dean’s Honor List - Fall 2016
Dean’s Honor List - Fall 2016Dean’s Honor List - Fall 2016
Dean’s Honor List - Fall 2016
 
M.Tech. Programme in Sustainable
M.Tech. Programme in Sustainable M.Tech. Programme in Sustainable
M.Tech. Programme in Sustainable
 
Food Safety Auditing - Practice and Principles
Food Safety Auditing - Practice and PrinciplesFood Safety Auditing - Practice and Principles
Food Safety Auditing - Practice and Principles
 

Similar to Draw Process Flow Diagram (PFD) and Eco-Map

Lean Management & TPS Tools
Lean Management & TPS ToolsLean Management & TPS Tools
Lean Management & TPS Toolsshankar11122
 
Chapter 5 - Writing Business Plan - Production Plan
Chapter 5 - Writing Business Plan - Production PlanChapter 5 - Writing Business Plan - Production Plan
Chapter 5 - Writing Business Plan - Production PlanKathlyn Aragon
 
Process flow and process chart
Process flow and process chartProcess flow and process chart
Process flow and process chartParvesh Mittal
 
Standard work training
Standard work trainingStandard work training
Standard work trainingdnachreiner
 
289158090_Classic_Pen_Company_Case__1_.pptx.pdf
289158090_Classic_Pen_Company_Case__1_.pptx.pdf289158090_Classic_Pen_Company_Case__1_.pptx.pdf
289158090_Classic_Pen_Company_Case__1_.pptx.pdfluxasuhi
 
Presentation on Lean Manufacturing and waste elimination
Presentation on Lean Manufacturing and waste eliminationPresentation on Lean Manufacturing and waste elimination
Presentation on Lean Manufacturing and waste eliminationshivithakur110
 
5S Visual Control 7QC tools
5S  Visual Control  7QC tools5S  Visual Control  7QC tools
5S Visual Control 7QC toolsVarmahk
 
Work Experience Presentation version 1
Work Experience Presentation version 1Work Experience Presentation version 1
Work Experience Presentation version 1Karambir Sidhu
 
Workplace management : 5S / Visual Control
Workplace management :  5S / Visual ControlWorkplace management :  5S / Visual Control
Workplace management : 5S / Visual ControlVarmahk
 
5 s and lean manufacturing
5 s and lean manufacturing5 s and lean manufacturing
5 s and lean manufacturingNouman Ali
 
Operation mangement concepts
Operation mangement conceptsOperation mangement concepts
Operation mangement conceptsSansar Birman
 
Simple Lean Value and Waste Training
Simple Lean Value and Waste TrainingSimple Lean Value and Waste Training
Simple Lean Value and Waste TrainingRomains Bos, PMP, MBA
 
ACT 333__Cost accounting report on fountain
ACT 333__Cost accounting report on fountainACT 333__Cost accounting report on fountain
ACT 333__Cost accounting report on fountainKhorsed Prince
 
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUSTInternship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUSTHamza Nasir
 
production-180404033805 (1).pptx
production-180404033805 (1).pptxproduction-180404033805 (1).pptx
production-180404033805 (1).pptxsadiqfarhan2
 

Similar to Draw Process Flow Diagram (PFD) and Eco-Map (20)

Lean Management & TPS Tools
Lean Management & TPS ToolsLean Management & TPS Tools
Lean Management & TPS Tools
 
Chapter 5 - Writing Business Plan - Production Plan
Chapter 5 - Writing Business Plan - Production PlanChapter 5 - Writing Business Plan - Production Plan
Chapter 5 - Writing Business Plan - Production Plan
 
Process flow and process chart
Process flow and process chartProcess flow and process chart
Process flow and process chart
 
Ent300 Module09
Ent300 Module09Ent300 Module09
Ent300 Module09
 
Standard work training
Standard work trainingStandard work training
Standard work training
 
289158090_Classic_Pen_Company_Case__1_.pptx.pdf
289158090_Classic_Pen_Company_Case__1_.pptx.pdf289158090_Classic_Pen_Company_Case__1_.pptx.pdf
289158090_Classic_Pen_Company_Case__1_.pptx.pdf
 
