Personal Information
Organization / Workplace
Myanmar Myanmar
Occupation
Attended Technological University of Meikhtila
About
Coordinating the preventive maintenance works consisting on monitoring the Gas Turbine parameters, vibration, temperature, analyzing the lube oil system for engine operation.Performing the inspection of the internal equipment of the Gas Turbine by Boroscope Inspection.
Inspection and check the alignment of the Pump, Motor, Gearbox and Pulley.
Inspection and check the vibration of the rotating equipment (Gas Turbine ...
Likes
(67)Trapped by MTBF
Accendo Reliability
•
11 years ago
Manual for liftket electrical chain hoist
Manuel Sotelo
•
9 years ago
S3 Lec 2 (Condenser) Note
no suhaila
•
10 years ago
21G86 refurbishment March 2013 - Nov 2015
Joe Edwards
•
8 years ago
Work carried out on 21G80 between October 2014 - Mar 15
Joe Edwards
•
8 years ago
Maintenance report of Debris Filter
Summit Power International https://summitpowerinternational.com/
•
11 years ago
Cooling tower cell h daily work report
Summit Power International https://summitpowerinternational.com/
•
10 years ago
Presentation on Air Heater Inspection
Summit Power International https://summitpowerinternational.com/
•
10 years ago
Maintenance report of Condensate Extraction Pump (KSB)
Summit Power International https://summitpowerinternational.com/
•
11 years ago
Maintenance report on Circulating Water Pump (CWP) Overhauling
Summit Power International https://summitpowerinternational.com/
•
4 years ago
Do's & dont's tool box talk -safety subject wise
Salim Solanki
•
7 years ago
Heat Exchangers
usmaan khawer
•
6 years ago
Gea phe operating_instruction_en
Manuel Sotelo
•
9 years ago
Gas turbine aeroderivative Module LM6000 PC
apri kartiwan
•
9 years ago
Final Report
Zaire Hasan
•
8 years ago
Turbine Governing System
Salil Vaidya
•
7 years ago
Grilletes y tensores gunnebo
GRUPO BACRUFLEX PERU
•
9 years ago
Tianjin Founder Metal Rigging hardware catalog
JudyFu5
•
5 years ago
Hp/ lp bypass system for steam turbines
Boben Anto Chemmannoor
•
6 years ago
How to respond_to_an_interview_invitation_via_e-ma
nishajj
•
6 years ago
Adv u10 email_style
AnjaliRamnani
•
2 years ago
Scaffolds Training by Pennsylvania L&I
Atlantic Training, LLC.
•
5 years ago
Email writting
Pravin Patil
•
7 years ago
Successful email phrases, by Helena Tomé
Helena M. Tomé
•
8 years ago
Work carried out on 21G20 in March 2013 - Copy
Joe Edwards
•
9 years ago
20130601 - Work carried out on 21G72
Joe Edwards
•
9 years ago
Technical Process Instruction Work Sample
Sharon O'Toole
•
8 years ago
Inspection, Testing and Maintenance of fire pump
klsmani
•
8 years ago
JD3_MS_Corrosion_Coupon_Analysis (10Dec15 to 24Jan16)
Muhammad Saqib Bashir
•
8 years ago
Fft ppt
Puneet Gupta
•
12 years ago
Personal Information
Organization / Workplace
Myanmar Myanmar
Occupation
Attended Technological University of Meikhtila
About
Coordinating the preventive maintenance works consisting on monitoring the Gas Turbine parameters, vibration, temperature, analyzing the lube oil system for engine operation.Performing the inspection of the internal equipment of the Gas Turbine by Boroscope Inspection.
Inspection and check the alignment of the Pump, Motor, Gearbox and Pulley.
Inspection and check the vibration of the rotating equipment (Gas Turbine ...