Presentation on Lean Manufacturing and waste elimination
Presentation on Lean Manufacturing and waste eliminationPresentation on Lean Manufacturing and waste elimination
Presentation on Lean Manufacturing and waste elimination
 
Process Flow Mapping
Process Flow MappingProcess Flow Mapping
Process Flow Mapping
 
5S Visual Control 7QC tools
5S  Visual Control  7QC tools5S  Visual Control  7QC tools
5S Visual Control 7QC tools
 
Work Experience Presentation version 1
Work Experience Presentation version 1Work Experience Presentation version 1
Work Experience Presentation version 1
 
Eco friendly recycled paper
Eco friendly recycled paperEco friendly recycled paper
Eco friendly recycled paper
 
Workplace management : 5S / Visual Control
Workplace management :  5S / Visual ControlWorkplace management :  5S / Visual Control
Workplace management : 5S / Visual Control
 
5 s and lean manufacturing
5 s and lean manufacturing5 s and lean manufacturing
5 s and lean manufacturing
 
What is Industial Engineering
What is Industial EngineeringWhat is Industial Engineering
What is Industial Engineering
 
Operation mangement concepts
Operation mangement conceptsOperation mangement concepts
Operation mangement concepts
 
Simple Lean Value and Waste Training
Simple Lean Value and Waste TrainingSimple Lean Value and Waste Training
Simple Lean Value and Waste Training
 
Lean with green
Lean with greenLean with green
Lean with green
 
ACT 333__Cost accounting report on fountain
ACT 333__Cost accounting report on fountainACT 333__Cost accounting report on fountain
ACT 333__Cost accounting report on fountain
 
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUSTInternship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
 
production-180404033805 (1).pptx
production-180404033805 (1).pptxproduction-180404033805 (1).pptx
production-180404033805 (1).pptx
 

More from zubeditufail

International Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfInternational Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfzubeditufail
 
The Holy Quran with Easy Word Meaning
The Holy Quran with Easy Word MeaningThe Holy Quran with Easy Word Meaning
The Holy Quran with Easy Word Meaningzubeditufail
 
Use of fungus bricks in construction sector
Use of fungus bricks in construction sectorUse of fungus bricks in construction sector
Use of fungus bricks in construction sectorzubeditufail
 
SPMC training iso 45001 awareness
SPMC training iso 45001 awarenessSPMC training iso 45001 awareness
SPMC training iso 45001 awarenesszubeditufail
 
SPMC - Pakistan training iso 14001 EMS awareness
SPMC - Pakistan training iso 14001 EMS awarenessSPMC - Pakistan training iso 14001 EMS awareness
SPMC - Pakistan training iso 14001 EMS awarenesszubeditufail
 
SPMC - Pakistan training iso 9001 QMS awareness
SPMC - Pakistan training iso 9001 QMS awarenessSPMC - Pakistan training iso 9001 QMS awareness
SPMC - Pakistan training iso 9001 QMS awarenesszubeditufail
 
SPMC - Pakistan Training Calendar 2020
SPMC - Pakistan Training Calendar 2020SPMC - Pakistan Training Calendar 2020
SPMC - Pakistan Training Calendar 2020zubeditufail
 
ISO 9001:2015 Life Cycle
ISO 9001:2015 Life Cycle ISO 9001:2015 Life Cycle
ISO 9001:2015 Life Cycle zubeditufail
 
CODEX HACCP Short Introduction
CODEX HACCP Short Introduction CODEX HACCP Short Introduction
CODEX HACCP Short Introduction zubeditufail
 
Pakistan Income Tax Ordinance amendment 2016
Pakistan Income Tax Ordinance amendment 2016Pakistan Income Tax Ordinance amendment 2016
Pakistan Income Tax Ordinance amendment 2016zubeditufail
 
Heat stroke by SPMCpk.com
Heat stroke by SPMCpk.comHeat stroke by SPMCpk.com
Heat stroke by SPMCpk.comzubeditufail
 
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEAPPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEzubeditufail
 
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)zubeditufail
 
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...zubeditufail
 
Ohsas 18001 self assessment checklist
Ohsas 18001 self assessment checklistOhsas 18001 self assessment checklist
Ohsas 18001 self assessment checklistzubeditufail
 
Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...
Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...
Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...zubeditufail
 
A global standard_for_the_identification_of_key_biodiversity_areas_final_web
A global standard_for_the_identification_of_key_biodiversity_areas_final_webA global standard_for_the_identification_of_key_biodiversity_areas_final_web
A global standard_for_the_identification_of_key_biodiversity_areas_final_webzubeditufail
 
The Daily Dawn newspaper - millineium development goals report - Pakistan
The Daily Dawn newspaper - millineium development goals report - PakistanThe Daily Dawn newspaper - millineium development goals report - Pakistan
The Daily Dawn newspaper - millineium development goals report - Pakistanzubeditufail
 
shehri Letter to sepa
shehri Letter to sepashehri Letter to sepa
shehri Letter to sepazubeditufail
 
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...zubeditufail
 

More from zubeditufail (20)

International Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfInternational Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdf
 
The Holy Quran with Easy Word Meaning
The Holy Quran with Easy Word MeaningThe Holy Quran with Easy Word Meaning
The Holy Quran with Easy Word Meaning
 
Use of fungus bricks in construction sector
Use of fungus bricks in construction sectorUse of fungus bricks in construction sector
Use of fungus bricks in construction sector
 
SPMC training iso 45001 awareness
SPMC training iso 45001 awarenessSPMC training iso 45001 awareness
SPMC training iso 45001 awareness
 
SPMC - Pakistan training iso 14001 EMS awareness
SPMC - Pakistan training iso 14001 EMS awarenessSPMC - Pakistan training iso 14001 EMS awareness
SPMC - Pakistan training iso 14001 EMS awareness
 
SPMC - Pakistan training iso 9001 QMS awareness
SPMC - Pakistan training iso 9001 QMS awarenessSPMC - Pakistan training iso 9001 QMS awareness
SPMC - Pakistan training iso 9001 QMS awareness
 
SPMC - Pakistan Training Calendar 2020
SPMC - Pakistan Training Calendar 2020SPMC - Pakistan Training Calendar 2020
SPMC - Pakistan Training Calendar 2020
 
ISO 9001:2015 Life Cycle
ISO 9001:2015 Life Cycle ISO 9001:2015 Life Cycle
ISO 9001:2015 Life Cycle
 
CODEX HACCP Short Introduction
CODEX HACCP Short Introduction CODEX HACCP Short Introduction
CODEX HACCP Short Introduction
 
Pakistan Income Tax Ordinance amendment 2016
Pakistan Income Tax Ordinance amendment 2016Pakistan Income Tax Ordinance amendment 2016
Pakistan Income Tax Ordinance amendment 2016
 
Heat stroke by SPMCpk.com
Heat stroke by SPMCpk.comHeat stroke by SPMCpk.com
Heat stroke by SPMCpk.com
 
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCEAPPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
APPLICATION IN FORM - I FOR PRIOR ENVIRONMENTAL CLEARANCE
 
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
 
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
Environmental and Social Management Framework (ESMF) - Karachi Neighborhood I...
 
Ohsas 18001 self assessment checklist
Ohsas 18001 self assessment checklistOhsas 18001 self assessment checklist
Ohsas 18001 self assessment checklist
 
Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...
Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...
Draft2 guiding principles_and_recommendations_for_businesses_in_and_around_kb...
 
A global standard_for_the_identification_of_key_biodiversity_areas_final_web
A global standard_for_the_identification_of_key_biodiversity_areas_final_webA global standard_for_the_identification_of_key_biodiversity_areas_final_web
A global standard_for_the_identification_of_key_biodiversity_areas_final_web
 
The Daily Dawn newspaper - millineium development goals report - Pakistan
The Daily Dawn newspaper - millineium development goals report - PakistanThe Daily Dawn newspaper - millineium development goals report - Pakistan
The Daily Dawn newspaper - millineium development goals report - Pakistan
 
shehri Letter to sepa
shehri Letter to sepashehri Letter to sepa
shehri Letter to sepa
 
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
EIA of Engro Powergen Limited 450 MW RLNG CCPP at PQA, Karachi Sep 29, 2015 b...
 

Recently uploaded

5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdfsrivastavaakshat51
 
التغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصريالتغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصريRawhyaShaheen
 
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRCall In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRjennyeacort
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for fooddrsk203
 
Title-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptxTitle-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptxSagar Chaudhary
 
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girls
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call GirlsAl Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girls
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girlstiril72860
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Educationz xss
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Open Access Research Paper
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Open Access Research Paper
 
Perceptions and practices of rice farmers in the lowland areas of Diplahan, Z...
Perceptions and practices of rice farmers in the lowland areas of Diplahan, Z...Perceptions and practices of rice farmers in the lowland areas of Diplahan, Z...
Perceptions and practices of rice farmers in the lowland areas of Diplahan, Z...Open Access Research Paper
 
Available to Promise Oracle R12 ATP.pptx
Available to Promise Oracle R12 ATP.pptxAvailable to Promise Oracle R12 ATP.pptx
Available to Promise Oracle R12 ATP.pptxbskumar_slideshare
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxTesfahunTesema
 
Asexual-and-Sexual-Reproduction.huhupptx
Asexual-and-Sexual-Reproduction.huhupptxAsexual-and-Sexual-Reproduction.huhupptx
Asexual-and-Sexual-Reproduction.huhupptxMyBrightestStarParkJ
 
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEMINSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEMijsc
 
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作f3774p8b
 

Recently uploaded (20)

5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
5 Wondrous Places You Should Visit at Least Once in Your Lifetime (1).pdf
 
التغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصريالتغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصري
 
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree美国密苏里大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRCall In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
 
See How do animals kill their prey for food
See How do animals kill their prey for foodSee How do animals kill their prey for food
See How do animals kill their prey for food
 
Title-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptxTitle-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptx
 
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girls
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call GirlsAl Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girls
Al Jaddaf Housewife Call Girls +971509530047 Al Jaddaf Call Girls
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education
 
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesGwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Gwalior Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
 
Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...Determination of antibacterial activity of various broad spectrum antibiotics...
Determination of antibacterial activity of various broad spectrum antibiotics...
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...
 
Perceptions and practices of rice farmers in the lowland areas of Diplahan, Z...
Perceptions and practices of rice farmers in the lowland areas of Diplahan, Z...Perceptions and practices of rice farmers in the lowland areas of Diplahan, Z...
Perceptions and practices of rice farmers in the lowland areas of Diplahan, Z...
 
PLANTILLAS DE MEMORAMA CIENCIAS NATURALES
PLANTILLAS DE MEMORAMA CIENCIAS NATURALESPLANTILLAS DE MEMORAMA CIENCIAS NATURALES
PLANTILLAS DE MEMORAMA CIENCIAS NATURALES
 
Available to Promise Oracle R12 ATP.pptx
Available to Promise Oracle R12 ATP.pptxAvailable to Promise Oracle R12 ATP.pptx
Available to Promise Oracle R12 ATP.pptx
 
Limnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptxLimnology and Wetland Management 2023 NaRM.pptx
Limnology and Wetland Management 2023 NaRM.pptx
 
Asexual-and-Sexual-Reproduction.huhupptx
Asexual-and-Sexual-Reproduction.huhupptxAsexual-and-Sexual-Reproduction.huhupptx
Asexual-and-Sexual-Reproduction.huhupptx
 
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEMINSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
 
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
 

Draw Process Flow Diagram (PFD) and Eco-Map

  • 2. What is a PFD • A process flow diagram is a pictorial representation of what is happening in a process in a sequential order • It is a snapshot of the process at the time of inspection • It is a paper based tool
  • 3. Why Draw a PFD • Industries do not know – What is wasted – Where is it generated – How much is wasted
  • 4. PFD for Cleaner Production A simple diagram which uses only three main symbols and one auxiliary symbol Not to be confused with other types of diagrams
  • 5. Symbols to be Used Rectangle is used for representing a process step Arrow is used to show link and direction Ellipse represents the beginning and the end of diagram A Circle (with character or sign) is used to show continuation of a process
  • 6. Tips in drawing a PFD • List all the process steps prior to drawing PFD • Break larger steps into simpler steps as much as possible • The PFD is drawn from top to bottom of a paper • Arrows link process steps in sequential order • Arrows linking process steps must always be directed downwards (Top to Bottom PFD) • Labour, Time and Capital equipment not included as inputs or waste streams • Inputs should be consumable items/material only
  • 7. Always Start With an Ellipse • Draw an ellipse on the top of the page and • Insert the name of the main raw material which undergoes the change to form the final product within it Raw Peanuts
  • 8. Drawing Process Steps • Process steps (activities) are depicted by rectangles • Rectangles are drawn below the elipse, one per process step • Sequential process steps (are linked by downward arrows • Insert the name of the process step inside the rectangle Storing Raw Peanuts De-shelling Sorting Frying
  • 9. Indicating Resources Used • Resources used are known as INPUTS • Inputs are indicated on the left side of the rectangles (process steps) • Inward arrows are drawn from each input material towards the rectangle • Inputs are consumable material used to carry out the change to the main raw material at each process step Electricity (Lighting) LP Gas Coconut Oil Hot air Storing Raw Peanuts De-shelling Sorting Frying Electricity (Lighting) Electricity (Lighting)
  • 10. Indicating Waste Streams • Waste streams are known as OUTPUTS • Outputs are indicated on the right side of the rectangle • Outward arrows are drawn towards each Output stream from the rectangle • All waste stream generated at this point should be indicated on the PFD
  • 11. Shells Spilt nuts Dust Oil Spills Nut spills Oil Evaporation Waste Heat Excess gas Over fried nuts Storing Raw Peanuts De-shelling Sorting Frying LP Gas Coconut Oil Hot air Electricity (Lighting) Electricity (Lighting) Electricity (Lighting) Energy Loss Foreign Matter Spilt nuts Dust
  • 12. How to End the PFD • The PFD is ended with an elipse depicting the finished product Main Raw material Finished product Inputs Outputs
  • 13. Shells Spilt nuts Dust Oil Spills Nut spills Oil Evaporation Waste Heat Excess gas Over fried nuts Storing Raw Peanuts De-shelling Sorting Frying LP Gas Coconut Oil Hot air Electricity (Lighting) Electricity (Lighting) Electricity (Lighting) Energy Loss Foreign Matter Spilt nuts Dust Oil DrainingOil Paper Drained Oil Used Oil Paper Salting Packing Salt Spilt Salt Spilt nuts Packing Material Rejected Packing Material Spilt Nuts Overfilled packs Fried Salted Peanuts
  • 14. Continuation • If one page is insufficient to complete the PFD, use another. • Do not try to draw two PFDs on one paper. • Arrows are never directed upwards The following method is not correct
  • 15. The following method though correct is not preferred
  • 16. The following method is correct and preferred Major Raw Material A Page 1 Finished Product A Page 2
  • 17. Repeated Processes Filtering Mixing Bagasse Juice 1 Water Electrical Energy Sugar Cane Crushing Juice 2 Juice 3 Electrical Energy Filtering BagasseElectrical Energy Mixing Filtering BagasseElectrical Energy Water Electrical Energy
  • 20. Auxiliary Processes • Auxiliary processes are those that support the main process. • They include cleaning, Bottle washing, Steam Generation, Water treatment etc. • PFD for Auxiliary processes should be drawn separately and linked to the main PFD
  • 21. Chemical Spills Waste Chemicals Cleaning Chemical Washing Hot water rinsing First Washing Bottles Cleaned Bottles B Water Electricity (Lighting) Electricity (Lighting) Electricity (Lighting) Electricity (Lighting) Chemicals Hot Water Energy Loss Energy Loss Water Spills Waste Water Energy Loss Energy Loss Hot Water Spills Waste Water Boiling (Boiler) Fuel Chemicals Air Flue Gas loss Radiation Heat loss Steam Leaks Blow-down loss Water Steam A Page 2 Mangoes Washing Peeling & Cutting Crushing Mixing Page 1 Finished Product Cooking Cooling Bottling Labelling and Storing Electricity (Lighting) WaterElectricity (Lighting) Electricity Electricity Steam Electricity Sugar Electricity Bottles Electricity Caps Electricity Labels A B
  • 22. How to Indicate Cleaning Processes • Pay attention to processes such as cleaning operations – Floor Cleaning – Machine Cleaning – Equipment Cleaning • Such operations should also be indicated on the PFD
  • 23. This Method is Wrong! Mangoes Washing Peeling & Cutting Crushing Mixing Bottled Mango Juice Cooking Cooling Bottling Labelling and Storing Electricity (Lighting) WaterElectricity (Lighting) Electricity Electricity Steam Electricity Sugar Electricity Bottles Electricity Caps Electricity Labels A B Water Detergents
  • 24. How to Indicate Cleaning of the Juice Cooking Pan Page 1 Mangoes Washing Peeling & Cutting Crushing Mixing Bottled Mango Juice Cooking Cooling Bottling Labelling and Storing Electricity (Lighting) WaterElectricity (Lighting) Electricity Electricity Steam Electricity Sugar Electricity Bottles Electricity Caps Electricity Labels A B C Page 2 Washing Electricity (Lighting) C Pan Cleaning Process Detergents Hot Water Energy Loss Waste Water Water Spills Detergent Spills
  • 25. PFDs for Services • The PFD for a service organization may be drawn as a block diagram/Unit Process • These are prepared for activities that do not have sequential steps, such as Boilers, Housekeeping activities in Hotels, Kitchen activities in Hotels etc. House keeping Room Cleaned Room Energy Room cleaning chemicals Cotton Rags Toilet cleaning chemicals Tissue Paper Toilet paper rolls
  • 26. Use ofUse of Raw MaterialsRaw Materials ManufactureManufacture DistributionDistribution UseUse DisposalDisposal Product Life CycleProduct Life Cycle For PFDs are not drawn for products We can draw Life Cycle Diagrams Can we Draw PFDs for Products?
  • 27. Wording • All process steps are considered to be dynamic (process step is taking place at the time of observation) • Therefore all steps are referred in present continuous – Checking Frying Dyeing Drying
  • 28. • Do not Mention the equipment as the process step • These terms are wrong - Dry - Dye - Fry - Dried - Dyed - Fried - Dryer - Dying Machine - Frying Pan
  • 29. Additional points • However small the resource quantity may be indicate it on the PFD. • However small the waste stream may be indicate it on the PFD. • When considering the process steps the normal, abnormal, occasional ,accidental and maintenance operations should also be taken into account
  • 31. Ecomapping - One little picture says more than a long speech ! • A visual, simple and practical tool to analyse and manage the environmental performance of companies industries • An easy, creative and systematic method of obtaining environmental data • An awareness - creation and learning tool based on the physical reality of the company • A dynamic inventory of the changes in the environmental behaviour of the company
  • 32. How to Use Eco-maps • Indispensable materials – A4 -sized paper and a photocopy machine. • Time needed – Less than one hour of work for each map. • When to do it? – After the end of the accounting year. • How often should they be up-dated ? – Once a year, or if the site is renovated, or activities are extended. • Filing – With documentation for your environmental management system, with your annual accounts . • Who can use them? – The maps can be used by many different types of companies: from small manufacturing and service companies to large structures and local authorities.
  • 33. How to Eco-map 1. Prepare Map of the urban situation • Make a map of the site, seen from above, including car parks, access areas, roads and the surrounding environment. • It should show the real situation.
  • 34. 2. Map of the site • Draw the outline of the site using a scale and showing the interior spaces. This map should be copied and will be the basis for the work to be done. • The maps should show the real situation - they should be simple, recognisable and in proportion. Maps should have a date, a name and a reference. Integrate one or two significant objects such as machines and boilers, which will enable the user to orient himself with the site easily • If the site covers very different areas, individual maps of the different areas can be prepared and brought together.
  • 35. 3. Symbols • Develop your own symbols, but use at least two Hatched lines: small problem (area to be monitored, problem to be studied) • Circle: large problem (stop, corrective action) • The more serious the problem, the thicker the circle
  • 36.